ImageVerifierCode 换一换
格式:PDF , 页数:3 ,大小:15.03KB ,
资源ID:1017921      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1017921.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-0273--1993 Lessons Learned TOPEX POSEIDON Solar Array Drive (SAD) Drop.pdf)为本站会员(wealthynice100)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-0273--1993 Lessons Learned TOPEX POSEIDON Solar Array Drive (SAD) Drop.pdf

1、Lessons Learned Entry: 0273Lesson Info:a71 Lesson Number: 0273a71 Lesson Date: 1993-07-08a71 Submitting Organization: JPLa71 Submitted by: T. IskenderianSubject: TOPEX/POSEIDON Solar Array Drive (SAD) Drop Abstract: Two days prior to the planned delivery of the flight Solar Array Drive, the unit was

2、 accidentally dropped on the floor. An employee who was unfamiliar with the device tilted the assembly to take a measurement, unaware that the SAD was not fastened to the fixture. The recommendations center on training and procedures, examination of the fixtures before use, and QA involvement.Descri

3、ption of Driving Event: Two days prior to the planned delivery of the flight Solar Array Drive, the unit was accidentally dropped on the floor.Final dimensional inspection was being performed on the SAD at the contractors facility. The device was cradled in its drilling and alignment fixture, but in

4、 order to accommodate inspection, was not fastened down. There were no instructions to fasten the SAD to the fixture during manipulation, nor were any warnings posted to indicate that special caution was necessary during the inspection process. There were no documented requirements for quality assur

5、ance (QA) or other cognizant personnel to witness the inspection, and none were present. An employee who was unfamiliar with the device tilted the assembly to take a measurement, unaware that the SAD was not fastened to the fixture. The SAD tumbled out of the fixture, rolled across the surface plate

6、 and fell about 40 inches to the floor. Its housing was damaged in at least two areas, and there was concern that the output bearings had also been damaged by the impact.The SAD was disassembled to facilitate damage assessment, and extensive analysis, testing, and inspection were performed to deter

7、mine its flight worthiness. No evidence of bearing damage was noted, but repair of the damaged housing areas was required. The Material Review Board (MRB) agreed with the proposal to reassemble the SAD without replacement of any major components. Provided by IHSNot for ResaleNo reproduction or netwo

8、rking permitted without license from IHS-,-,-Following the reassembly and inspection, flight acceptance tests (including environmental tests) were successfully repeated.The incident resulted in a two month delay in the SAD delivery and considerable cost increase to the program. A major effort was re

9、quired by the review board and the JPL/Contractor SAD teams to assess, rework, and retest the SAD to assure its flight worthiness.Reference(s): PFR #55704, MRB 00036Lesson(s) Learned: 1. There is a potential for damage whenever flight hardware is handled, even for operations that may appear to be ve

10、ry routine.2. Utilization of existing fixtures for purposes other than as originally designed increases the risks involved in handling of flight hardware.3. When new personnel are brought onto a job, or duties are shared among existing personnel, hardware handling operations incur additional risks.R

11、ecommendation(s): 1. Employees should be familiarized with clear, safe handling practices and instructions written and agreed upon by both the NASA center and the contractor. These standards should be posted in work areas and enforced by quality assurance.2. Perform a careful examination and review

12、of potential risks prior to utilization of existing fixtures for additional handling operations.3. Quality assurance personnel should review and approve all fixturing and setups for flight hardware prior to use.4. Inexperienced personnel should be supported by experienced personnel for a time suffic

13、ient to assure that they have been adequately trained in handling of flight hardware and are thoroughly familiar with the hardware and associated procedures.5. Use special awareness in the development of handling procedures and techniques in the event that someone other than the originator may be re

14、quired to perform those functions.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mission Directorate(s): N/AAdditional Key Phrase(s): a71 Policy & Planninga71 Risk Mana

15、gement/Assessmenta71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 1992-09-24a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1