1、_ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising there
2、from, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2017 SAE International All rights reserved. No part of this p
3、ublication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada)Tel: +1 724-776-4970
4、 (outside USA)Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/standards.sae.org/AS8020 AEROSPACESTANDARDAS8020 Issued 1980-01 Reaffirmed 2017-10 Minimum Performance Standards fo
5、r Engine Driven D.C. Generators/Starter-Generators and Associated Voltage Regulators RATIONALEAS8020 has been reaffirmed to comply with the SAE Five-Year Review policy. 1. GENERAL STANDARDS1.1 Scope : This Aerospace Standard (AS) covers the general minimum performance standards for generators/starte
6、r-generators and associated voltage regulators for use in direct current (DC) electric systems for civil aircraft.1.2 Manufacturers Declaration : The manufacturer shall declare the following generator or regulator ratings and characteristics. These “declared“ values shall be the same as those values
7、 termed “rated“ under all sections of this AS.1.2.1Generator :(1) Rated Terminal Voltage(2) Rated Load Current(3) Minimum Blast Cooling Requirement (If Blast Cooling is to be Used)(4) Rated Speed Range(5) Continuous Operating Speed(6) Minimum Speed for Regulation(7) Maximum Speed for Regulation(8) M
8、aximum Overspeed(9) Minimum and Maximum External Field Resistance in Series With the Shunt Field(10) Maximum Operating Altitude(11) Allowable Brush and Commutator Wear (If Applicable)(12) Maximum Static Torque (If Applicable)(13) Equalizing Voltage (If Provided) at Rated Load Current(14) Overhung Mo
9、ment, With Respect to the Drive Pad(15) Terminal Block Cover (If Provided)(16) Type and Rating of Battery (If Required for Start-Up Excitation or Ripple Voltage Test)(17) Maximum Allowable Starter Current and Voltage(18) Rated Starter Locked Rotor Torque1.2.2 Regulator:(1) Rated Voltage(2) Rated Max
10、imum Controlled Field Current(3) Minimum Blast Cooling Requirement (If Blast Cooling is to be Used)(4) Minimum and Maximum Effective Regulator Resistance in Series With Generator Field(5) Maximun Operating Altitude(6) Range of Set Voltage Adjustment (If Adjustable)1.3 Effect of Tests : As a minimum
11、performance requirement, the equipment shall complete all tests under sections (2) and (3) without maintenance. There shall be no evidence of detrimental electrical or mechanical degradation.1.4 Test Samples : Tests under Sections (2) and (3) may performed in any sequence and using no more than two
12、(2) test generators or regulators. Section (4) tests may be performed in combination with Section (2) and (3) tests or performed separately on additional generators or regulators.1.5 System Description : Applicable performance tests described herein shall be met with a compatible generator and regul
13、ator. A battery shall not be included unless otherwise declared by the manufacturer.2. MINIMUM PERFORMANCE UNDER STANDARD CONDITIONSTests under this section shall be performed under the Standard Test Conditions described in Addendum (A).2.1 Generator Rating : The generator shall provide the continuo
14、us rated output current and voltage over the continuous operating speed range.2.2 Overload Capacity : Unless otherwise declared by the manufacturer, the generator shall deliver 150% rated current for two (2) minutes and 200% rated current for five (5) seconds at the minimum speed. IN NO CASE SHALL T
15、HE GENERATOR OVERLOAD CAPACITY BE LESS THAN 120% OF RATED CURRENT.2.3 Speed :2.3.1 Speed Range : The continuous operating speed range shall be that range over which the generator provides continuous rated output current and voltage.2.3.2 Minimum Speed for Regulation : When the generator is driven at
16、 minimum speed for regulation, it must deliver continuous rated current at rated voltage with not less than 0.5 ohm resistance connected in the external field circuit.2.3.3 Overspeed : The generator shall be capable of being driven at an overspeed equal to 115% of the maximum rated speed for five (5
17、) minutes without mechanical failure or impairment of electrical performance. This test shall be made with the generator control field circuit open and while the generator is hot from ANY prior test.2.3.4 Maximum Speed for Regulation : When the generator is driven at the maximum speed for regulation
18、, it must provide not more than rated voltage with 300 ohms or less resistance in the control field. Generators which do not have a control field shall be as specified by the manufacturer.2.4 Output Voltage :2.4.1 Steady State Voltage Regulation : When operating as a system, the Generator and Regula
