ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf

上传人:twoload295 文档编号:442387 上传时间:2018-11-15 格式:PDF 页数:7 大小:360.88KB
下载 相关 举报
ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf_第1页
第1页 / 共7页
ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf_第2页
第2页 / 共7页
ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf_第3页
第3页 / 共7页
ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf_第4页
第4页 / 共7页
ARMY MIL-D-45470-1960 DETONATOR ELECTRIC T76 METAL PARTS FOR《T76型电雷管金属零件》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、- 7 - -_ MIL-D-45470 13 970b 0307474 7 = 1. SCOPE DETiVATOR, ELECTRIC, T76 METAL PARTS DR 1.1 Thla specificetion covera the metal parta for one type of detonator dtaignated as Detonator, Electric, 176. 2. APPLICABLE DOCIMENTS 2.1 Tbc following documenta,of the iaaue in effect on date of invitation f

2、or bida,form a part of thla apccification: SPECIFICATIOBS W-T-111 - Tape, Paper, Gummed (Kraft) U-Bf631 - Boxee, Fiber, Corrugated (For Domeetic Sbipuent) MILITARY JAR-P-120 - Packaging aria Pecking for Overaeaa Shipment-Cartone, Ma-G-2550 - General Specification for Ammunition Except Smell Folding,

3、 Paperboard Army Antmunition. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL -D -45470 (Ord ) MILITARY MIL-STD-105 - MIL-STD-109 “ MIL-sm-129 - DRAWINGS Sampling Procedurce and Teblee for Inepection by Attrlbutee Inepection Terme and DefinitIone

4、 Harking for Shipnent and Storage ORDNACE CORPS 8826685 - Electric Detonator, 76, Aasembly PUBLX ATIONS OEIDPIAWE CORPS OI(D-M608-11 - Proceddree- and Tables for Continuous Sampling by Attribute0 IEL-8792231 - Index of Inopection Equipslent Lieto (Copies of epecifice tions, etendarde, drawinge and p

5、ublicstione required by contractors in connection with epecific procurement fuactione rhould be obtained from the procuring activity or se directed by the contracting officer .) 3.1 Material.-Materlele end perte ehall be in eccordence uitb applicable drawings end epecificationa. ed on 3*2 Drawing Me

6、4aT_pas_ dwg. 8826685, end with ell requirements epeciried in applicable epecificationa. 3.3 Workmanehip.-All perte ehall be free of chipe, dirt, rust, greeee and other foreign material. The cleaning method ueed shall not be InJurIoue to any of the parte nor ahall the parte be contamineted by the cl

7、eaning agente ueed. rta,+i%e metal perte shall comply with all requisemente epecifl- 4. QUALITY ASSURANCE PROVISIONS b .1 General quality aeaurence provialone. -The quality aesurance proviaioas of thie epeciflcation are appliceble to inepection perforsed by or for the Government. terme ueed herein.

8、cation, Specification MIL-G-2550 end other epeciiicetione referenced ia any of the contractual documents. Reference ehe11 be mede to Standard MU-SpD-lg in order to define Iniepection ehall be performed in eccordaace with tbie epecifi- 2 Provided by IHSNot for ResaleNo reproduction or networking perm

9、itted without license from IHS-,-,- MIL-D-45470 13 H 999990b 030747b O 4.1.1 Contractor inepection.-Unleas otherwiae specified herein, the supplier ia responeible for the performance of ail inspection requirements prior to submieeion for Government inppection and acceptance. Except ae otherwise spec

10、ified, the supplier mag utilize bis own facilities or any commercial laboratory acceptable to the Government. shall be kept complete and available to the Government ds specified in the contract or order . Inepection recorde of the examinatione and tests 4.1.2 Contractor quality aeeurance eystem.-The

11、 contractor eball provide and mintain an effective quality aeeurance eyetern acceptable to the GoverDmnt covering the eupplies procured under thie epecification and ehall perform all inspectione required by the system. A current written description of the system ahail be eubmitted fio the contractin

12、g officer, and meet his approval, prior to intietion of production. It shall incluae a deecriptlon covering controls for lot formation and ientification, inspectione to ber performed, inspection stations, sampling proceduree, methode of inspection (gagea, meaeuring and tehting equip- pent) an provie

13、ione for control and dispoeition of non-conforniag materia. The written deecription wil be considered acceptable when, a8 a minimum, it providea the quality eseurance required by the provisione of 4.2 and tbe otber documente referenced herein. Phe contractor shell not be restricted to the inspection

14、 station or the -tho8 of inepection lietea ia thie epecification provided that an equivalent control ia included in the approved quality aeeurance procedure. In caees of dispute a8 to whether certain proceduree of the contractors eyetern provide equal aeeurance, the comparable procedure of this epec

15、ification eball apply. The contractor shell notify the Government of, and obtain approval for, any cbange to the written procedure tbet affects tbe degree of aseurance required by th18 epecification OP other documente referenced herein. 4.1.3 Submiseion of product.-At the time the complete8 lot of p

16、roduct is eubmttted to the Government for acceptance the contractor ehall aupply the following information accompanied by a certificate which atteets that the infor- inetion provided ia correct end applicable to the product being eubmitted: of the approved current written description of the system.

