1、 ABSGUIDE FOR VESSELS INTENDED TO CARRY COMPRESSED NATURAL GASES IN BULK .2005 1 GUIDE FOR VESSELS INTENDED TO CARRY COMPRESSED NATURAL GASES IN BULK APRIL 2005 CORRIGENDA/EDITORIALS 30 January 2008 CORRIGENDA/EDITORIALS 31 March 2008 CORRIGENDA/EDITORIALS 1 July 2011 CORRIGENDA/EDITORIALS 6 March 2
2、012 CORRIGENDA/EDITORIALS 1 February 2014 Note: The Chapter/Section headings and references in the “Paragraph” column relate to the printed 2005 CNG Guide. Changes to Chapter 1 references noted in the “Comments” column are due to the publication of the consolidated ABS Rules for Conditions of Classi
3、fication (Part 1), which resulted in the Sections of Chapter 1 of the CNG Guide being renumbered (for example, Section 3 is now Section 2). See Notice No. 4. Page No. Paragraph Comments Table of Contents v TOC Add new note below Chapter 1, as follows, “See also separately published booklet ABS Rules
4、 for Conditions of Classification (Part 1)”. Chapter 1 Scope and Conditions of Classification 3 Foreword Add new second paragraph, as follows, Thus, Chapter 1 of this Guide specifies only the unique requirements applicable to vessels intended to carry compressed natural gases in bulk. These suppleme
5、ntal requirements are always to be used with the aforementioned Rules for Conditions of Classification (Part 1).”. Chapter 1 Scope and Conditions of Classification Section 3 Classification Symbols and Notations 11 1-3/1 (now 1-2/1) In first paragraph, reference “1-1-3/3 of the ABS Rules for Building
6、 and Classing Steel Vessels (Steel Vessel Rules)” to read “1-1-3/3 of the ABS Rules for Conditions of Classification (Part 1)”. Chapter 1 Scope and Conditions of Classification Section 6 Submission of Plans 17 - In first paragraph, reference “Section 1-1-7 of the Steel Vessel Rules” to read “Section
7、 1-1-7 of the ABS Rules for Conditions of Classification (Part 1)”. 18 1-6/xxix) (now 1-4/xxix) Reference “Chapter 3, Section 2 of the ABS Guide for Building and Classing Facilities on Offshore Installations” to read “Chapter 3, Section 2 of the ABS Rules for Building and Classing Facilities on Offs
8、hore Installations”. Chapter 1 Scope and Conditions of Classification Appendix 2 Abbreviations and References 48 1-A2/2 In Item iv), “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “Rules for Building and Classing Facilities on Offshore Installations”. 48 1-A2/2 De
9、lete Item v), “ABS Guide for Building and Classing Membrane Tank LNG Vessels”. Corrigenda/Editorials 1 February 2014 2 ABSGUIDE FOR VESSELS INTENDED TO CARRY COMPRESSED NATURAL GASES IN BULK .2005 Page No. Paragraph Comments Chapter 2 Risk Assessment and Special Studies Section 2 Requirements 59 2-2
10、/2.3 Reference “2-2/3” to read “Chapter 2, Section 4”. Chapter 3 Ship Survival Capability and Location of Cargo Tanks Appendix 1 Onboard Computers for Stability Calculations 5 (Notice 2) 3-A1/Table 1 In second-to-last row (Distance to unprotected openings or margin line from WL, if applicable), acce
11、ptable tolerance to read “5%/5 cm max”. 5 (Notice 2) 3-A1/Table 1 Delete “2” from Notes, to read as follows: “Notes: 1 Deviation in % = (base value applicants value)/base value 100. where the “base value” may be from the approved stability information or the results of master computer using an indep
12、endent program.” Chapter 4 Ship Arrangements Section 1 Segregation of Cargo Area 90 4-1/4 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 4 Ship Arrangements Section 6 Air
13、-locks 101 4-6/3 thru 6 Renumber second instance of Subsection 4-6/3 as 4-6/4 and subsequent Subsections accordingly. Chapter 4 Ship Arrangements Section 8 Athwartships, Bow, Stern and Turret (Internal/External) Loading and Unloading Arrangements 106 4-8/9 Reference “ABS Guide for Building and Class
14、ing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 4 Ship Arrangements Section 10 Access 109 4-10 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building an
15、d Classing Facilities on Offshore Installations”. Chapter 4 Ship Arrangements Section 11 Emergency Escape and Safe Refuge 111 4-11 In last line, “Bureau” to read “ABS”. Chapter 6 Process Pressure Vessels and Liquid, Vapor and Pressure Piping Systems Section 1 General 169 6-1/1 Reference “ABS Guide f
16、or Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. 169 6-1/2 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on