19、tor shall have a voltage at the Point of Regulation that remains within 2.5% of the Regulator set voltage when operating at the minimum speed for regulation, maximum speed for regulation and at speed midway between these two speeds. At each test speed, the system shall be operated at no load, 25%, 5
20、0% and 100% rated current and the regulation values recorded. No Regulator adjustments are permitted during these tests. If the Regulator set voltage is adjustable, the adjustment range shall be declared by the manufacturer.2.4.2 Transient Voltage : During the application and removal of loads, the t
21、ransient voltage and recovery time shall not exceed the limits specified by Fig. 1.2.4.3 Ripple Voltage : The generator peak ripple voltage shall not exceed 7% of the nominal DC output voltage when operated at 120% minimum rated speed at 25% and 50% load. The field must be controlled by a manual rhe
22、ostat when making this test. See Fig. 2.2.5 Commutation (Brush Type Designs) : During operation of the generator over the load and speed range there must be no more than fine pin point sparking of the brushes. For Starter-Generators, commutation during starter operation should not damage the commuta
23、tor or degrade subsequent performance.2.6 Dielectric Strength : The generator and/or regulator must withstand, without evidence of breakdown, a test voltage of 500 volts r.m.s. at 50 or 60 Hertz for one (1) minute or 600 volts r.m.s. for one (1) second. The test voltage shall be applied between elec
24、trical circuits and frame and between mutually insulated circuits. Where the electrical circuits are intentionally grounded to frame for RFI control, the grounding circuit may be disconnected for this test.SAE INTERNATIONAL AS8020 Page 2 of 8_ 2.7 Equalizing Voltage : Where provided, the equalizing
25、voltage must be within 10% of the specified equalizer voltage. Equalizer voltage shall be determined under stabilized conditions of 25 C 15% inlet air temperature, rated load current, rated continuous operating speed and with the recommended cooling.2.8 Parallel Operation : With two or more generato
26、rs feeding a common bus, load division over the rated generator speed range shall remain within 10% of the generator rated current from 25% to full rated load current. This test may be conducted with all generators at the same speed. There shall be no sustained oscillations of the load sharing in ex
27、cess of 5% of the generator rated current.2.9 Generator Compounding : For any speed within the specified speed range, the excitation current must increase with an increase in generator load up to the full load capacity.2.10 No Load Speed (Starter-Generators Only) : When operated at no load in the st
28、arter mode, with the maximum rated starter voltage applied and with the control field system specified by the manufacturer, the machine shall not achieve excessive speeds nor incur electrical or mechanical failure.2.11 Starter-Generator Cranking Speed/Torque : When operated as a starter, the starter
29、 must be capable of delivering rated locked rotor torque at the rated maximum current and voltage.2.12 Shear Section : A shear section or device shall be provided at the generator input that mates with the engine accessory drive (spline or gear type). This section shall shear at rated static shear t
30、orque (10%) The shear section shall be so designed that its shearing action will not result in loose pieces which could damage adjacent or associated components. Belt driven generators need not meet the shear section requirements.3. MINIMUM PERFORMANCE UNDER ENVIRONMENTAL CONDITIONSAll generators an
31、d regulators must meet the requirements of the following paragraphs by actual test, similarity proof or by analysis. Unless otherwise specified, the applicable Environmental and Test Procedures referenced are in accordance with RTCA Document DO-160.3.1 Spike Susceptibility : While supplying full rat
32、ed load, the generator and/or regulator shall be subjected to ten (10) minutes of negative and positive spike voltages. The spike voltage shall have an amplitude of 600 50 volts and a duration of 10 5 microseconds for both positive and negative polarities. Thirty (30) positive and thirty (30) negati
33、ve spikes shall be applied at 10 2 second intervals.3.2 Radio Frequency Interference : The generator and/or regulator must meet the radiated and conducted emission limits of DO-160 when operated at the low and high end of the rated speed range. For each speed, 10% of rated load and full rated load s