17、a. A etatement that the lot compliee with allquelity aeeurance proviaions bo a. e. f. E. C. and date of contractor. Number of unite of product inspected. Reeults obtained for all inspection performed. Drawing, specification number and date together with an identification changea . Certificatea of an

18、alysis on ail material procured directly by the Humber of items in the lot. Deta eubmitted . The certificate ehall be eigned by a responeible agent of the certifying ization and ehallbe accompanied by evidence of the agente authority to his princiapevelC.-The inner cartons shall be constructed of i3

19、0 pound test paperboard complying with Style III, Type B, Class a, Specification JAN-P-120. The aside dimensions of the cartons shall be 7 1/2 by 7 1/2 by 3 1/4 inches. void space shall be filled with plain kraft paper to insure a tight pack. a carton constructed as specified .in 5.1.1. shallbe pack

20、aged in a carton constructed as specified in 5.1.1. corrugated fiberboard complying with Style RSC, Specification MIL-B- except that the body Joints of the carton shall be secured with metal staples or metal stitches regularly spaced not more than an average of 1 1/2 inches, center to center Any 5.i

21、.i.l Cups.-Ten thousand (10,000) cups plus average shall be packaged in 5.1.1.2 Plug assembly. -Ten thousand (10,OOO) plug assemblies plu8 average 5.2 Packing. 5.2.1 Level C.-The outer carton shall be constructed of 200 pound test 5.2.1.1 Cup and plug assembly.-Ten thousand (10,OOO) cups and ten tho

22、usand (10,OOO) plug aseembliee plus average in paperboard cartons (see 5.1.1.1 and 5.1.l.2) shall be packed in a corrugated fiberboard carton constructed es specified in 5.3. The inside dimensions of the carton shall be 7 3/4 by 7 3/4 by 7 1/2 inches. 5.3 Marking.-Marking of the containers shall be

23、as specified in Standerd NIL-STD-129. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-q5q70 13 m 777770b O307480 2 m MU-D-45470 (ora) 5.3.1 Exterior containere incloeing packagee prepnred for LevelC ahall be 5.4 Packing requirements.-All cart

24、on flaps shall meet when cloeed. A conepicuously marked MIR-Ma-PK. manufacturing tolerance of plue or aiinue 1/16 Inch ehe11 apply to all pecking msterial. ing materiale BO that proper fit of pecking materiale end metal parte cen be determined. Minor modifications of packing meteria1 dimeneione to p

25、rovide a pr- rit of all parte, a8 determined to be neceseary by examination of eample packs, are permieeible. Additional filler aaterialmay be used ea neceseary to ineure a tlght peck, 5.5 Sealing.-Ro eealing required for the inner cartone. The outer carton flaps ehall be secured with gunmied kraft

26、paper not leee then 3 inches wide caraplying with Federal Specification W-T-111 ror Clase 2 and 3 tape. centered the full length of the outer flap eeeme, and extend over each end of the carton at leeet 3 inchee. The flap edge eeame ehe11 be eimilerly sealed with the tape extending at leaat 3 inches

27、along the corner of the carton. properly moistened and eufficiently compreesed to insure tight adheeion to the carton. fXape may be glued using a suitable adheeive applied over at least 75 percent of the contact area between inner and outer flaps. When flaps are pulled apart after gluing, they shall

28、 show complete fiber failure in the glued area. 5.6 eame carrier, each lot muet be kept separate end short packed cartone placed in a consplcuoue location. The divieion betueen the lote muet be clearly indicated to prevent mixing of lote in traneit. 5.6.1 When feaeible, for emall and light weight pa

29、rte, the entire packing lot quantity including the percentage of extra parte shall be packed in the prime container. The parte rendor ehe11 be furniehed preproduction eamplee or all pack- The tape aha11 be Tape ehsll be Alternatively when acceptable to the inatallation ueing the metal parte, Sbippin

30、6.-When component parta fram more than one lot ere shipped in the 5.7 Data carde.-Data card informtion ehall be ae epecified in Specification MIL-G-2550, 6, NOTES 6.1 Ordering data. -Procurement documente should specify the title, number and date of this epecification. Aotice.-When Government drawin

31、gs, epecificatione, or other data are oeed for any purpoee other than in connection with a definitely related Government procurement operation, the United Statee Goverment thereby incurs no reeponeibility nor any obXigetion wheteoever; and the fact that the Government may have formulated, furnished,

32、 or in any way eupplied said drawings, epecificetions, or other data le not to be regarded by implication or otherwiee ea in any manner licensing the holder or any other pereon or corporation, or conveying any rtghte or permleeion to manufacture, uee, or eell any patented invention that may .in any way be related there to. Cu e tod ian : Army-Ordnance Corpe Prepr ing Activity : Army-rdnrnce Coxpa 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1