1、Lessons Learned Entry: 0107Lesson Info:a71 Lesson Number: 0107a71 Lesson Date: 1992-08-19a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: LH2 Leakage at the 8“ T-0 Flexhose QD/Interface Description of Driving Event: The 8 inch T-0 flexhose connects the tail service mast (TS
2、M) with the LH2 carrier plate. Due to mechanical design the interface connection is very poor. The LO2 interface is identical and has experienced leakage in the past. Undetected leakage could cause a major fire resulting loss of life or vehicle.Lesson(s) Learned: Lack of adequate LH2 Leak detection
3、at the 8 inch T-0 flexhose QD/interface could result in fire.Recommendation(s): Design/install a new leak detector sensor console to accommodate additional leak detectors.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AProvided by IHSNot fo
4、r ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Key Phrase(s): a71 Energetic Materials - Explosive/Propellant/Pyrotechnica71 Fire Protectiona71 Flight Equipmenta71 Ground Equipmenta71 Launch VehicleAdditional Info: Approval Info: a71 Approval Date: 1994-06-02a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-