1、Care, Maintenance, and Inspection of Coiled TubingAPI RECOMMENDED PRACTICE 5C8FIRST EDITION, JANUARY 2017Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither
2、API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of theinformation contained herein, or assume any liability or responsibility for any us
3、e, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors,consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyon
4、e desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, orguarantee in connection with this publication and hereby expressly disclaims any liability or responsibili
5、ty for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are published to facilitate the broad availability of proven, sound engineering and operatingpractices. These publications are not intended
6、 to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized. The formulation and publication of API publicationsis not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials i
7、n conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard. API does not represent,warrant, or guarantee that such products do in fact conform to the applicable API standard.Users of this recommended practic
8、e should not rely exclusively on the information contained in this document. Soundbusiness, scientific, engineering, and safety judgment should be used in employing the information contained herein.All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system,
9、 or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005.Copyright 2017 American Petroleum InstituteForewordNothing contain
10、ed in any API publication is to be construed as granting any right, by implication or otherwise, for themanufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in the publication be construed as insuring anyone against liability for
11、infringement of letters patent.The verbal forms used to express the provisions in this recommended practice are as follows: the term “shall” denotes a minimum requirement in order to conform to the recommended practice; the term “should” denotes a recommendation or that which is advised but not requ
12、ired in order to conform to therecommended practice; the term “may” is used to express permission or a provision that is optional; and the term “can” is used to express possibility or capability.This document was produced under API standardization procedures that ensure appropriate notification andp
13、articipation in the developmental process and is designated as an API standard. Questions concerning theinterpretation of the content of this publication or comments and questions concerning the procedures under whichthis publication was developed should be directed in writing to the Director of Sta
14、ndards, American PetroleumInstitute, 1220 L Street, NW, Washington, DC 20005. Requests for permission to reproduce or translate all or any partof the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at leas
15、t every five years. A one-timeextension of up to two years may be added to this review cycle. Status of the publication can be ascertained from theAPI Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is publishedannually by API, 1220 L Street, NW, Washingto
16、n, DC 20005.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW,Washington, DC 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17、. . . . . . . . . . . . . . . . . . . . . . . 12 Normative References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Terms, Definitions, Acronyms, and Abbreviations . . . . . . . . . . . . . . . . . . . . . .
18、 . . . . . . . . . . . . . . . . . . . . . . . 13.1 Terms and Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13.2 Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.1 Applications of Coiled Tubing . . . . . . . . . . . . . . . . . .
20、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.2 Responsibility of the Purchaser . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.3 Naturally Occurring Radioactive Materials (NORMs)
21、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.4 Properties of Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 Welding Coiled Tubing . . . . . . . . . . . . . .
22、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.2 Type of Wel
23、ds Used in CT Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.3 Welding Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、. 95.4 Welding Procedure and Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95.5 Tube-to-Tube Weld Procedure Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25、115.6 Tube to End-fitting WPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125.7 Qualifying Weld Procedure Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
26、. . . . . 135.8 Welder and Welding Operator Qualification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145.9 Inspection of Coiled Tubular Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27、. . . . . 165.10 Field Management of Coiled Tubular Welds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175.11 Welds in CT Product for Sour Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
28、 . . . . 185.12 Butt Welds and Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 186 CorrosionEffects and Mitigation in Steel Coiled Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
29、. . . 196.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 196.2 General Comments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30、 . . . . . . . . . . . . . . . . . . . . . 196.3 Corrosion and Environmental Cracking (EC) of Coiled Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 196.4 Effects of Corrosion on Coiled Tubing Serviceability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
31、 . . . . . . . . 216.5 Corrosive Fluids in Coiled Tubing Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226.6 Environmental Cracking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32、 . . . . . . . . . . . . . 226.7 Specific Guidelines to Reduce the Risk of Coiled Tubing Environmental Cracking Failures in Wet Sour Wells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246.8 Corrosion Related to Insert
33、s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 257 String Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 257.1 Pr
34、otection for Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 257.2 Coiled Tubular Reel Dimension Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
35、 268 Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 278.1 Used Coiled Tubulars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36、. . . . . . . . . . . . . . . . . 278.2 Drifting of Used Coiled Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 288.3 Drift Ball Standoff for Flash-free Coiled Tubing (SR,O) . . . . . . . . . . . . . . . . . . . . . . .
37、. . . . . . . . . . . . . . . . . . 298.4 Pressure Testing of Used Strings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308.5 Imperfections in Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38、. . . . . . . . . . . . . . . . . . . . . . . . 308.6 Mechanical Testing Procedures for Used Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 369 Nondestructive Inspection and Testing of Used Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . .
39、 . . . . . . . 379.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37vContentsPage9.2 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389.3 Qualification of Nondestructive Inspection Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 399.4 Light Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 399.5 Visual and Dimensional Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 409.6 Length. . . . . . . . . . . . . . . . . . . . . . . . . . . .
42、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 419.7 Wall Thickness Measurement Using Ultrasonic Compression Waves . . . . . . . . . . . . . . . . . . . . . . . . . . . . 419.8 Wall Thickness Measurement Using Electromagnetic and Gamma Ray
43、Methods . . . . . . . . . . . . . . . . . . 439.9 Transverse Imperfection Detection by Electromagnetic Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 449.10 Longitudinal Imperfection Detection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44、 . . . . . . . . . . . . . 459.11 Ovality Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 469.12 Prove-up of Indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
45、 . . . . . . . . . . . . . . . . . . . . . . . . . . 469.13 Magnetic Particle Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 479.14 X-radiography of Tube-to-Tube Welds or Other Sections. . . . . . . . . . . . . .
46、 . . . . . . . . . . . . . . . . . . . . . . . . . 489.15 Radiographic Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 499.16 Ultrasonic Inspection of Tube Welds and Other Tube Sections . . . . . . . . . . .
47、. . . . . . . . . . . . . . . . . . . . . . 509.17 Ultrasonic Inspection of Seam Weld Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 519.18 Ultrasonic Inspection of Skelp-end Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
48、 . . . . . . . . . . . . . . . . . . . . . 519.19 Ultrasonic Inspection of Tube-to-Tube and Pipe-to-Pipe Butt Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 519.20 Liquid Penetrant Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49、 . . . . . . . . . . . . . . . . . 529.21 Removal of Surface Imperfections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5210 Assessment of Coiled Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5310.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5310.2 Fatigue Life and Fatigue Management of Coiled Tubing . . . . . .
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1