34、hall be applied. Rated voltage is to be maintained throughout the test. In testing the generator, a manually controlled field rheostat may be used.3.3 Operating Position : The generator and regulator must be designed to operate continuously in any attitude. For test purposes, unless otherwise specif
35、ied, the normal continuous generator operating position shall be essentially horizontal.3.4 Temperature-Altitude:(1) 100 hours at rated continuous speed, rated terminal voltage, and rated load current at approximately sea level altitude at the maximum rated air inlet temperature.For regulators only
36、- The regulator shall control a generator operating at a speed which will cause the greatest variation in field current when full generator load is switched on and off. Once the variation in field current has been established, a simulator may be used for the generator, provided that the minimum and
37、maximum values of field current are the same as those obtained with the generators. The load shall be switched on for five seconds and off for five seconds. Sufficient readings shall be taken to establish the variation. During the test, the voltage at the point of regulation shall remain within 2.5%
38、 of the regulator set voltage. No voltage adjustment shall be permitted during the test.SAE INTERNATIONAL AS8020 Page 3 of 8_ 3.4 (Continued)(2) 100 hours at rated continuous speed, rated terminal voltage, and rated load current at maximum operating altitude. Test periods shall be not less than six
39、hours continuous.For regulators only - The regulator shall control the same generator or simulator used in the 100 hour sea level test, either of which may be located outside of the altitude test chamber. During the test, the voltage at the point of regulation shall remain within 2.5% of the regulat
40、or set voltage. No voltage adjustment shall be permitted during the test.(3) After completion of tests (1) and (2), generator brushes, if used, shall not have an accumulated wear exceeding 40% of allowable wear. Accumulated commutator wear shall not exceed 20% of allowable wear.For regulators only -
41、 After completion of tests (1) and (2), the requirements of paragraphs 2.3.4 and 2.4.1 must be met.(4) Low TemperatureFor regulators only - The regulator shall be subjected to the Low Temperature Test as set forth in paragraph 4.4 of the Environmental Test Procedures. Compliance shall be demonstrate
42、d by meeting the requirements of paragraphs 2.3.4 and 2.4.1, herein.(5) High TemperatureFor regulators only - The regulator shall be subjected to the High Temperature Test as set forth in paragraph 4.5 of the Environmental Test Procedures except that the equipment shall be operated for six (6) hours
43、 in lieu of the two (2) hours noted. Compliance shall be demonstrated by meeting the requirements of paragraphs 2.3.4 and 2.4.1, herein.3.5 Humidity : After being subjected to the humidity tests, as set forth in paragraph 6.0, category (A), of the Environmental Test Procedures, and:(a) Within one (1
44、) hour after completion of the humidity test, primary input power shall be applied. Within one (1) hour after applying primary input power, tests shall be initiated and consecutively performed without undue delay to demonstrate compliance to the requirements of paragraphs 2.3.2 (generator only), 2.3
45、.4, 2.4.1 (regulator only), 2.5 (generator only), and 2.6.3.6 Shock : Subject the equipment to the Operational Shock Tests as set forth in paragraph 7.0 of the Environmental Test Procedures. Following the application of the operational shocks:(a) The requirements of paragraphs 2.3.2 (generator only)
46、, 2.3.4, and 2.4.1 (regulator only) must be met.(b) All mechanical devices must operate satisfactorily.3.7 Vibration :(a) While the equipment is subjected to the vibration conditions as set forth in paragraph 8.0 of the Environmental Test Procedure, the requirements of paragraphs 2.3.2 (generator on
47、ly), 2.3.4, and, if applicable, 2.5 (generator only) must be met for generators. Regulators must meet paragraph 2.4.1 (regulator only).(b) After completion of vibration tests, the equipment must meet the dielectric tests of paragraph 2.6 of this standard.SAE INTERNATIONAL AS8020 Page 4 of 8_ 3.8 Tor
48、sional Vibration : The generator, when operated under the following conditions, shall limit the torsional vibration to no greater than the specified limits. Generators equipped with torsional vibration dampers only suitable for use on gas turbine engine must reflect this restriction on the nameplate of the machine. Verification tests must be conducted with a torsional vibration source whose inertia
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1