1、 Guidance Notes on Life Extension Methodology for Floating Production Installations GUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INSTALLATIONS MAY 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shippin
2、g. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword (1 May 2017) The Guidance Notes on Life Extension Methodology for Floating Production Installations have been developed to provide guidance for assessment of existing floating production installations wh
3、en the intended period of operation at the original site or the cumulated operating time at both the original and relocated sites is extended beyond the original design life period. These Guidance Notes supplement the requirements for life extension and relocation of floating production installation
4、s in accordance with the ABS Rules for Building and Classing Floating Production Installations (FPI Rules). These Guidance Notes outline the life extension process that includes a reassessment of the structure, mooring system, stability, and machinery and systems, etc., for the entire installation.
5、This reassessment includes engineering and survey activities. The following major changes are incorporated in this revision: In Section 2, two scenarios are considered separately when life extension is at the same location. For first life extension up to five years, an abbreviated approval procedure
6、 without reassessment may be followed. For life extension over five years, a general approval procedure is to be followed. New Section 7 introduces an alternative route for life extension when an installation is under Asset Integrity Management (AIM). These Guidance Notes become effective on the fir
7、st day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this version of these Guidance Notes is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. Terms of Use Th
8、e information presented herein is intended solely to assist the reader in the methodologies and/or techniques discussed. These Guidance Notes do not and cannot replace the analysis and/or advice of a qualified professional. It is the responsibility of the reader to perform their own assessment and o
9、btain professional advice. Information contained herein is considered to be pertinent at the time of publication, but may be invalidated as a result of subsequent legislations, regulations, standards, methods, and/or more updated information and the reader assumes full responsibility for compliance.
10、 This publication may not be copied or redistributed in part or in whole without prior written consent from ABS. ii ABSGUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INSTALLATIONS .2017 Table of Contents GUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INSTA
11、LLATIONS CONTENTS SECTION 1 Introduction 1 1 General . 1 SECTION 2 Life Extension Process Overview . 2 1 General . 2 3 Life Extension of Floating Production Installations . 2 3.1 Procedure for Life Extension up to 5 Years at the Same Location . 4 3.3 Procedure for Life Extension Over 5 Years at the
12、Same Location . 6 3.5 Life Extension Procedure for an Installation Relocating to a New Location . 8 3.7 Remaining Fatigue Life . 8 FIGURE 1A Life Extension Process Flow Chart Based on Phases 3 FIGURE 1B Life Extension Abbreviated Procedure (For life extension up to 5 years at the same location) . 5
13、FIGURE 1C Life Extension Procedure (For life extension of over 5 years at the same location) . 7 SECTION 3 Baseline Information 9 1 General . 9 1.1 Documentation to be Provided during Life Extension Process 9 1.3 Initial Assessment of Baseline Information 10 SECTION 4 Baseline Survey . 11 1 General
14、. 11 3 Structures 11 5 Mooring Systems 11 7 Tendons 12 9 Machinery and Systems 12 11 Outfitting 12 13 Additional Scope of Survey and Analysis . 13 ABSGUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INSTALLATIONS .2017 iii SECTION 5 Reassessment 14 1 General . 14 3 Environmental
15、Conditions . 14 5 Hull Structures 14 5.1 Ship-Type Installations 14 5.3 Non-Ship Type Installations . 15 5.5 Cathodic Protection Reassessment . 16 5.7 Stability Reassessment . 16 5.9 Review of Reassessment Results . 16 7 Hull Interface Structures . 17 7.1 Strength Reassessment 17 7.3 Remaining Fatig
16、ue Strength Assessment 17 7.5 Review of Reassessment Results . 17 9 Topside Structures 17 9.1 Strength Reassessment 17 9.3 Remaining Fatigue Strength Assessment for Non-Ship Type Installations 18 9.5 Review of Reassessment Results . 18 11 Mooring Systems 18 11.1 Reassessment Analysis . 18 11.3 Catho
17、dic Protection Reassessment . 18 11.5 Review of Reassessment Results . 18 13 TLP Tendons and Tendon Connectors . 19 13.1 Reassessment Analysis . 19 13.3 Cathodic Protection Reassessment . 19 13.5 Tendon Connectors with Nonmetallic Components . 19 13.7 Tendon Tension Monitoring Systems 19 13.9 Review
18、 of Reassessment Results . 19 15 Marine and Industrial Machinery and Systems . 19 TABLE 1 Extent of Strength and Fatigue Analysis Scenarios for Life Extension 15 SECTION 6 Additional Survey/Repairs/ISIP . 20 1 General . 20 3 Additional Surveys 20 5 Repairs and Modifications . 20 7 Revision of In-Ser
19、vice Inspection Plan (ISIP) . 20 SECTION 7 Asset Integrity Management (AIM) 21 1 General . 21 3 AIM Process 21 5 Life Extension in AIM Process 21 FIGURE 1 Assessment for Life Extension within the AIM Process 22 iv ABSGUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INSTALLATIONS
20、.2017 SECTION 8 Risk Assessment . 23 1 Risk Assessment 23 APPENDIX 1 Procedure for Fatigue Reassessment of Floating Production Installations (Except for Hull Structures of Ship-Type Installations) . 24 1 Remaining Fatigue Strength of Hull Structures and Hull Interface Structures Non-Ship Type Instal
21、lations 24 1.1 Accumulated Fatigue Damage Dp . 24 1.3 Safety Factors for Fatigue Life of the Accumulated Damages . 24 1.5 Predicted Damage for Life Extension 25 1.7 Remaining Fatigue Strength Check . 25 1.9 Calculation Example of Non-inspectable Critical Areas . 26 3 Remaining Fatigue Strength of To
22、pside Structures All FPIs and Major Hull Interface Structures Ship-Type Installations . 26 APPENDIX 2 Procedure for Strength and Fatigue Reassessment of Ship-Type FPIs . 27 1 General . 27 3 Initial Scantling Evaluation (ISE) for Life Extension 27 3.1 Strength Evaluation . 27 3.3 Simplified Fatigue E
23、valuation 27 5 Total Strength Assessment (Simplified Fatigue Analysis) for Life Extension 27 5.1 Model Requirements and Assessment Procedures for Life Extension . 27 5.3 Use of As-gauged Scantlings 28 5.5 Loads and Load Cases . 28 5.7 Fatigue Acceptance Criteria 28 7 Dynamic Loading Approach and Spe
24、ctral Fatigue Analyses for Life Extension . 29 7.1 Model Requirements and Reassessment Procedures 29 7.3 Loads and Load Cases . 29 7.5 Acceptance Criteria . 29 APPENDIX 3 References 30 1 Application of Codes and Standards 30 ABSGUIDANCE NOTES ON LIFE EXTENSION METHODOLOGY FOR FLOATING PRODUCTION INS
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
本资源只提供5页预览,全部文档请下载后查看!喜欢就下载吧,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2172017GUIDANCENOTESONLIFEEXTENSIONMETHODOLOGYFORFLOATINGPRODUCTIONINSTALLATIONSPDF

链接地址:http://www.mydoc123.com/p-400812.html