1、Environmental Protection for Onshore Oil and Gas Production Operations and LeasesAPI RECOMMENDED PRACTICE 51R FIRST EDITION, JULY 2009REAFFIRMED, DECEMBER 2015Environmental Protection for Onshore Oil and Gas Production Operations and LeasesUpstream SegmentAPI RECOMMENDED PRACTICE 51R FIRST EDITION,
2、JULY 2009REAFFIRMED, DECEMBER 2015Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees
3、, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclos
4、ed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.Users of this document should not rely exclusively on the information contained in this document. Sound
5、 business, scientific, engineering, and safety judgment should be used in employing the information contained herein.API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and properly train and equip their employees, and others exposed, concerning health and saf
6、ety risks and precautions, nor undertaking their obligations to comply with authorities having jurisdiction.Information concerning safety and health risks and proper precautions with respect to particular materials and conditions should be obtained from the employer, the manufacturer or supplier of
7、that material, or the material safety datasheet.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connec
8、tion with this publication and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict.API publications are published to facilitate the broad availability
9、 of proven, sound engineering and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inh
10、ibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that suc
11、h products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the pu
12、blisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005.Copyright 2009 American Petroleum InstituteForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any
13、 method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.Shall: As used in a standard, “shall” denotes a minimum requirement in order to conform to the specifica
14、tion.Should: As used in a standard, “should” denotes a recommendation or that which is advised but not required in order to conform to the specification. This document was produced under API standardization procedures that ensure appropriate notification and participation in the developmental proces
15、s and is designated as an API standard. Questions concerning the interpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American Petroleum Institute,
16、1220 L Street, NW, Washington, DC 20005. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-time exten
17、sion of up to two years may be added to this review cycle. Status of the publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually by API, 1220 L Street, NW, Washington, DC 20005.Suggested revisions a
18、re invited and should be submitted to the Standards Department, API, 1220 L Street, NW, Washington, DC 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19、. . . . . . . 12 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.1 Normative References. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20、 . . . . . . . . . . . . . . . . . . . . . . . 12.2 References for Operations on Federal Lands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22.3 References for All Onshore Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21、. . . . . . . . . . . . . . . . . . . . . . 23 Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Government Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.2 Surface Owners and Users. . . . . . . . . . . . . . . . . . . .
23、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Lease Roads. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35.1 Introduction . . . . . . . . . . . .
24、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35.2 Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25、 . . 35.3 Design and Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.4 Primitive or Nonconstructed Roads and Routes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
26、 . . . . 75.5 Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75.6 Reclamation and Abandonment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27、. . . . . . . . . . . . . . . . 86 Producing, Injection/Disposal Wells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86.1 Completion, Stimulation, and Workover Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
28、 . . . . . . . . . . . . 86.2 Well Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116.3 Well Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
29、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126.4 Plugging and Abandonment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 137 Lease Gathering and System Lines . . . . . . . . . . . . . . . . . . . . . . .
30、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147.2 Route Selection . . . . . . . . . . . . . . . . . . . .
31、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157.3 Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167.4 Construction a
32、nd Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177.5 Operation and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177
33、.6 Abandonment of Gathering and System Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188 Production and Water Handling Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188.1 Requirem
34、ent Determination (Preplanning Considerations). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188.2 Site Selection Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188.3 Facility Design
35、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 208.4 Construction Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36、 . . 258.5 Operation and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268.6 Waste and Residual Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、 . . . . . . . 278.7 Spill Prevention, Response, and Cleanup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 298.8 Environmental Assessment Before Purchase or Sale of Existing Fields and Leases . . . . . . . . . . . . . . . 318.9 Closure and Aban
38、donment of Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31Annex A Good Neighbor Practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34v1Environmenta
39、l Protection for Onshore Oil andGas Production Operations and Leases1 ScopeThis standard provides environmentally sound practices for domestic onshore oil and gas production operations. It is intended to be applicable to contractors as well as operators. Facilities within the scope of this document
40、include all production facilities, including produced water handling facilities. Offshore and arctic areas are beyond the scope of this document. Operational coverage begins with the design and construction of access roads and well locations, and includes reclamation, abandonment, and restoration op
41、erations. Gas compression for transmission purposes or production operations, such as gas lift, pressure maintenance, or enhanced oil recovery (EOR) is included; however, gas processing for liquids recovery is not addressed. Annex A provides guidance for a company to consider as a “good neighbor.” 2
42、 References2.1 Normative ReferencesThis recommended practice (RP) includes by reference, either in total or in part, the following standards and publications. Users should investigate use of the appropriate portion of the most recent editions of the publications listed below.API, API Environmental G
43、uidance Document: Onshore Solid Waste Management in Exploration and Production OperationsAPI, Guidelines for Commercial Exploration and Production Waste Management Facilities API Bulletin E2, Bulletin on Management of Naturally Occurring Radioactive Materials (NORM) in Oil and Gas ProductionAPI Bull
44、etin E3, Environmental Guidance Document: Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations API Specification 7B-11C, Specification for Internal-Combustion Reciprocating Engines for Oil-Field ServiceAPI Recommended Practice 7C-11F, Recommended Practice for I
45、nstallation, Maintenance, and Operation of Internal-Combustion EnginesAPI Recommended Practice 11ER, Recommended Practice for Guarding of Pumping Units API Bulletin 11K, Data Sheet for the Design of Air Exchange CoolersAPI Specification 11N, Specification for Lease Automatic Custody Transfer (LACT)
46、EquipmentAPI Specification 12B, Specification for Bolted Tanks for Storage of Production LiquidsAPI Specification 12D, Specification for Field Welded Tanks for Storage of Production LiquidsAPI Specification 12F, Specification for Shop Welded Tanks for Storage of Production LiquidsAPI Specification 1
47、2J, Specification for Oil and Gas Separators2 API RECOMMENDED PRACTICE 51RAPI Specification 12K, Specification for Indirect Type Oilfield HeatersAPI Specification 12L, Specification for Vertical and Horizontal Emulsion TreatersAPI Recommended Practice 12N, Recommended Practice for the Operation, Mai
48、ntenance and Testing of Firebox Flame ArrestersAPI Specification 12P, Specification for Fiberglass Reinforced Plastic TanksAPI Recommended Practice 12R1, Recommended Practice for Setting, Maintenance, Inspection, Operation, and Repair of Tanks in Production Service API Recommended Practice 49, Recom
49、mended Practice for Drilling and Well Servicing Operations Involving Hydrogen SulfideAPI Recommended Practice 53, Recommended Practices for Blowout Prevention Equipment Systems for Drilling WellsAPI Recommended Practice 55, Recommended Practices for Oil and Gas Producing and Gas Processing Plant Operations Involving Hydrogen SulfideAPI Bulletin 75L, Guidance Document for the Development of a Safety and Environmental Management System for Onshore Oil and Natural Gas Production Operations and Associated ActivitiesAPI Recommended Practice 2350, Overfill Protection for Storage Tanks in Petrol
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1