1、PD CEN/TR 15840:2009 ICS 91.100.30 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW PUBLISHED DOCUMENT Evaluation of conformity of fly ash for concrete Guidelines for the application of EN 450-2This Published Document was published under the authority of the Standards Policy an
2、d Strategy Committee on 30 September 2009 BSI 2009 ISBN 978 0 580 63108 5 Amendments/corrigenda issued since publication Date Comments PD CEN/TR 15840:2009 National foreword This Published Document is the UK implementation of CEN/TR 15840:2009. The UK participation in its preparation was entrusted t
3、o Technical Committee B/517, Concrete. A list of organizations represented on this committee can be obtained on request to its secretary. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. Compliance with a Brit
4、ish Standard cannot confer immunity from legal obligations.PD CEN/TR 15840:2009 TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CEN/TR 15840 January 2009 ICS 91.100.30 English Version Evaluation of conformity of fly ash for concrete - Guidelines for the application of EN 450-2 Evaluation de l
5、a conformit de cendres volantes pour le bton - Guide pour lapplication de lEN 450-2 Bewertung der Konformitt von Flugasche fr Beton - Leitlinien fr die Anwendung von EN 450-2 This Technical Report was approved by CEN on 18 November 2008. It has been drawn up by the Technical Committee CEN/TC 104. CE
6、N members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sw
7、eden, Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2009 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members
8、. Ref. No. CEN/TR 15840:2009: EPD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 2 Contents 1Foreword 4 Introduction .5 1 Scope 6 2 Normative references 6 3 Terms and definitions .6 3.1 Specific definitions 6 3.2 General definitions 8 4 Tasks for the producer 9 4.1 Factory production control .9 4.2 Interna
9、l quality control . 13 4.3 Autocontrol testing of samples . 16 5 Tasks fro the certification body 19 5.1 General . 19 5.2 Surveillance, assessment and acceptance of the production control 19 5.3 Evaluation of the results of autocontrol testing of samples 21 5.4 Audit testing of samples taken at the
10、production plant/depot and initial type testing . 24 5.5 Initial inspection of the production plant and the production control 27 5.6 Evaluation of test results during the initial period 29 6 Actions in the event of non-conformity 30 6.1 Actions to be taken by the producer 30 6.2 Actions to be taken
11、 by the certification body 30 7 Procedure for third party certification of conformity 31 8 Certificate of conformity and conformity mark . 34 8.1 Indication of conformity . 34 8.2 Certificate of conformity 36 8.3 Conformity mark . 36 9 Requirements for dispatching centres . 37 9.1 General requiremen
12、ts . 37 9.2 Tasks for the intermediary . 37 9.3 Tasks for the third party . 38 Annex A (normative) Evaluation of the representativeness and the accuracy of the fineness test results 41 A.1 General . 41 A.2 Sets of results considered . 41 A.3 Evaluation procedure . 41 Annex B (informative) General de
13、finitions 44 B.1 Definitions based on the Construction Products Directive . 44 B.2 Definitions from or based on EN 45020 44 B.3 Definition from EN ISO 9000 44 B.4 Definitions from EN 197-1 and EN 196-7 45 Bibliography . 46 1 The numbering and headings of clauses follow those in EN 450-2:2005. PD CEN
14、/TR 15840:2009 CEN/TR 15840:2009 (E) 3 Tables Table 1 Actions to be taken by the certification body in the event of non-conformity of the results of autocontrol and/or audit testing . 39 Table 2 Confirmation and audit testing of samples of certified fly ash taken at dispatching centres: properties a
15、nd minimum testing frequencies a40 Table A.1 Symbols . 42 Figures Figure 1 Typical sequence of evaluations of the autocontrol test results for fly ash (control period 12 months, based on the minimum frequency of two evaluations per year) 22 Figure 2 Typical evaluations of autocontrol test results (s
16、ee 5.3.4). 23 PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 4 Foreword This document (CEN/TR 15840:2009) has been prepared by Technical Committee CEN/TC 104 “Concrete and related products”, the secretariat of which is held by DIN. Attention is drawn to the possibility that some of the elements of this
17、document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 5 Introduction The purpose of this Guidelines Document is to provide explanatory detail on points not fully elabora
18、ted in EN 450-2:2005 “Fly ash for concrete Part 2: Conformity evaluation“. It is intended for use by producers and by certification bodies involved in the certification of fly ash following EN 450-1 and EN 450-2, in particular for the issuing of an EC Certificate of Conformity. This document does no
