ImageVerifierCode 换一换
格式:PDF , 页数:3 ,大小:14.79KB ,
资源ID:1018957      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1018957.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1318-2002 Lessons Learned Scaffold Incident.pdf)为本站会员(priceawful190)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1318-2002 Lessons Learned Scaffold Incident.pdf

1、Lessons Learned Entry: 1318Lesson Info:a71 Lesson Number: 1318a71 Lesson Date: 2002-11-21a71 Submitting Organization: LARCa71 Submitted by: Chip QuinnSubject: Scaffold Incident Description of Driving Event: An onsite maintenance and operations contractor was tasked to erect scaffolding inside of a w

2、ind tunnel test section so that a heavy gas door seal could be replaced. The test section floor is level until it opens into the tunnel where the floor slopes downward. The portion of tunnel that slopes down from the test section is called the contraction wall. One end of the scaffold had to be plac

3、ed on the down slope. In order to secure the scaffold, three pads were welded onto the test section floor which had a pivoting vertical tube attached to it. The vertical scaffold legs were slid into the tubes. Safety straps were attached to the test section floor because an outrigger section, which

4、extended out over the contraction wall, was installed on the main scaffold.After the completion of work, the onsite maintenance and operations contractor began to take down the scaffold. Four workers were tasked to disassemble the scaffold. Due to the uniqueness of the scaffolding arrangement, the w

5、orkers were told to wait for their supervisor to coordinate the effort. The workers took it upon themselves to disassemble the scaffold. During the disassembly, with the outrigger section still in place, the safety straps were removed. Two employees were on the scaffold when the straps were removed.

6、 As they continued to disassemble the scaffolding, the center of gravity shifted over the outrigger. This caused the scaffolding to topple over since the straps had been removed. Both employees rode the scaffolding to the bottom of the contraction wall. One employee sustained no injuries. The second

7、 employee told his co-workers to call 911. He was taken to a local hospital and released with minor injuries.All employees involved had received training on the assembling and disassembling of scaffolding. The crew lead was one of the employees working on the scaffolding. Under normal conditions, th

8、e crew lead would supervise the work, but the crew supervisor told the crew lead to not begin disassembly until he was present to supervise the work. The crew lead ignored this request and began disassembly. Because the crew lead was actively involved in the take down, he did not see his error Provi

9、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-in removing the straps. He only saw the straps as being in his way of removing scaffolding pieces.Lesson(s) Learned: 1. The take down team should have waited for supervisors assistance as instructed prior to

10、 disassembling the scaffolding.2. Pointing out the high hazard of this task should have been stressed at the start of this undertaking.3. Do not remove the safety straps until the out rigger section has been removed. Explain to workers that the scaffolding could topple over if the straps are removed

11、 prematurely.Recommendation(s): 1. Emphasize the potential for the scaffolding to tip over if the disassembly is not preformed in the proper order.2. Have a knowledgably person (i.e., trained in assembling and disassembling scaffolding) present and in charge but not actively performing the work. Thi

12、s will enable the person in charge to see the “big picture“.3. Provide additional training for employees to avoid future events. Make training specific for the task at hand. Based on the uniqueness of this set up, time should have been devoted to the potential hazards involved in the take down.Evide

13、nce of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Human FactorsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 2003-01-14a71 Approval Name: Leslie J. Johnsona71 Approval Organization: LARCa71 Approval Phone Number: 757-864-9409Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-