ABSGUIDE FOR VESSELS WITH OIL RECOVERY CAPABILITIES .2013 1 GUIDE FOR VESSELS WITH OIL RECOVERY CAPABILITIES DECEMBER 2013 CORRIGENDA/EDITORIALS 10 September 2014 Page No. Paragraph Comments Section 6 Hull Construction 12 6/5.1i) In second line, delete “in accordance with 6/9”. Section 7 Machinery Equipment and Systems 16 7/3.11i) Reference “4-6-1/3.3 of the Under 90m Rules” to read “4-6-1/3.7 of the Under 90m Rules”. 19 7/9.3.3iii) Reference “7/11.5i)” to read “7/11.5.1i)”. 20 7/11.1i) Reference “7/11.9” to read “7/11.5.2”. 20 7/11.3i) Reference “7/11.9” to read “7/11.5.2”.