ImageVerifierCode 换一换
格式:PDF , 页数:4 ,大小:17.59KB ,
资源ID:1019227      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019227.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1604--1994 Lessons Learned - F-18 High Alpha Research Vehicle Lessons Learned.pdf)为本站会员(unhappyhay135)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1604--1994 Lessons Learned - F-18 High Alpha Research Vehicle Lessons Learned.pdf

1、Lessons Learned Entry: 1604Lesson Info:a71 Lesson Number: 1604a71 Lesson Date: 1994-11-14a71 Submitting Organization: DFRCa71 Authored by: Al Bowers / Victoria Regenie / Brad Flick Submitting Organization: Dryden Flight Research CenterSubject: F-18 High Alpha Research Vehicle Lessons Learned Abstrac

2、t: The F-18 High Alpha Research Vehicle has proven to be a useful research tool with many unique capabilities. Many of these capabilities are to assist in characterizing flight at high angles of attack, while some provide significant research in their own right. Of these, the thrust vectoring system

3、, the unique ability to rapidly reprogram flight controls, the reprogrammable mission computer, and a reprogrammable On-Board-Excitation-System have allowed an increased utility and versatility of the research conducted. Because of this multi-faceted approach to research in the high angle of attack

4、regime, the capabilities of the F-18 High Alpha Research Vehicle were designed to cover as many high alpha technology bases as the program would allow. These included aerodynamics, controls, handling qualities, structures, instrumentation, flight avionics systems, and propulsion. To achieve these go

5、als, new capabilities were developed to enable this research to occur some were outstandingly successful; others were not. Description of Driving Event: To better address the need for improved high angle of attack capabilities, NASA formed a High Alpha Technology Program (HATP). The focal point of t

6、his program was selected to be a highly modified F-18 airframe. Lesson(s) Learned: 1. Use of an all-inclusive steering committee of all the stakeholders was an outstanding asset to the execution of the program. Being all inclusive meant all voices were heard, and even when unanimous decisions were n

7、ot reachable, consensus was achieved, which maintained long term viability of the program and the project. Frequent communication was essential for this to happen Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-within the steering committee. 2. Insuf

8、ficient systems approach to the facilities, equipment, and planning occurred. Despite having extensive experience within the team with systems engineering, insufficient excess capacity was designed into the system because the entire lifecycle was not understood at inception. Requirements creep resul

9、ted in taking additional time, effort, and energy to incorporate research which was not mature at the start of the design. 3. Careful attention to risk management, both programmatic and technical, was a valuable asset in every phase of the program. In particular, sensitivity to the aircraft systems

10、was paramount. 3a. In one instance, the aircrafts flight control computers failed to pass the Built-In Test on several occasions during the Day-of-Flight checks before passing the Built-In Test. As the pilot and crew continued the preparation for flight, several engineers in the control room stopped

11、, took stock of the situation, and decided to cancel the mission until the reason for the failures was understood for the aircraft not passing the Built-In Test. 3b. In another instance, the Spin Recovery System (spin parachute) was reinstalled on the aircraft. The convention at that time was to fir

12、e the chute system from a benign flight condition as a system test. In most spin parachute systems, there is a small (but finite) potential for loss of the aircraft if the chute cannot be jettisoned. In the case of the F-18 HARV, the project team decided to fire the chute on the ground in a high-spe

13、ed taxi test only (this was done twice) and to NOT fire the system in-flight as a system test. This reduced the risk exposure to the aircraft and flight crew, while still testing the system in a representative environment. It should be noted that two other high angle of attack programs decided to fi

14、re the spin parachute in-flight as a system test (X-29A and X-31A). 3c. As well as making careful estimates for improvements and changes, be sure to define, well in advance and with careful planning, the deletion of specific envelope expansion hardware (or safety hardware). This needs to be carefull

15、y coordinated as part of the continuing airworthiness and flight safety process. In the case of the F-18 HARV, after the envelope expansion was complete, the need for the spin recovery system and the emergency power systems (battery back-ups, another system that was tested and demonstrated in ground

16、 tests) could have been removed from the aircraft. A current example might be the Fight Termination System onboard a UAV, or a system augmentation of the Flight Termination System. 4. Testing, both ground and flight, always uncovers deficiencies and contingencies that need to be planned in. This is

17、true in the integration phase, but also (and in particular with one-of-a-kind research systems) in the flight phase. One aspect of this was the use of carrying extra flight cards in the briefed cards for a mission. Even though we knew we could not achieve all the test points, excess cards were alway

18、s carried. If one piece of instrumentation failed during a mission, then other cards could be substituted and a full mission could be flown. Up to 140% of a missions cards would be carried on every mission. Having these contingencies in mind during planning is useful as well. If a particular flight

19、control load developed unforeseen problems, a previous load (for which lower priority test points are still waiting to be flown) can be reloaded and lower priority missions continue Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-while the unforeseen

20、 difficulties are resolved. The ground testing of the system wa greatly streamlined by the presence of the Hardware-in-the-Loop simulation residing at Dryden. The hardware simulation, being co-located with the aircraft and the research team, minimized impacts to the schedule. 5. Use of a Class B env

21、elope for Class B software (flight control laws) is very useful. However, careful attention needs to be paid to the corners of the Class B envelope to assure that, truly, the envelope is Class B. In particular, the lower right corner (for static structural loads) and the upper right corner (for flut

22、ter), and the upper left corner (for aeroservoelastics). Class B software is quickly reconfigurable, and flexible. Recommendation(s): 1. Use of an all-inclusive steering committee of all the stakeholders was an outstanding asset to the execution of the program. Being all inclusive meant all voices w

23、ere heard, and even when unanimous decisions were not reachable, consensus was achieved, which maintained long term viability of the program and the project. Frequent communication was essential for this to happen within the steering committee. 2. Use of a Class B envelope for Class B software (flig

24、ht control laws) is very useful. However, careful attention needs to be paid to the corners of the Class B envelope to assure that, truly, the envelope is Class B. In particular, the lower right corner (for static structural loads) and the upper right corner (for flutter), and the upper left corner

25、(for aeroservoelastics). Class B software is quickly reconfigurable, and flexible. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NASA TM 4772, “An Overview of the NASA F-18 High Alpha Research Vehicle”, Albion H Bowers, Joseph W Pahle, R Joseph Wilson, Bradley C Flick

26、, and Richard L Rood, Oct 96.Mission Directorate(s): a71 Exploration Systemsa71 Aeronautics ResearchAdditional Key Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Aircrafta71 Flight Operationsa71 Ground Operationsa71 Policy & Planninga71 Program and Project Managementa71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 2008-10-09a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-