1、 Tentative Interim Amendment NFPA 70National Electrical Code2017 Edition Reference: 690.56(C) TIA 17-1 (SC 16-8-15 / TIA Log #1233) Note: Text of the TIA was issued and approved for incorporation into the document prior to printing. 1. Revise 690.56(C) to read as follows: (C) Buildings with Rapid Sh
2、utdown. Buildings with PV systems shall have permanent labels as described in 690.56(C)(1) through (C)(3). Issue Date: August 4, 2016 Effective Date: August 24, 2016 (Note: For further information on NFPA Codes and Standards, please see www.nfpa.org/docinfo) Copyright 2016 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION