1、*USACE / NAVFAC / AFCESA / NASA UFGS-08 34 73 (May 2012)-Preparing Activity: NASA SupersedingUFGS-08 34 73 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION TABLE OF CONTENTSDIVISION 08 - OPENINGSSECTION 08 34 73SOUND CONTROL DOOR AS
2、SEMBLIES05/12PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 COMPLIANCE, TESTING, AND GUARANTEE1.3.1 Compliance And Labeling1.3.1.1 Category A Positive Pressure Fire Door Construction1.3.1.2 Category B Positive Pressure Fire Door Construction1.3.1.3 Labeling1.3.2 Testing1.3.2.1 Sound Transmission Clas
3、sification (STC)1.3.2.2 Positive Pressure1.3.3 Guarantee1.3.4 Testing and Performance1.4 QUALITY ASSURANCE1.4.1 Field Measurements1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 GENERAL2.1.1 Components2.2 STC RATING2.3 HOLLOW METAL SOUND RETARDANT DOORS2.3.1 Fabrication2.4 WOOD SOUND-RETARDANT
4、 DOORS2.4.1 Door Design2.4.2 Door Finishing2.5 DOOR FRAMES2.5.1 Materials2.5.2 Frame Design2.5.3 Hardware Reinforcements2.5.4 Anchors2.5.5 Frame Painting and Cleaning2.6 DOOR HARDWARE2.7 CAM LIFT HINGESSECTION 08 34 73 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted withou
5、t license from IHS-,-,-2.8 VISION PANELS2.9 PERIMETER INTUMESCENT SEALS AND GASKETING2.10 THRESHOLDS2.11 ASTRAGALSPART 3 EXECUTION3.1 PREPARATION3.2 SITE STORAGE3.3 FRAME INSTALLATION3.4 DOOR INSTALLATION3.5 FIELD TESTING- End of Section Table of Contents -SECTION 08 34 73 Page 2Provided by IHSNot f
6、or ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-08 34 73 (May 2012)-Preparing Activity: NASA SupersedingUFGS-08 34 73 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTIO
7、N 08 34 73SOUND CONTROL DOOR ASSEMBLIES05/12*NOTE: This guide specification covers the requirements for flush steel and wood sound retardant doors with Sound Transmission Classification (STC) ranging from 25 to 45. Doors are limited to standard height and width where noise control is required, relat
8、ive to speech, music, office equipment, and general sounds.Sound retardant doors for complex and special applications, where noise control related to machinery, industrial process sounds, automotive, and aircraft sounds, are not included. Revise specifications as required for the specific applicatio
9、n.Sound retardant door assemblies include the door, perimeter seals, and metal door frame. Some companies provide a complete guaranteed package consisting of door, frame, special threshold, seals, gasketing, and hardware.Indicate on the drawings, door locations, required sound transmission classific
10、ation (STC) ratings, required UL label, frame construction, required fire and smoke ratings, details of perimeter seals, and door bottom and vision panel requirements.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or prepar
11、ing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whe
12、ther or not brackets are present.Comments, suggestions and recommended changes for SECTION 08 34 73 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).
13、*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizard
14、s Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from th
15、is section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN WELDING SOCI
16、ETY (AWS)AWS D1.3/D1.3M (2008; Errata 2008) Structural Welding Code - Sheet SteelARCHITECTURAL WOODWORK INSTITUTE (AWI)AWI AWS (2009) Architectural Woodwork StandardsASTM INTERNATIONAL (ASTM)ASTM A1008/A1008M (2011) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Stren
17、gth Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake HardenedASTM A1011/A1011M (2010) Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability and Ultr
18、a-High StrengthASTM A108 (2007) Standard Specification for Steel Bar, Carbon and Alloy, Cold-FinishedSECTION 08 34 73 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM A36/A36M (2008) Standard Specification for Carbon Structural SteelASTM A5
19、68/A568M (2011b) Standard Specifications for Steel, Sheet, Carbon, Structural, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements forASTM C1036 (2010e1) Standard Specification for Flat GlassASTM D1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge
20、or Expanded RubberASTM D4689 (1999; R 2005) Standard Specification for Adhesive, Casein-TypeASTM D6386 (2010) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for PaintingASTM E1289 (2008) Standard Specification for Reference Specimen
21、 for Sound Transmission LossASTM E336 (2011) Measurement of Airborne Sound Insulation in BuildingsASTM E413 (2010) Rating Sound InsulationASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and ElementsNATIONAL FIRE PROTECTION AS
22、SOCIATION (NFPA)NFPA 101 (2012; Amendment 1 2012) Life Safety CodeNFPA 252 (2008) Standard Methods of Fire Tests of Door AssembliesNFPA 80 (2010; TIA 10-2) Standard for Fire Doors and Other Opening ProtectivesUNDERWRITERS LABORATORIES (UL)UL 10C (2009) Standard for Positive Pressure Fire Tests of Do
23、or Assemblies1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.SECTION 08 34 73 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted wit
24、hout license from IHS-,-,-The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item,
25、 if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army pro
26、jects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used
27、 for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Qual
28、ity Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsHollow Metal Sound Retardant Doo
29、rsWood Sound Retardant DoorsDoor FramesSD-03 Product DataHollow Metal Sound Retardant DoorsWood Sound Retardant DoorsDoor FramesDoor Hardware Vision Panels Intumescent Seals and Gasketing Thresholds AstragalsSECTION 08 34 73 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted
30、without license from IHS-,-,- SD-06 Test ReportsWind Loading TestsWater Leakage TestsAcoustical TestsAir Infiltration TestsPositive Pressure TestsSD-07 CertificatesHollow Metal Sound Retardant DoorsWood Sound Retardant DoorsDoor FramesDoor Hardware Vision Panels Intumescent Seals,Gasketing and Door
31、Bottoms Thresholds Astragals1.3 COMPLIANCE, TESTING, AND GUARANTEE*NOTE: The three major U.S. testing organizations are (1) Intertek Testing Services (Warnock Hersey), (2) Factory Mutual Research, and (3) Underwriters Laboratories.Determine if the doors qualify with the standard frame. If neither th
32、e frame nor the door is rated, a gasket system may be specified which will qualify the door/frame assembly. Failure to do so will result in the door assembly not qualifying for proper positive pressure labeling.*1.3.1 Compliance And Labeling1.3.1.1 Category A Positive Pressure Fire Door Construction
33、Where requirements for positive pressure are met, include for doors all requirements as part of the door construction per Category A guidelines as published by ITS/Warnock-Hersey. No intumescent is allowed on the frame. Only smoke gasketing applied around the perimeter of the frame to meet the “S“ s
34、moke rating is permissible in instances where smoke control is required.SECTION 08 34 73 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3.1.2 Category B Positive Pressure Fire Door ConstructionConform all door openings to the applicable port
35、ions of NFPA 101 and NFPA 252. Incorporate field applied intumescent materials, applied by a licensed installer according to the manufacturers instructions. Keep instructions on file. Additional gasketing may be required to meet the S smoke rating. Submit Certificate for Intumescent Seals, Gasketing
36、 and Door Bottoms.1.3.1.3 LabelingEnsure all positive pressure door assemblies carry the fire label for the complete opening, clearly identifying the:a. Manufacturerb. Third party testing and certification agencyc. Fire door ratingd. Installation limitationse. Compatible frame, hardware component ra
37、tingsf. Compatible lite or vision panel component ratingsg. Required building code information, including temperature and smoke rating1.3.2 Testing1.3.2.1 Sound Transmission Classification (STC)Provide Test reports prepared by a nationally recognized, independent laboratory for Acoustical Tests, Air
38、 Infiltration Tests,Wind Loading Tests, and Water Leakage Tests indicating that the sound transmission classification (STC) of the proposed door, based on tests at 16 third-octave band frequencies from 125 to 4,000 hertz, is no less than the specified STC when tested in accordance with ASTM E90, and
39、 that the door tested is hung in substantially the type of wall and frame as indicated and is fully operable with hardware and perimeter seals installed.1.3.2.2 Positive Pressure Provide Test reports, prepared by a nationally recognized, independent laboratory for Positive Pressure Tests, for all fi
40、re rated door assemblies, including Intumescent Seals,Gasketing, and Door Bottoms.1.3.3 GuaranteeProvide written guarantee that each door delivered to the project is equal in construction, sound transmission classification (STC), and positive pressure test rating where applicable, with appropriate l
41、abeling and markings, to that of the sample door tested. Clearly state in written guarantee that each door assembly, when installed in accordance with the manufacturers printed instructions, has an in-place STC within 3 decibels of the specimen tested. Submit the following test data and Certificates
42、 with the written Guarantee:SECTION 08 34 73 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Wind Loading TestsWater Leakage TestsAcoustical TestsAir Infiltration TestsPositive Pressure Tests1.3.4 Testing and PerformanceProvide assemblies that
43、are identical to those tested at an independent acoustical laboratory qualified under the National Voluntary Laboratory Accreditation Program (NVLAP) by the National Institute for Science and Technology (NIST) in accordance with ASTM E90 and ASTM E413. On test reports include the laboratory name, te
44、st report number and date of test.1.4 QUALITY ASSURANCEEnsure work within this section is designed and furnished by one manufacturer, who has been engaged in the manufacture of Sound Retardant Wood Swinging Door Hollow Metal Door _ systems for at least five (5) years prior to the start of this work.
45、Provide acoustic assemblies manufactured by a single source specializing in the production of this type work for a minimum of 5 years.1.4.1 Field MeasurementsField verify all measurements prior to preparation of drawings and fabrication.1.5 DELIVERY, STORAGE, AND HANDLINGShip all doors in the manufacturers undamaged individual cartons, securely bundled and wrapped with moisture-resistant covers and stored in accordance with the manufacturers printed instructions in a dry, clean, and ventilated ar