1、Manual of Petroleum Measurement StandardsChapter 17.11Measurement and Sampling of CargoesOn Board Tank Vessels Using Closed and Restricted EquipmentEl Hydrocarbon Management HM 52SECOND EDITION, AUGUST 2016API MPMS Chapter 17.11/EI HM 52Measurement and Sampling of Cargoes On Board Tank Vessels Using
2、 Closed and Restricted EquipmentSecond EditionAugust 2016Published jointly byAPI and ENERGY INSTITUTE LONDONThe Energy Institute is a professional membership body incorporated by Royal Charter 2003Registered charity number 1097899Special Notes and DisclaimersAPI and EI publications are recommended f
3、or general adoption but should be read and interpreted in conjunction withWeights and Measures, Safety, Customs and Excise and other regulations in force in the country in which they are tobe applied. With respect to particular circumstances, local, state, and federal laws and regulations should ber
4、eviewed. Such regulatory requirements have precedence over corresponding clauses in API/EI publications.However, where requirements of API/EI publications are more rigorous, then their use is recommended. The information contained in this publication is provided as guidance only. Neither API and EI
5、nor any of API/EIsemployees, subcontractors, consultants, committees, or other assignees make any warranty or representation, eitherexpress or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, orassume any liability or responsibility for any use,
6、 or the results of such use, of any information or process disclosed inthis publication. Neither API and EI nor any of API/EIs employees, subcontractors, consultants, or other assigneesrepresent that use of this publication would not infringe upon privately owned rights.Users of this publication sho
7、uld not rely exclusively on the information contained in this document. Sound business,scientific, engineering, and safety judgment should be used in employing the information contained herein.API/EI joint publications may be used by anyone desiring to do so. Every effort has been made by the Instit
8、utes toensure the accuracy and reliability of the data contained in them; however, the Institutes make no representation,warranty, or guarantee in connection with this publication and hereby expressly disclaim any liability or responsibilityfor loss or damage resulting from its use or for the violat
9、ion of any authorities having jurisdiction with which thispublication may conflict. API/EI joint publications are published to facilitate the broad availability of proven, sound engineering and operatingpractices. These publications are not intended to obviate the need for applying sound engineering
10、 judgmentregarding when and where these publications should be utilised. The development and publication of API/EI jointpublications is not intended in any way to inhibit anyone from using any other practices.Nothing contained in any API/EI joint publication is to be construed as granting any right,
11、 by implication or otherwise, forthe manufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in the publication be construed as insuring anyone against liability for infringement of letters patent.API/EI are not undertaking to meet t
12、he duties of employers, manufacturers, or suppliers to warn and properly trainand equip their employees, and others exposed, concerning health and safety risks and precautions, nor undertakingtheir obligations to comply with authorities having jurisdiction.The above disclaimer is not intended to res
13、trict or exclude liability for death or personal injury caused by ownnegligence.The Energy Institute is a professional membership body incorporated by Royal Charter 2003.Registered charity number 1097899, EnglandCopyright 2016 by API, Washington DC and Energy Institute, London:All rights reserved.No
14、 part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher.ForewordThis publication was prepared jointly by the API Committee on Petroleum Measurem
15、ent (COPM) and the EIHydrocarbon Management Committee (HMC).The COPM and HMC are responsible for the production and maintenance of standards and guides covering variousaspects of static and dynamic measurement of petroleum. The API/EI Joint Committee on Hydrocarbon Management(JCHM), its subcommittee
16、s, and work groups consist of technical specialists representing oil companies, equipmentmanufacturers, service companies, terminal and shipowners and operators. The API/EI JCHM encouragesinternational participation, and when producing publications, its aim is to represent the best consensus of inte
17、rnationaltechnical expertise and good practice. This is the main reason behind the production of joint publications involvingcooperation with experts from both the API and EI.This standard is intended to provide guidelines for measurement and sampling of cargoes on board tank vesselsusing closed and
18、 restricted equipment. However, it is not intended to preclude the use or development of any othertechnologies or methods. To gain a better understanding of the methods described in this standard, the reader shouldreview in detail the latest editions of the publications, standards, and documents ref
19、erenced herein.SI units are used throughout this publication as the primary units of measure because this system is commonly usedin measurement and sampling. However, US Customary (USC) units continue to be used in some applications.Therefore, both SI and USC units are shown (with USC in parentheses
20、).This standard is not intended to supersede any safety or operating practices recommended by organizations such asthe International Maritime Organization (IMO), International Chamber of Shipping (ICS), and Oil CompaniesInternational Marine Forum (OCIMF), or individual operating companies, nor is th
