ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:12.84KB ,
资源ID:1018209      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。 如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1018209.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-0562-1997 Lessons Learned Testing With Removable Shrouds in the LaRC 8-Foot High Temperature Tunnel.pdf)为本站会员(wealthynice100)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-0562-1997 Lessons Learned Testing With Removable Shrouds in the LaRC 8-Foot High Temperature Tunnel.pdf

1、Lessons Learned Entry: 0562Lesson Info:a71 Lesson Number: 0562a71 Lesson Date: 1997-09-04a71 Submitting Organization: LARCa71 Submitted by: Harold BeazleySubject: Testing With Removable Shrouds in the LaRC 8-Foot High Temperature Tunnel Description of Driving Event: A model under test in the tunnel

2、required the use of a removable shroud to insulate a sensor from heating while the model was being injected into the tunnel flow. Once the model was in the tunnel flow and was ready to collect data, the shroud was released from the model and ejected from the diffuser of the tunnel. The first test us

3、ed a metal shroud that had been designed with air dams to ensure that it was not aerodynamic. The metal shroud was of sufficient mass and was ejected from the tunnel at sufficient velocity to cause the shroud to travel a long distance placing personnel in its potential path at unacceptable risk. A “

4、catcher screen“ was install but was not successful in capturing the metal shroud. The metal shroud was replaced with a wooden shroud. The wooden shroud provided the needed heat protection for the sensor and upon release, tumbled, contacted the diffuser walls of the tunnel and disintegrated. The piec

5、es of the wooden shroud either came to rest before reaching the catcher screen or were captured by the catcher screenLesson(s) Learned: When an object is ejected into the tunnel air stream, the mass of the object is as critical as its aerodynamic shape. Flight trajectories may vary significantly fro

6、m their theoretical trajectory.Recommendation(s): Ensure that the mass of objects and their credible trajectories are considered prior to placement into the tunnel for testing.Evidence of Recurrence Control Effectiveness: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted withou

7、t license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Test & Verificationa71 Test FacilityAdditional Info: Approval Info: a71 Approval Date: 1997-09-04a71 Approval Name: Elijah Kenta71 Approval Organization: 421a71 Approval Phone Number: 757-864-3345Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1