1、Lessons Learned Entry: 1206Lesson Info:a71 Lesson Number: 1206a71 Lesson Date: 1999-04-01a71 Submitting Organization: JSCa71 Submitted by: Ralph F. Fritsche/ Ronald A. MontagueSubject: Status Report Systems for Complex Integrated Operations Description of Driving Event: The high Program visibility o
2、f Multi-Element Integration Test (MEIT) warrants the need for detailed daily status. Unfortunately, the process for obtaining and providing status proved disruptive to real-time Test Team operations at KSC. Several times during the day people from different organizations would come to the control ro
3、om in search of information for test status or forward planning assessments. This had a negative impact on control room discipline and seriously affected the ability of the Test Directors and Project Engineers to maintain focus on test implementation.Root cause: Lack of pre-established reporting pro
4、tocol and schedule for disseminating MEIT information to ISS Program Office. Lesson(s) Learned: Systematic status reporting processes are a must when multiple parties are involved in complex, real-time integrated operationsRecommendation(s): Daily status updates should be provided by designated Test
5、 Team representatives at specified times as required to meet program needs. This detailed status should be provided external to the control room to minimize disruption to real-time test activities. In addition, shift status updates from Engineering should be provided electronically to the entire tea
6、m and real-time status updates should be available by calling the Test Director console. This fix has been instituted for the remaining Test Configuration (TC) - 1 testing as is proving to be very effective. Evidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction o
7、r networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 ScienceAdditional Key Phrase(s): a71 Administration/Organizationa71 Configuration Managementa71 Flight Operationsa71 Ground Operationsa71 Industrial Operationsa71 Launch Processa71 Poli
8、cy & Planninga71 Range Operationsa71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 2002-05-30a71 Approval Name: Ronald A. Montaguea71 Approval Organization: JSCa71 Approval Phone Number: 281-483-8576Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-