ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:112.27KB ,
资源ID:1019422      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019422.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-3338-2010 Lessons Learned Improve the Constraint System Identification of Precedence Order for Work Procedures.pdf)为本站会员(lawfemale396)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-3338-2010 Lessons Learned Improve the Constraint System Identification of Precedence Order for Work Procedures.pdf

1、Public Lessons Learned Entry: 3338Lesson Info:a71 Lesson Number: 3338 a71 Lesson Date: 2010-05-1 a71 Submitting Organization: KSC a71 Submitted by: Annette Pitt Subject: Improve the Constraint System / Identification of Precedence Order for Work Procedures Abstract: Constraints, or the identificatio

2、n of a precedence order for work procedures, are crucial to flight hardware processing. A constraints system has been in place for many years in the Shuttle Program. However, when a new electronic work control system was brought online for Ares I-X processing, a robust and automated way of controlli

3、ng constraints was not provided. As a result, several constraints were missed, and this drove the need to rework constraints, such as opening a closed-out area back up to complete work that was missed. This can even become a safety issue. A system must be put in place when new work control systems a

4、re brought online for the identification of a precedence order for work procedures. Description of Driving Event: Constraints are heavily used in Shuttle processing. A constraint is when one work item must be completed before another can be started. For example, a repair must be completed inside a c

5、avity before the area is closed out for flight. The Space Shuttle electronic work control system automatically identifies constraints, but they are then manually entered onto the work document that needs to be held up. During Ares I-X processing a new electronic work control system, Collaborative In

6、tegrated Processing System (CIPS), was brought online and used. However, little thought was given to handling constraints. The old system was not used, and constraints were manually tracked by Planning & Scheduling with an expectation that the engineer would enter them in the electronic document lat

7、er. (The electronic documents were often not released to the floor until the last day or two before they were worked). Several constraints were missed early in the Ares I-X implementation for Solid Rocket Booster (SRB) processing. The CIPS team is working on an automated method to replace the manual

8、 method. Lesson(s) Learned: Constraints management is critical to safe and efficient hardware processing. If a constraint system is not present, open work may not be completed. Therefore, a robust and automated constraints process is critical. Recommendation(s): Future hardware processing systems sh

9、ould allow engineers to identify which procedure must be worked before others. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): a71 Space Operations Additional Key Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitte

10、d without license from IHS-,-,-a71 1.Ground support systems a71 1.Launch support systems a71 1.Logistics and maintenance a71 1.Ground processing and manifesting Additional Info: a71 Project: Space Shuttle Program Approval Info: a71 Approval Date: 2010-11-15 a71 Approval Name: mbell a71 Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1