ImageVerifierCode 换一换
格式:PDF , 页数:3 ,大小:15.21KB ,
资源ID:1019259      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019259.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1717-2006 Lessons Learned Process Control of Floor Level Procedures.pdf)为本站会员(brainfellow396)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1717-2006 Lessons Learned Process Control of Floor Level Procedures.pdf

1、Lessons Learned Entry: 1717Lesson Info:a71 Lesson Number: 1717a71 Lesson Date: 2006-03-14a71 Submitting Organization: JSCa71 Submitted by: Ron Montaguea71 POC Name: SheliaPowella71 POC Email: shelia.k.powellnasa.gova71 POC Phone: 281-483-3142Subject: Process Control of Floor Level Procedures Abstrac

2、t: Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution panel ultimately led

3、 to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that had penetrated conductor insulation. Failure to perform work practices in accordance with established procedures ultimately resulted in procedural errors. 1. Personnel b

4、egan work prior to scheduled outage with power sources energized. The very first step in the procedure is to implement the outage, but later steps were clearly performed in advance. While the later steps were not in themselves hazardous, the regular practice of performing steps out of order without

5、prior authorization ultimately leads to a breakdown in process control. Management who reviewed and approved the procedure expected the procedure to be followed stepwise but in actuality the steps were re-ordered by employees and their supervisors who believed they had the discretion to reorder the

6、procedure during implementation. This practice largely negates the checks and balances in place during the development of procedures required to ensure that implementation met management expectations. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2

7、. Procedures and reference materials were available but not in possession of the electricians at the worksite. The procedure that governed the task itself was in the possession of supervisors who came and went from the worksite during the course of the shift. Only one of the supervisors had the pane

8、l schedule, a line drawing and a one line diagram. 3. A complicating factor was the distribution of multiple copies of the procedure to accomplish the work. There was no reconciliation of entries by personnel who were remotedly locate and in communication by phone. Times and dates occasionally did n

9、ot match or were entered in error. No single master or official copy was in the control of the supervisor; it was in the custody of another craft supervisor. Lesson(s) Learned: Floor level procedures must be developed and implemented in accordance with sound process control practiceRecommendation(s)

10、: 1. Implement refresher training for employees to recognize risks associated with deviating from established processes. 2. Evaluate written policies for applicability, clarity and effectiveness. Institute program to review procedures on a routine basis with assigned field crafts. 3. Follow procedur

11、es in sequence as written. Assure that as tasks are revised in the field that those revisions become lessons learned and incorporated in future procedures. 4. Implement refresher training for employees to recognize risks associated with beginning procedural tasks prior to a scheduled outage. 5. Clar

12、ify electrical hot work policy to include removal of fasteners from energized panels as electrical hot work. 6. Provide field crafts with copies of procedures and pertinent reference materials at the worksite. Ensure one control copy of the procedure has all steps and data entries verified and time

13、stamped as work is completed. Clearly identify working copies vs. control copy on all documents. Consider identifying all expected attachments to procedures by number, title, version and/or date.Evidence of Recurrence Control Effectiveness: Controlling processes for developing procedures have been r

14、evised to address all recommendations. Training has been implemented and spot checks via inspections have been implemented.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phras

15、e(s): a71 Program Management.Communications between different offices and contractor personnela71 Manufacturing and Assemblya71 Additional Categories.a71 Additional Categories.Configuration Managementa71 Additional Categories.Energya71 Additional Categories.Facilitiesa71 Additional Categories.Industrial Operationsa71 Additional Categories.Policy & PlanningAdditional Info: a71 Project: N/AApproval Info: a71 Approval Date: 2006-06-30a71 Approval Name: tmasona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1