1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-03-01a71 Center Point of Contact: KSCa71 Submitted by: Wil HarkinsSubject: Use of Design Review Checklists for Space Shuttle Ground Support Equipment (GSE) Practice: The use of a checklist which delineates specific reliabilit
2、y and maintainability (R Environmental and OperationalProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-At KSC, LSOC R&M Engineering has developed a checklist to cover reliability, maintainability, safety and quality assurance issues for Space Shuttle
3、GSE development. This checklist is used during the design phase of the GSE projects. R&M concerns and requirements for the Shuttle program are addressed in the checklist and brought to the attention of design and project engineering.Technical Rationale:The checklists have resulted from operational e
4、xperience with the Shuttle Program. The document which incorporates the checklist also includes a cross reference which relates items on the Reliability and Maintainability Checklists to Shuttle Program requirements. The table of contents of the document has been included with this practice. A sampl
5、e is also included of some of the items from the Reliability, Quality, Maintainability and Safety Checklists. There are in excess of 60 pages of checklist items which actually comprise the Checklists for Reliability, Quality, Maintainability, and Safety.The format and the topics addressed in the che
6、cklist will also work for other applications and the checklist is designed to be tailored to meet the specific needs of the individual programs. The complete checklist is contained in reference 2.PROCEDURE FOR PERFORMING SPC DESIGN REVIEWS, S&R-P-003 TABLE OF CONTENTS (Reference Only) INTRODUCTION1.
7、0 PROGRAM REQUIREMENTS2.0 GROUND SUPPORT EQUIPMENT DESIGN REQUIREMENTS3.0 REFERENCE DOCUMENTS4.0 RELIABILITY & QUALITY ASSURANCE DESIGN REQUIREMENTS4.1 GENERAL4.2 DESIGN FOR RELIABILITY4.3 BASIC RELIABILITY DESIGN PRINCIPLES4.3.1 Design Simplicity4.3.2 Redundancy4.3.3 Derating4.3.4 Environmental Des
8、ign4.3.5 Self-Healing Items4.3.6 Parts Selection and Control4.4 RELIABILITY & QUALITY ASSURANCE DESIGN REVIEW CHECKLIST5.0 MAINTAINABILITY DESIGN CHARACTERISTICS5.1 GENERALProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5.2 MAINTAINABILITY DESIGN GUI
9、DELINES5.2.1 Electrical/Electronic Equipment Design5.2.1.1 Cables and Connectors5.2.1.2 Miniaturization And Modular Design5.2.2 Mechanical Equipment Design5.2.3 Fluid Equipment Design5.2.4 Interchangeability5.3 MAINTAINABILITY DESIGN REVIEW CHECKLIST6.0 SAFETY DESIGN REVIEW CHECKLISTS6.1 GENERAL6.2
10、SAFETY DESIGN GUIDELINES6.3 DESIGN SAFETY CHECKLISTTABLESTable 1 Shuttle Program RM&QA Requirements for Ground System Design Table 2 Shuttle Program RM&QA Technical Requirements and Criteria for GSE Design Table 3 Reliability Design Review Checklist Table 4 Quality Assurance Design Review Checklist
11、Table 5 Maintainability Design Review Checklist Table 6 Generic Hazard Checklist Table 7 Design Safety Checklistrefer to D descriptionD Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionD refer to D descriptionD refer to D descrip
12、tionD Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References:1. Reliability Engineering for Electronic Design, Norman F. Fuqua, Marcel Dekker, Inc. 1987, pp. 365-366.2. Lockheed Space Operations Company, Procedure for Performing SPC Design Review
13、s, S&R-P-003.Impact of Non-Practice: Failure to use a checklist during the design phase could result in an R&M issue or consideration being overlooked. This could have an impact on the final reliability. Also, making reliability improvements later than the design phase, such as in the prototype or p
14、roduction phase, would result in a much greater increase in cost for the improvement than if the change were done earlier.Related Practices: N/AAdditional Info: Approval Info: a71 Approval Date: 2000-03-01a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-