1、 GUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS SEPTEMBER 2012 NOTICE NO. 3 January 2017 The following Changes were approved by the ABS Rules Committee on 19 December 2016 and become EFFECTIVE AS OF 1 JANUARY 2017. (See http:/www.eagle.org for the consolidated version of the Guide for the Classifi
2、cation of Drilling Systems 2012, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1/7.13.2.) SECTION 1 SCOPE AND CONDITIONS
3、OF CLASSIFICATION 5 Class Notation (Add new Paragraph 1/5.2, as follows:) 5.2 CDS Ready Notation (2017) The null CDS Ready class notation indicates that required design approvals, testing, system installation, and commissioning is complete with the exception of non-technical operational items requir
4、ing clarification between the manufacturer and builder prior to the facility commencing drilling operations and assignment of full CDS notation or full Sub Class notation. Examples of non-technical operational items include i) Operation Manuals ii) Data Books (Mini Review Books) iii) Manufacturers Certificates ABSGUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS .2012 1