1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause SAnS 0120 : Part 5 Section GA-1982 Corcrete (small works) PART 5 : CONTRACT ADMINISTRATION SECTION GA CONTENTS START OF CONSTRUCTION . 1 General 1
4、 IMMEDIATELY AFTER TIE HANDING OVER OF TllE SIT13 . 1 Action by Engineer . 1 Approval of materials l Otlier matters . 1 Action by Contractor 1 Other matters . 1 DURING CONSTRUCTION 1 Gereral 1 First Revision August 1982 This section of the code supersedes SABS 0120 : Part 5 : Section GA-19U0 Approve
5、d by the COUNClL OF THE SOUTll AFRICAN IjIJREAU OF S1ANUARL)S SAIS 0120 : Part. 5 Section (;A-19112 Coricrctx (small works) SABS 1200 GA : CONCRETIS (SMALL WOWS) NOTE: The clause number(s) given at the beyinniq or after the heading oE a clause is/are, uiilerjs otherwise stated, the number(s) of the
6、relevant clause(s) of SAIG 1200 GA. START OF CONSTRUCTION GENERAL,. For the purposes of this part of the code, contract administration stdrt.s wii.11 iistructi) to the contractor to comnience work as set out in Subclause 4.1 of Section 0. Jt4NCIJATI:LY AFTER TllE IIANDING OVER OF TIII.: SllX ACTION
7、BY ENGtNEER Approval of Materials (Subclause 3.1). In order to avoid delays, where prior approval of ayyreyates and, when applicable, water, is required, the engineer should iilicatc the date by which 11e must receive samples for approval. A time OF receipt 7 d before the date on which orrlt?rp jre
8、to be placed is sufficiently early for aggregates that comply with the requirements of SmS IOWr) but far too l-lc for those that do not comply and those that have unknown charact.eristics. Other Matters. (See 3.1 below.) ACTION BY CONTRACTOR Other Matters. (See 3.1 below.) DURING CONSTRUCTION GENERAL. In addition to the recommendations set out in Clauses 1 and 2 above, thuse given in Section G should be applied, where relevant, to the construction of small works. 1) Ayyregates from natural sources. sahs PIA