ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:13.08KB ,
资源ID:1019071      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019071.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1432--1989 Lessons Learned - 8-Foot High Temperature Tunnel Mishap (1989).pdf)为本站会员(李朗)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1432--1989 Lessons Learned - 8-Foot High Temperature Tunnel Mishap (1989).pdf

1、Lessons Learned Entry: 1432Lesson Info:a71 Lesson Number: 1432a71 Lesson Date: 1989-11-20a71 Submitting Organization: LARCa71 Submitted by: Grant WatsonSubject: 8-Foot High Temperature Tunnel Mishap (1989) Abstract: Mishap while preparing to perform pneumatic flushing of debris from high pressure ai

2、r lines in the 8-Foot High Temperature Tunnel (8HTT).Description of Driving Event: A mishap occurred at the 8HTT when a team of construction contractor personnel was preparing to perform a pneumatic flushing of debris from high pressure air lines by use of a low pressure, high velocity air. The blan

3、k flange was removed from air lines perceived to have been un-pressurized. Removal of the flange, under pressure, resulted in serious injury to two of the personnel involved in the operation.Lesson(s) Learned: There were formal approved procedures which were to control this activity. If they had bee

4、n followed, the accident could have been prevented. The procedures were written so as to ensure that the line was un-pressurized when the blank flanges were removed and that the flushing air source was not attached to the system unless the flanges were already removed. However, a failed valve and th

5、e use of an alternative source for the air apply allowed this mishap to occur. The new configuration used a larger volume air source which was not isolated prior to flange removal. The configuration also allowed a single order failure to pressurize the line upstream of the blank flange.Recommendatio

6、n(s): Survey your facility to verify that vents are present upstream of blank flanges used within your research systems/apparatus. Procedures dealing with the removal of these blank flanges must require Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,

7、verification of the venting of any such system to atmospheric pressure prior to flange removal. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phras

8、e(s): a71 Accident Investigationa71 Facilitiesa71 Hardwarea71 Human Factorsa71 Mishap Reportinga71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2004-06-04a71 Approval Name: Leslie Johnsona71 Approval Organization: LARCa71 Approval Phone Number: 757-864-9409Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1