1、Lessons Learned Entry: 1245Lesson Info:a71 Lesson Number: 1245a71 Lesson Date: 2002-06-17a71 Submitting Organization: HQa71 Submitted by: David LengyelSubject: Space Shuttle Program/Orbiter Major Modifications/Management Issues Description of Driving Event: No Description IdentifiedLesson(s) Learned
2、: It is reasonable to utilize the same engineering and technician workforce for routine Space Shuttle processing and Orbiter Maintenance & Down Period (OMDP) work at KSC since the work content is similar. Planning and management functions, however, differ significantly between line processing and he
3、avy maintenance activities.Recommendation(s): Designate separate, appropriately experienced management teams for the regular processing and OMDP work at KSC. These teams must be well coordinated since they will be drawing on the same workforce. Evidence of Recurrence Control Effectiveness: The Orbit
4、er Project has established an OMDP Management Plan, which designates a separate Orbiter management team for OMDP.Documents Related to Lesson: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mission Directorate(s): a71 Space Operationsa71 Explorati
5、on SystemsAdditional Key Phrase(s): a71 Aerospace Safety Advisory Panela71 Ground Operationsa71 Human Resources & Educationa71 Risk Management/Assessmenta71 Safety & Mission Assurancea71 SpacecraftAdditional Info: Approval Info: a71 Approval Date: 2002-06-27a71 Approval Name: Bill Loewya71 Approval Organization: HQa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-