ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:12.94KB ,
资源ID:1019175      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。 如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019175.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1552--2005 Lessons Learned Lack of Project-level Reserves.pdf)为本站会员(deputyduring120)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1552--2005 Lessons Learned Lack of Project-level Reserves.pdf

1、Lessons Learned Entry: 1552Lesson Info:a71 Lesson Number: 1552a71 Lesson Date: 2005-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. Mendozaa71 Authored by: Ronald C WinterlinSubject: Lack of Project-level Reserves Abstract: The AATT Project was directed, at the Non-Advocate Review (

2、NAR), to not maintain a reserve, which significantly hampered the projects ability to mitigate risk and address unforeseen situations. Most schools of thought recognize the importance of any project manager maintaining a reasonable reserve for purposes of risk management and mitigation. Having no ot

3、her option but to re/de-scope in some fashion obviously has negative effects on the project and its ability to deliver completely and on time. Description of Driving Event: During the AATT Project the requirement to re-plan or de-scope the project was necessary to support shifts in customer and stak

4、eholder needs. The ability for a project to effectively and efficiently make significant midcourse adjustments is impacted by the lack of a budget reserve. Lesson(s) Learned: The “lesson learned” from the AATT Project is to ensure projects are authorized to maintain a funding reserve and this is hon

5、ored and maintained throughout the life of the project. Often times “project reserves” are really not what they appear and are not made available to individual project managers granted necessary authority to make and implement decisions regarding their expenditure. Recommendation(s): Obviously, suff

6、icient recognized reserve amounts must be designated for project management use and preserved, as stated above. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPR 7120.5Mi

7、ssion Directorate(s): a71 Exploration Systemsa71 Sciencea71 Aeronautics Researcha71 Space OperationsAdditional Key Phrase(s): a71 Policy & Planninga71 Program and Project Managementa71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Organization: ARCProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-