ImageVerifierCode 换一换
格式:PDF , 页数:3 ,大小:15.86KB ,
资源ID:1019290      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019290.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-1795-2007 Lessons Learned - NASA Mishap Investigation Report Review application to LRO and LCROSS.pdf)为本站会员(medalangle361)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-1795-2007 Lessons Learned - NASA Mishap Investigation Report Review application to LRO and LCROSS.pdf

1、Lessons Learned Entry: 1795Lesson Info:a71 Lesson Number: 1795a71 Lesson Date: 2007-4-30a71 Submitting Organization: MSFCa71 Submitted by: Leslie CurtisSubject: NASA Mishap Investigation Report Review, application to LRO and LCROSS Abstract: One of NASAs earliest activities for implementing the visi

2、on for space exploration is the initiation of a series of robotic missions to the moon to prepare for and support future human exploration activities. The Exploration Systems Mission Directorate (ESMD) is sponsoring two robotic missions to the moon in late 2008. The Lunar Reconnaissance Orbiter (LRO

3、) will spend at least one year in low, polar orbit gathering data to map the lunar surface. LRO will collect the highest resolution and most comprehensive data set ever returned from the moon to help achieve NASAs goal of returning human explorers safely to the moon. The Lunar Crater Observations an

4、d Sensing Satellite (LCROSS) will investigate the presence and nature of water ice on the moon by impacting a lunar crater and observing the ejecta plume created. The LCROSS mission will provide valuable information about the existence of water on the moon, which will be used for future human lunar

5、mission designs. To help ensure the success of these two important missions, an assessment of previous NASA missions which had mishaps or failures was performed. Mishap Investigation Board (MIB) Reports were reviewed for eight missions, and the root causes and contributing causes of these mission mi

6、shaps were organized into recurring areas or themes. The recurring causes for these mishaps were reviewed with emphasis on potential application to LRO and LCROSS. It is hoped that this assessment of past missions that experienced mishaps and failures will prove valuable to the LRO and LCROSS projec

7、t teams. Description of Driving Event: This report was written with the objective of researching, reviewing, and consolidating NASA failures that would potentially be of interest to the LRO and LCROSS project teams for consideration. By reviewing previous failures and mishaps the LRO and LCROSS proj

8、ects may increase their ability to achieve mission success.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s) Learned: The goal for NASA is to achieve mission success in all of its projects and programs. To accomplish this goal proven engineer

9、ing and design processes must be used, accompanied by adequate reviews and a healthy test and verification program. Risks must be constantly assessed and accounted for during implementation of the project. NASA has accomplished many missions successfully and there have also been quite a number of mi

10、ssion mishaps which could have been avoided. An assessment of recent mission mishaps should prove valuable to preventing a similar occurrence on future missions.Recommendation(s): The importance of the LRO and LCROSS missions to the Vision for Exploration is recognized by the project teams as well a

11、s organizations within NASA. Much help and advice has been and will be offered to these two projects as they work through the implementation phase. It is hoped that this assessment of past missions that experienced failures and mishaps will prove valuable to the LRO and LCROSS project teams. There i

12、s always value in looking at what NASA has done and learning from the failures and successes of previous missions.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: Click here to download document. Mission Directorate(s): a71 Exploration SystemsAdditional Key Phrase(s): a7

13、1 Program Management.a71 Program Management.Communications between different offices and contractor personnela71 Program Management.Configuration and data managementa71 Program Management.Program level review processesa71 Program Management.Risk managementa71 Missions and Systems Requirements Defini

14、tion.a71 Missions and Systems Requirements Definition.Configuration control and data managementProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Missions and Systems Requirements Definition.Review boardsa71 Systems Engineering and Analysis.a71 Syst

15、ems Engineering and Analysis.Engineering design and project processes and standardsa71 Systems Engineering and Analysis.Planning of requirements verification processesa71 Engineering Design (Phase C/D).a71 Engineering Design (Phase C/D).Lander Systemsa71 Engineering Design (Phase C/D).Orbiting Vehic

16、lesa71 Engineering Design (Phase C/D).Roboticsa71 Integration and Testinga71 Mission Operations and Ground Support Systems.a71 Mission Operations and Ground Support Systems.Logistics and maintenancea71 Mission Operations and Ground Support Systems.Lunar Operationsa71 Mission Operations and Ground Su

17、pport Systems.Mission operations systemsa71 Mission Operations and Ground Support Systems.Planetary Operationsa71 Mission Operations and Ground Support Systems.Training and simulation systemsa71 Safety and Mission Assurance.a71 Safety and Mission Assurance.Review systems and boardsAdditional Info: a71 Project: LRO and LCROSS and other flight projectsApproval Info: a71 Approval Date: 2007-08-31a71 Approval Name: ghendersona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1