ImageVerifierCode 换一换
格式:PDF , 页数:4 ,大小:17.63KB ,
资源ID:1019048      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019048.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1409-2004 Lessons Learned Earned Value Management RESULTS OF A NASA KENNEDY SPACE CENTER EARNED VALUE MANAGEMENT PILOT PROJECT Project Management.pdf)为本站会员(amazingpat195)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1409-2004 Lessons Learned Earned Value Management RESULTS OF A NASA KENNEDY SPACE CENTER EARNED VALUE MANAGEMENT PILOT PROJECT Project Management.pdf

1、Lessons Learned Entry: 1409Lesson Info:a71 Lesson Number: 1409a71 Lesson Date: 2004-04-28a71 Submitting Organization: KSCa71 Submitted by: Glenn Rhodeside/Hector DelgadoSubject: Earned Value Management/“RESULTS OF A NASA KENNEDY SPACE CENTER EARNED VALUE MANAGEMENT PILOT PROJECT“/Project Management

2、Abstract: Earned value management (EVM) is a technique used throughout the aerospace industry. An EVM system requires the establishment of a controlled Performance Measurement Baseline (PMB) against which cost, schedule, and technical performance can be integrated and assessed. However, it has only

3、been relatively recently that the rigorous methodologies of EVM have been applied to small projects and/or to in-house Government activities. “Small” projects may be defined as those with a total dollar value of less than $5M, although this is subjective and must be put in the greater context of an

4、individual project and its organizational environment. A set of NASA Kennedy Space Center (KSC) projects with a dollar range from approximately a few hundred thousand to a few million dollars implemented earned value management as part of a pilot initiative. At least a portion of the work was in-hou

5、se Government activity. The objectives were to uncover the strengths and weaknesses of EVM for projects of that type and size and to determine what obstacles would stand in the way of EVM implementation. The pilot would identify solutions to these obstacles, if possible. The value of the KSC pilot w

6、as to collect data in a structured way rather than just relying on defining issues anecdotally. While there has been much verbal discussion on the subject, a literature search produced little dealing explicitly with what size of projects to apply EVM. Government policy and related documents have tra

7、ditionally dictated total contract value dollar thresholds for the application of EVM and state that it is optional below those thresholds. There is often no discussion as to why the thresholds are what they are versus a lower or a higher number. Description of Driving Event: KSC Earned Value Manage

8、ment Pilot with Eight Development ProjectsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s) Learned: The pilot program demonstrated the difficulty in introducing a new method in an environment that is very dynamic. There are many lessons lear

9、ned in order to help future endeavors. Training: Although training was given to all project teams, perhaps the time needed and number of examples presented were not sufficient to explain all facets of the subject matter. Perhaps the time should be lengthened to at least two days from half a day, thu

10、s allowing more time for explanation of the concepts and for the students to work sample problems, etc. The curriculum used needs to be clear and organized in a way that is attractive to project managers and shows them the benefits to their work. Data Acquisition: This probably proved to be one of t

11、he biggest obstacles to overcome. Since the NASA financial system was and is undergoing a major change, a lot of data were very difficult to obtain in a format that would support EVM. Project managers spent a lot of time looking for data, collecting data, and trying to reconcile data. There was much

12、 manual as opposed to automated effort. This portion of the pilot was totally underestimated in terms of difficulty, time spent, and level of frustration, which probably did not aid in project manager acceptance of the EVM process. On the bright side, it clearly identified opportunities for improvem

13、ent in how data is collected so that it can not only support financial requirements but also project management requirements and above all support the project manager so that he/she can have a good tool to manage the project. The bottom line on data is to make sure the financial system supports the

14、kind of data that is needed to fully implement EVM without incurring a high cost in time, effort, or budget to the project. Tools: Another significant finding was the lack of available off-the-shelf software tools to facilitate conversion of data into an EVM format, although some software does exist

15、 However, they seem more suited for large complex projects. At least in our pilot, project managers expressed the need for a “magic bullet” software solution that would not tax the project manager. Our experience showed that the level of frustration with the implementation was related to the amount

16、 of manual data input that was necessary or required. For this pilot, we resisted the creation of “in-house” software to automate the process other than for minor job aids. We did not successfully recreate a large-scale enterprise solution. Environment: As stated previously, the NASA environment at

17、the time of the pilot was ever changing; not only was Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the financial system being overhauled, but also the Agency was moving to “full cost accounting” as well as other significant changes in the way proj

18、ect management was executed. In retrospect, maybe the pilot was asking too much too fast from the project management population. They had to remain focused on delivering the products while working under an ever changing system. Even though the task of the pilot proved to be daunting, in true NASA tr

19、adition the project teams gave it their best shot to support the pilot program and provide invaluable data as to the merits of the pilot. Recommendation(s): The Earn Value Management Pilot provided a tremendous amount of data on the strengths and weaknesses of the new financial system, the ability t

20、o support EVM from many viewpoints, the lack of tools for small to medium projects implementing EVM, and the training and environment necessary to successfully deploy EVM to all projects. This data along with other pilots will prove invaluable. Deploying EVM should not be taken lightly - a full asse

21、ssment of capabilities and supporting infrastructure should be done prior to any deployment, and some very basic questions should be asked. For instance, will sufficient training be provided? Can the project managers readily and easily obtain all the necessary data? If EVM is to thrive in all projec

22、ts regardless of cost, the transition should be as seamless as possible, minimizing cost and effort, and with the end user in mind. In setting up an EVM implementation, the question, “How does the project manager benefit from this process?” must remain at the forefront. Further research in this area

23、 is needed to answer the question, “Is EVM cost effective in small projects?” Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPR 7120.5Mission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Fi

24、nancial ManagementProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Information Technology/Systemsa71 Policy & Planninga71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2004-05-20a71 Approval Name: Gena Bakera71 Approval Organization: KSCa71 Approval Phone Number: 321-867-4261Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-