19、t deal with the necessary internal procedures that the certification bodies will have. It is an objective of this Guidelines Document that its use will assist in the establishment of equivalent procedures for certification of fly ash. It is expected that, following this document, traditional good pr
20、ocedures and practices that may be different can continue to be used, provided that they are not in contradiction with EN 450-1:2005 and EN 450-2. Such existing good procedures and practices, applied in conjunction with these Guidelines, are not considered to be an impediment to the achievement of t
21、he uniform level of certification throughout Europe, and by different certification bodies that is expected from the application of EN 450-2 together with these Guidelines. This Guidelines Document is based on existing situations for production, evaluation of conformity and certification of fly ashe
22、s. It may happen that certification bodies be confronted by a situation different to those included in this document. In such a case, specific procedures should be elaborated on a case by case situation and be approved and fully recorded by the Certification Body. These specific procedures should al
23、ways fulfil the requirements of EN 450-1:2005 and EN 450-2 and lead to the same level of confidence in product conformity that would be achieved by application of this Guidelines Document. The clause numbering system of EN 450-2 is followed. The text of each of the clauses of the Standard is reprodu
24、ced in full and is followed by guidance, which is provided only for those clauses where clarification or elaboration is needed. PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 6 1 Scope This document specifies the scheme for the evaluation of conformity of fly ash according to EN 450-1:2005. The document
25、 provides technical rules for the production control by the producer, including autocontrol testing of samples. It also provides rules for actions to be followed in the event of non-conformity, the procedure for the certification of conformity and requirements for dispatching centres. Guidance EN 45
26、0-2 deals with the evaluation of conformity of fly ash submitted for certification. It deals in particular with cases where “further testing” of the product is undertaken, as is the case for attestation system 1 + under the Construction Products Directive. The product for which EN 450-2 applies is d
27、efined in EN 450-1:2005 as fly ash for the production of concrete which consists of a fine powder of mainly spherical, glassy particles, derived from burning of pulverised coal, with or without co-combustion materials, which has pozzolanic properties. 2 Normative references The following referenced
28、documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 196-1, Methods of testing cement Part 1: Determination of strength EN 1
29、96-7, Methods of testing cement Part 7: Methods of taking and preparing samples of cement EN 450-1:2005, Fly ash for concrete Part 1: Definition, specifications and conformity criteria EN 450-2:2005, Fly ash for concrete Part 2: Conformity evaluation EN 451-2, Method of testing fly ash Part 2: Deter
30、mination of fineness by wet sieving 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 Specific definitions 3.1.1 certificate of conformity to EN 450-1:2005 document issued under the rules of a certain scheme for the evaluation of conformity ind
31、icating that adequate confidence is provided that fly ash is in conformity with EN 450-1:2005 Guidance The term “certificate of conformity” refers to certificates of conformity issued by a certification body under the rules of EN 450-2. This includes an EC Certificate of Conformity issued in relatio
32、n to the CPD. 3.1.2 conformity mark protected mark applied on the basis of the certificate of conformity (see 3.1.1) PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 7 Guidance The term “protected mark” includes registered mark, regulated mark and CE marking. 3.1.3 certified fly ash fly ash for which a ce
33、rtificate of conformity has been issued 3.1.4 initial period immediate period after the first issuing of the certificate of conformity for a fly ash 3.1.5 certification body impartial body, governmental or non-governmental, possessing the necessary competence and responsibility to carry out conformi
34、ty certification according to given rules of procedure and management 3.1.6 production control permanent internal control of fly ash production exercised by the producer consisting of internal quality control and autocontrol testing 3.1.7 production plant facility used by a producer for the producti