17、 Offshore Installations”. 169 6-1/3 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Corrigenda/Editorials 1 February 2014 ABSGUIDE FOR VESSELS INTENDED TO CARRY COMPRESSED NATURAL
18、 GASES IN BULK .2005 3 Page No. Paragraph Comments Chapter 6 Process Pressure Vessels and Liquid, Vapor and Pressure Piping Systems Section 2 Cargo and Process Piping 171 6-2/1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Cl
19、assing Facilities on Offshore Installations”. Chapter 6 Process Pressure Vessels and Liquid, Vapor and Pressure Piping Systems Section 6 Ships Cargo Hoses 181 6-6/2 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facil
20、ities on Offshore Installations”. Chapter 9 Cargo Tank, Cargo Handling, Cargo Process and Piping Overprotection and Vent System Section 1 General 217 9-1/1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on
21、Offshore Installations”. Chapter 9 Cargo Tank, CARGO Handling, Cargo Process and Piping Overprotection and Vent System Section 2 Pressure relief Systems 220 9-2/6 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilit
22、ies on Offshore Installations”. Chapter 9 Cargo Tank, CARGO Handling, Cargo Process and Piping Overprotection and Vent System Section 4 Size of Valves 225 9-4/2 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilitie
23、s on Offshore Installations”. Chapter 11 Electrical Installations Section 1 General 239 11-1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 12 Fire Protection And Fire Ex
24、tinction Section 1 Fire Safety Requirements 245 12-1/2 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 13 Mechanical Ventilation in the Cargo Area Section 1 Spaces Require
25、d to be Entered During Normal Cargo Handling Operations 259 13-1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. 261 13-1/9.3 Reference “1-1-A3/5.3 of the ABS Rules for Building a
26、nd Classing Steel Vessels” to read “1-1-A3/5.3 of the ABS Rules for Conditions of Classification (Part 1)”. Corrigenda/Editorials 1 February 2014 4 ABSGUIDE FOR VESSELS INTENDED TO CARRY COMPRESSED NATURAL GASES IN BULK .2005 Page No. Paragraph Comments Chapter 14 Instrumentation (Gauging, Gas Detec
27、tion and Cargo Handling Controls) Section 1 General 267 14-1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 14 Instrumentation (Gauging, Gas Detection and Cargo Handling
28、Controls) Section 3 Overflow Control (If Applicable) 271 14-3/1 Reference “6-6/4” to read “6-5/3”. Chapter 15 Use of Cargo as Fuel Section 1 General 283 15-1 Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities o
29、n Offshore Installations”. 283 15-1/4 Reference “ABS Guide for Design and Installations of Dual Fuel Engines” to read “ABS Guide for Propulsion Systems for LNG Carriers”. Chapter 17 Surveys Section 1 Surveys During Construction, Installation and Commissioning 303 17-1/1 Delete “The documentation req
30、uirements for review are given in 3-1/3 of this Guide.”. 305 17-1/2.3.1(g) Reference “ABS Guide for Shipbuilding and Repair Quality Standard for Hull Structures During Construction” to read “IACS Recommendation No. 47”. 305 17-1/2.4 Renumber Subparagraph 3.7.2 as Subparagraph 2.4.2. 307 17-1/2.10.1
31、Reference “ABS Guide for Building and Classing Facilities on Offshore Installations” to read “ABS Rules for Building and Classing Facilities on Offshore Installations”. Chapter 17 Surveys Section 2 Surveys After Construction and Maintenance of Class 314 17-2/2.5 Reference “Appendix 7-A-14 “Guide for
32、 Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)” to read, “Appendix 7-A-14 “Surveys Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)”. 319 17-2/3.2.1(f) Reference “17-2/3.3iv)” to read
33、“17-2/3.3.1iv)”. 339 17-2/3.4.8(a) Reference “ABS Facilities Guide” to read “ABS Facilities Rules”. 346 17-2/3.8.5(a) Reference “the ABS Guide for the Class Notation Tailshaft Condition Monitoring (TCM)” to read “4-3-2/13 of the Steel Vessel Rules”. 346 17-2/3.8.5(b)i) Reference “the ABS Guide for t
34、he Class Notation Tailshaft Condition Monitoring (TCM)” to read “4-3-2/13 of the Steel Vessel Rules”. Chapter 17 Surveys Section 3 Risk-based Surveys for Maintenance of Class 348 17-3/3.1.1 Reference “Appendix 7-A-14 “Guide for Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)” to read, “Appendix 7-A-14 “Surveys Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)”. 349 17-3/4 Reference “Chapter 3, Section 2” to read “17-2/1.3”.
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1