1、Lessons Learned Entry: 0230Lesson Info:a71 Lesson Number: 0230a71 Lesson Date: 1992-11-25a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Operational Maintenance and Inspection Program (OMP) Description of Driving Event: Requirements for the operational era was introduced i
2、nto the system in early 1985. The foundation for the system, operations and maintenance requirements and specifications document, provides a sound base on which to build a mature system as future requirements are defined. Some problems have been encountered while progressing toward a mature system.
3、Implementation of newly defined requirements is not always accomplished according to an agreed upon plan that can be supported by all involved functional areas. Level II also lacks an active closed loop audit system to check the quality of compliance with established requirements. Additionally, ther
4、e is no baseline postflight turnaround schedule to use as a basis for tracking long-term trends in waivers, deferrals, additions, or deletions to the KSC flow.Lesson(s) Learned: The OMP inadequately provides Level II with closed loop oversight and lacks a comprehensive system to track and audit comp
5、liance with requirements.Recommendation(s): Implement an inspection and maintenance program that will ensure flawless performance of critical space shuttle hardware.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: Provided by IHSNot for ResaleNo reproduction or networkin
6、g permitted without license from IHS-,-,-N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Configuration Managementa71 Ground OperationsAdditional Info: Approval Info: a71 Approval Date: 1994-06-08a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-