35、on of fly ash: a) power plant with one (several) boiler(s), b) processing plant, for example for the classification, selection, sieving, drying, blending, grinding and/or carbon reduction of fly ash(es). In the production plant, equipment has to be used which is suitable for production of fly ash in
36、cluding the necessary silo capacity for the storage and dispatch of the fly ash produced, and equipment to test, evaluate and control the fly ash production. This equipment and the production control applied allow the control of production with sufficient accuracy to ensure that the requirements of
37、EN 450-1:2005 are met Guidance Two categories of production plant are recognised: traditional power station facility where fly ash is produced as part of the production of electricity; processing plants that may or may not be on a power station facility, where ashes are altered in some manner. 3.1.8
38、 new production plant production plant which is not already producing fly ash certified under this scheme 3.1.9 existing production plant production plant which is already producing fly ash certified under this scheme PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 8 3.1.10 depot bulk fly ash handling fa
39、cility (not located at the production plant) used for the dispatch of fly ash (whether in bulk or bagged) after transfer or storage, where the producer has full responsibility for all aspects of the quality of the fly ash Guidance It is important to point out the difference between a depot and a dis
40、patching centre. The difference consists essentially of the linkage to the production plant and the responsibility for the quality of the fly ash. In the case of a depot, the facility is strictly linked to the production plant and is included in the production plant Works quality manual. The produce
41、r has full responsibility for the quality of the fly ash released from the depot. In a dispatching centre, in contrast, the facility is not at all linked to the production plant and it is an intermediary (an entity taking certified fly ash, acting independently and operating between the producer and
42、 a subsequent customer) who has full responsibility for the quality of the fly ash dispatched. A dispatching centre, being independent from the production plant cannot be included in a Works quality manual, but it has to ensure, using appropriate rules, that the quality of an already certified fly a
43、sh does not undergo any change. Depots are included in the Works quality manual. An entity other than the producer may own and operate the depot but it does this on behalf of and under the strict quality management responsibility of the producer. 3.1.11 dispatching centre bulk fly ash handling facil
44、ity (not located at the production plant) used for the dispatch of fly ash after transfer or storage where an intermediary has full responsibility for all aspects of the quality of the fly ash Guidance See guidance under 3.1.10 and 9.1. 3.1.12 intermediary natural or legal person who takes from the
45、producer fly ash certified according to EN 450-2 and bearing the conformity mark, who undertakes full responsibility for maintaining in a dispatching centre all aspects of the quality of the fly ash and who supplies the fly ash onwards to a further natural or legal person 3.1.13 confirmation autocon
46、trol testing continual testing carried out by an intermediary which consists of testing of samples taken by the intermediary at the point(s) of release from the dispatching centre 3.1.14 works quality manual document that provides information on the production control which is applied by a producer
47、at a particular production plant to ensure conformity of the fly ash with the requirements of EN 450-1:2005 3.1.15 producer the operator of the production plant or a person (natural or legal) authorised by the production plant and named in the certificate of conformity 3.2 General definitions See An
48、nex B (informative). PD CEN/TR 15840:2009 CEN/TR 15840:2009 (E) 9 4 Tasks for the producer 4.1 Factory production control 4.1.1 Concept Production control means the permanent internal control of fly ash production exercised by the producer. It consists of internal quality control (see 4.2) and autoc
49、ontrol testing 2of samples of fly ash taken at the point of release (see 4.3). NOTE The requirements of EN 450-2 as regards the production control take account of those clauses of EN ISO 9001 6 which are relevant to the production, process control and testing of fly ash. Guidance The purpose of production co
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1