ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:13.18KB ,
资源ID:1017670      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1017670.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-0016-1991 Lessons Learned - Reversed Installation of a Check Valve Spring (Main Propulsion) Subsequent Spring Failure and Uncontrollable Reverse Flow.pdf)为本站会员(吴艺期)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-0016-1991 Lessons Learned - Reversed Installation of a Check Valve Spring (Main Propulsion) Subsequent Spring Failure and Uncontrollable Reverse Flow.pdf

1、Lessons Learned Entry: 0016Lesson Info:a71 Lesson Number: 0016a71 Lesson Date: 1991-07-28a71 Submitting Organization: JSCa71 Submitted by: Donna CarrolSubject: Reversed Installation of a Check Valve Spring (Main Propulsion), Subsequent Spring Failure and Uncontrollable Reverse Flow Description of Dr

2、iving Event: When the shuttle orbiter main propulsion system oxygen manifold was pressurized to obtain gas samples, oxygen line to engine No. 3 also pressurized. The prevalves to all engines were closed and pressurization should not have occurred downstream of the prevalves. A small check valve is p

3、rovided parallel to each prevalve and allows expanding fluid trapped in the manifold legs of each engine, between the prevalves and the engine valves, to relieve back into the main manifold. Upon removal of the No. 3 check valve, it was discovered that the spring holding it closed was broken and had

4、 been installed backwards. The error in installation contributed to additional stresses on the spring during earlier flow tests that lead to this failure. If the faulty installation of the spring had remained undetected and the spring had failed during cryogenic operations, uncontrolled flows into t

5、he engine leg could have caused launch delays. An X-Ray technique was developed to inspect existing valves for proper installation of the springs. A mandatory inspection point was added to the fabrication assembly procedures to preclude installation errors for this spring.Lesson(s) Learned: An incor

6、rect installation of a critical component (orbiter main propulsion system check valve spring) can cause additional stresses, lead to a material failure, and result in costly launch delays.Recommendation(s): X-Ray techniques were developed and implemented to assure correct installation of existing ch

7、eck valve springs and a mandatory inspection point was added for the assembly of new valves.Evidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 E

8、xploration Systemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Aircrafta71 Cryogenic Systemsa71 Energetic Materials - Explosive/Propellant/Pyrotechnica71 Flight Operationsa71 Flight Equipmenta71 Ground Operationsa71 Ground Equipmenta71 Hardwarea71 Launch Vehiclea71 Parts

9、 Materials & Processesa71 Pressure Vesselsa71 SpacecraftAdditional Info: Approval Info: a71 Approval Date: 1993-09-10a71 Approval Name: Ron Montaguea71 Approval Organization: JSC/NS3a71 Approval Phone Number: 281-483-8576Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1