ImageVerifierCode 换一换
格式:PDF , 页数:3 ,大小:177.35KB ,
资源ID:1019501      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019501.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-5456-2011 Lessons Learned Building 1100 3rd Floor Fire.pdf)为本站会员(progressking105)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-5456-2011 Lessons Learned Building 1100 3rd Floor Fire.pdf

1、Public Lessons Learned Entry: 5456 Lesson Info: Lesson Number: 5456 Submitting Organization: SSC Submitted by: Robert Traill Subject: Building 1100 3rd Floor Fire Abstract: A fire at NASA John C. Stennis Space Center occurred in an area that was undergoing asbestos abatement. The direct cost of dama

2、ge from this mishap has been estimated at $376,000 and was classified as a Type B Mishap, IRIS Safety Incident #2008-075-00002. An Events and Causal Factors (E&CF) Tree was generated and the primary proximate cause was determined to be an undersized extension cord that was improperly routed and ener

3、gized, in the presence of fuel sources and adequate oxygen. Three Root Causes and two Contributing Factors were identified, resulting in three Recommended Corrective Actions. Description of Driving Event: On March 14, 2008, at NASA John C. Stennis Space Center (SSC), at approximately 1750 Central St

4、andard Time (CST), a fire occurred in Building 1100, 3rd floor, in an area that was undergoing asbestos abatement. There were no injuries associated with this mishap. The fire occurred in an unoccupied construction area following the end of a normal workday (0800-1630 hours). The SSC Fire Department

5、 (FD) serves as first responders for fire, emergency and emergency medical services (EMS) for the center and was on scene within six minutes of the first alarm. The center section of the 3rd floor was engulfed with heavy smoke upon FD arrival. The FD laid two fire hoses, one from a water hydrant loc

6、ated near the northeast corner of Building 1100 and one from a standpipe on the 2nd floor to the fire on the 3rd floor. The fire was brought under control within 15 minutes of the initial attack by the FD. The direct cost of damage from this mishap has been estimated at $376,000 and was classified a

7、s a Type B Mishap, IRIS Safety Incident #2008-075-00002. The proximate causes leading to the mishap are listed below. For the fire to occur, one Event and two Conditions had to be met and were identified as the three Proximate Causes: an ignition event, available fuel, and an adequate oxygen supply.

8、 Available fuel and oxygen supply were eliminated as ignition sources. A Fault Tree was developed to identify the most likely ignition source based on potential ignition sources present in the fire area. This process identified undersized and improperly routed extension cords as the most likely igni

9、tion source. These results were fed into the Events and Causal Factors (E&CF) tool for additional assessment. An E&CF Tree was generated based on the three Proximate Causes (see Figure 1, Events and Causal Factors Tree). Each Proximate Cause was developed to examine all reasonable or possible hypoth

10、eses for how the mishap might have occurred, and to systematically rule out as many alternatives as the evidence allowed. The E&CF analysis resulted in three Root Causes and two Contributing Factors. The primary proximate cause was an undersized extension cord that was improperly routed and energize

11、d, in the presence of fuels sources and adequate oxygen. Based on evidence at the scene, the fire originated in an asbestos decontamination station, which was a wood-framed enclosure covered with 6 mil plastic. The station was not in use on the day of the mishap. All elements required for a fire wer

12、e present in the area: oxygen at normal levels, combustibles, and potential ignition sources that included task lighting, equipment and extension cords. Utilizing the investigative approach above, the source of ignition for the fire was determined to be undersized and improperly routed extension cor

13、ds. Three Root Causes and two Contributing Factors were identified, resulting in three Recommended Corrective Actions. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s) Learned: Provided by IHSNot for ResaleNo reproduction or networking permi

14、tted without license from IHS-,-,-LL1: Smoke and Fire Alarm System deactivated for construction: The alarm systems were deactivated for the construction activities in the 3rd floor area. This is a normal approach to construction activities at SSC. LL2: SSC did not execute the established Incident Re

15、sponse Team (IRT) processes: The emergency response by the fire department was executed extremely well to this mishap, but the required IRT process was never implemented. Without the guidelines of the IRT process, the impounding and security of the mishap area was potentially jeopardized. Recommenda

16、tion(s): RCA 1.2: NASA/SSC SMA should require contractors to implement site-specific safety inspection checklists for construction projects that identify unique requirements based on the contract Statement of Work. RCA 2.1: NASA/SSC SMA should develop site-specific safety inspection checklists for c

17、onstruction projects that identify unique requirements based on the contract Statement of Work. RCA 3.2: NASA/SSC SMA should implement a verifiable contract requirement for construction contractor safety inspection documentation. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): N/A Additional Key Phrase(s): Facilities Additional Info: Project: NA Approval Info: Approval Date: 2011-03-09 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1