1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 4 Section HA-1990 Structural steelwork (sundry items) PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION HA CONTENTS Page Number SECTION :
4、 STRUCTURAL STEELWORK . 1 F?rst Revision August 1990 This section oP the code supersedes SABS 0120 : Part 4 : Section HA-1984 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 4 Section HA-1990 Structural steelwork (sundry i tems) SABS l200 HA : STRUCTURAL STEELWORK (
5、SUNDRY ITEMS) NOTE: See Clause 5 of the Introduction. .- Item No. -p- .l .l. 1 .1,2 .2 .2.1 .2.2 .2.3 .2.4 .2.5 -2.6 .2.7 .2.8 .2*9 .2.10 .2.11 .2.12 .2.13 .2.14 .2.15 -2.16 -2.17 .2.18 .2.19 ,3 .J.1 .3.2 .4 ,4.1 .4.2 A.3 4*4 11.5 4.6 Payment refers -, SABS 1200 HA 8.3.1 8.3.2 8.3.3 8,3.4 8.3.4 8.3.
6、5 1200 HC Short description SECrION : STRUCTURAL STEELWORK - STRUCTURES - , fabricat. and deliver FGR4 woTEF- mcwZZm- b) Manhole frames SUNDRIES -p- Wandrai l i ngg shown on Drg . . . . . Rail S: Handrai l s Kneeral l s Stanchions: Top mounted Side mounted Bends : 90“ bends 135“ bends 90“ end closur
7、es 135“ end closures Accessories: Ferrul es Pins Wall plates End plugs HD bolts Ladders with safet rungs, gal vanized, itl ed a) As shown Zi-E.7 1) 4 m long 2) G m long b) In pump chamber, various lengths and details as shown on Drg . O en grid flow-r a SlfeTTTioors and steps complete f and instal l
8、 ed with frames and wai l fixing to Drg . b) Heavy duty PVC floors to PSHA ERECTION -P Erect pumproom crawl beam under Instal l f l oorpl ate floors, and we1 d together, as specified in PSHA PROTECTION - Paint pumproom crawl beam to PSHA . . . . . Paint pumpr-oom frames to PSHA . Paint handrail supp
9、lied under Items .2.1 and .2.13, to PSHA . Gal vani ze pump chamber l adders Open grid floors and steps treated with . (state type or make) epoxy powdered coating to PSHA ., in lieu of bitumastic hot dip (Provisional ) Floorplate floors - painted to PSHA . . . . . Uni .t t t m m No. No. No. Na. No. No. No. No. No. No. Sets No. No. t Sum Sum 111 t t t t Sum L mZ m2 - Quantity - Rat Amount - late ( sabs pta
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1