21、e publication intended to supersedeany other safety or environmental considerations, local regulations, or the specific provisions of any contract.All shipboard procedures described in this standard should be performed by or in the presence of the ships master orthe designated representatives. For r
22、easons of safety, only approved equipment certified intrinsically safe orotherwise approved suitable for its intended use shall be used.API/EI standards are published as an aid to procurement of standardized equipment and materials and/or as goodpractice procedures. These standards are not intended
23、to inhibit purchasers or producers from purchasing orproducing products made to specifications other than those of API or EI.Classified areas may vary depending on the location, conditions, equipment, and substances involved in any givensituation. Users of this standard should consult with the appro
24、priate authorities having jurisdiction. Users of thisstandard should not rely exclusively on the information contained in this publication. Sound business, scientific,engineering, and safety judgment should be used in employing the information contained herein.Shall: As used in a standard, “shall” d
25、enotes a minimum requirement in order to conform to the requirement.Should: As used in a standard, “should” denotes a recommendation or that which is advised but not required in orderto conform to the requirement.May: As used in a standard, “may” denotes a course of action permissible within the lim
26、its of a standard.Can: As used in a standard, “can” denotes a statement of possibility or capability.This publication was produced following API/EI standardization procedures that ensure appropriate notification andparticipation in the developmental process and is designated as an API/EI standard.Qu
27、estions concerning the interpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005, U
28、SA, or the Technical Department, Energy Institute, 61 New Cavendish Street, London, W1G 7AR, UK.Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the Director of Standards (API) or the Technical Department (EI). Generally,
29、API/EI standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-time extension of up to two years may be added to this review cycle. Status of the publication can be ascertained from the API Standards Department, 1220 L Street, NW, Washington, DC 20005, USA, or t
30、he EI Technical Department, Energy Institute, 61 New Cavendish Street, London, W1G 7AR, UK.A catalogue of API publications can be found at www.api.org/publications.A catalogue of EI publications can be found at https:/publishing.energyinst.org.Suggested revisions are invited and should be submitted
31、to the Standards Department, API, 1220 L Street, NW, Washington, DC 20005, USA, standardsapi.org, or to the Technical Department, Energy Institute, 61 New Cavendish Street, London, W1G 7AR, UK.Contents1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Normative References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Terms and Definitions. . . . . . . . . . . . . . . . . . . . . .
33、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Health and Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.1 General . . . . . . . . . . . . . . . . . . .
34、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.2 Static Electricity Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44.3 Health
35、 Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Types of Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36、. . . . . . . . . . 45.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.2 Gauging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.3 Sampling Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65.4 Sampler Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.5 Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96 Standpipes . . . . . . . . . . . . .
39、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107 Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
40、.1 Gauging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117.2 Temperature Measurement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41、. . . . . . . . . . . . . 137.3 Sampling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148 Vapor Control Valves (Recommended Size and Type) . . . . . . . . . . . . . . . . . . . . . . . . .
42、 . . . . . . . . . . . . . . . . 159 Gauge Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169.2 Additional Gauging Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169.3 Capacity Calibration Table Changes . . . . . . . . . . . . .
44、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169.4 Gauge Point Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1610 Vessel Capacity/Calibration . . . . . . . . . .
45、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1610.1 Certification of Capacity/Calibration and Wedge Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1610.2 Missing Capacity/Calibration Tables. . . . . .
46、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16Annex A (informative) Form A.1 Measurement Equipment Comparison Report . . . . . . . . . . . . . . . . . . . . . . . . . 17Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
47、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19Figures1 Restricted Gauging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 Closed Gauging Equipment . . . . . .
48、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 Small Volume PSU (2 in.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 Large Volume PSU (4
49、in.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 DIP ROD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96 Gas Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 7 Tank Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1