1、 RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2016 Guide to Color Coding Used in Online Version of the Rules The following summarizes the colors corresponding to Rule Changes, Corrigenda items and editorial changes in the Rules files which are available for download. Rule Changes: Changes effect
2、ive 1 January 2016 Corrigenda: CORRIGENDA/EDITORIALS 22 February 2016 Editorials: Editorial Changes Notices and General Information RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2016 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New
3、 York 1862 Copyright 2015 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Table of Contents part Notices and General Information CONTENTS Introduction . 1 TABLE 1 Applicable Editions of Booklets Comprising 2016 Rules 2 TABLE 2 Division and Numbering of Rules and Gu
4、ides 2 Rule Change Notice (2016) . 3 TABLE 3 Summary of Changes from the 2015 Rules 3 ii ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2016 Notices and General Information Introduction 1. The year 2016 edition of the Rules for Building and Classing High-Speed Craft consists of the eight (8) b
5、ooklets as shown in Table 1. With regard to three booklets, Part 1, Part 2, and Part 7: a) The purpose of the generic title ABS Rules for Conditions of Classification High-Speed Craft (Part 1) is to reflect the expanded contents of PART 1, as a result of including consolidated requirements for “Clas
6、sification” applicable to all types of and sizes of high-speed craft as specified in the Foreword to Part 1. Additional specific requirements are contained in Chapters 2 and 3 of Part 1. b) The purpose of the generic title ABS Rules for Materials and Welding of PART 2 is to emphasize the common appl
7、icability of the requirements to ABS-classed vessels, other marine structures and their associated machinery, and thereby make PART 2 more readily a common “PART” of various ABS Rules and Guides, as appropriate. c) The purpose of the generic title ABS Rules for Survey After Construction (Part 7) is
8、to reflect the expanded contents of PART 7, as a result of including consolidated requirements for “Surveys After Construction” applicable to all types and sizes of vessels, barges and specific shipboard arrangements/systems, etc., as specified in Part 7, Chapter 1, Section 1. 2. The numbering syste
9、m applied in the Rules is shown in Table 2. 3. The primary changes from the 2015 Rules are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 2016, unless specifically indicated otherwise. 4. The effective date of each technical change since 1993 is shown
10、 in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995
11、) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 5. Until the next edition of the Rules for Building and Classing High-Speed Craft is published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS website www.eagle.org only, and w
12、ill be available free for downloading. It is not intended to publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides. The consolidated edition of the Rules for Building and Classing High-Speed Craft, which includes Rule Change Notices and/or Corrigenda using d
13、ifferent colors for easy recognition, will be published on the ABS website only when RCN and/or Corrigenda are issued. 6. The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS website www.eagle.org for download. ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2016 1 Noti
14、ces and General Information TABLE 1 Applicable Editions of Booklets Comprising 2016 Rules Notices and General Information 2016 Part 1: Rules for Conditions of Classification High-Speed Craft 2016* Part 2: Rules for Materials and Welding Rules for Testing and Certification of Materials Rules for Weld
15、ing and Fabrication 2016* Part 2: Rules for Materials and Welding Aluminum and Fiber Reinforced Plastics (FRP) 2016* Part 3: Hull Construction and Equipment 2016 Part 4: Craft Systems and Machinery 2016 Part 5: Specialized Craft and Services 2016 Part 7: Rules for Survey After Construction 2016* * N
16、ote: The latest edition of these Rules is to be referred to. These Rules may be downloaded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog. TABLE 2 Division and Number
17、ing of Rules and Guides Division Number Part Part 1 Chapter Part 1, Chapter 1 Section Section 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1 Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1 or Appendix 1-A1-1 Note: 1 An odd number
18、 (1, 3, 5, etc.) numbering system is used for the Rules and Guides. The purpose is to permit future insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text and associated cross-references, as applicable, within the Rules and a
19、ssociated process instructions, check sheets, etc. 2 ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2016 Notices and General Information Rule Change Notice (2016) TABLE 3 Summary of Changes from the 2015 Rules EFFECTIVE DATE 1 January 2016 shown as (2016) Part/Para. No. Title/Subject Status/Re
20、marks PART 1 Rules for Conditions of Classification High-Speed Craft 1-1-1/7 Scope of Classification To prohibit exceeding the design significant wave height for craft without the OE notation. 1-1-3/Table B Structural Notations To clarify the application of the OE notation. 1-2-2/1 Classification Ty
21、pe To align the requirements with 5-2-1/3.3 and 1-2-2/3. 1-2-2/3 Special Requirements To clarify the original wording “restricted service” and align the requirements with Paragraph 2 of the Preamble of the HSC Code. 1-2-2/7.3 Significant Wave Height To more clearly specify the significant wave heigh
22、ts for specific types of HSC, such as Coastal Craft, Riverine Craft, and Crewboats. EFFECTIVE DATE 1 July 2015 shown as (1 July 2015) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-1-2/T
23、able 2 Material Class or Grade of Structural Members To require the materials for other steering equipment components described in Section 3-2-8 to be of steel in accordance with the requirements of Part 2, Chapter 1. (Incorporates Notice No. 1) 3-2-7/13 (New) Energy Saving Devices (ESD) (Hull Appen
24、dages) To clearly identify design and survey requirements for energy saving devices (ESD) so that the hull welding, material compatibility and hull structural continuity evaluation during design and survey of these appendages must be assessed to identify any high stress concentrations together with
25、erosion/corrosion spots. (Incorporates Notice No. 1) 3-2-8/1.1 Application To clearly indicate steering equipment other than rudders in the Application section. (Incorporates Notice No. 1) 3-2-8/1.3 Materials for Rudder, Rudder Stock and Steering Equipment To specify that rudders and other steering
26、equipment are to comply with 3-1-2/Table 2. (Incorporates Notice No. 1) 3-2-13/1.1.4 (New) To add requirement for IMO PSPC (Section 3.3.2) and/or IMO PSPC-COT Regulations compliance. (Incorporates Notice No. 1) 3-5-1/19.3 Deck Fittings To reflect that ISO 3913 is now withdrawn and replaced by ISO 13
27、795. (Incorporates Notice No. 1) PART 4 Craft Systems and Machinery 4-5-2/9.1 Fixed Local Application Fire-fighting Systems To delete the reference to the vessels main propulsion and power generation, in line with IMO MSC.338(91). (Incorporates Notice No. 1) ABSRULES FOR BUILDING AND CLASSING HIGH-S
28、PEED CRAFT .2016 3 Notices and General Information EFFECTIVE DATE 1 January 2016 shown as (2016) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-2-1/9 Operating Manual To specify that the
29、 operating manual is to be ABS approved and to clarify the design environmental conditions in association with OE notation. 3-2-1/Table 2 Factor, K To clarify the wording “Restricted Service”, in line with 1-2-2/7. 3-2-8/7.3 Lower Rudder Stocks To remove “K” since material factor (K) is already incl
30、uded in the maximum allowable stress formula. 3-2-10/23.5 Design Forces for Securing or Supporting Devices of Doors Opening Outwards To clarify the wording “Restricted Service”, in line with 1-2-2/7. 3-5-1/1 General To remove the notation “Restricted Service”, in line with 1-2-2/7. 3-7-1/1 General T
31、o reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/1.3.2 To reflect the comments from Administrations and Industry Organi
32、zations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/3.3 Structural Testing To reflect the comments from Administrations and Industry Organizations considered during review of the propos
33、ed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/5 Testing Methods To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter
34、 II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/7.1.1 Leak Testing To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and
35、SDC meetings. 3-7-1/7.7 (New) Hydrostatic or Hydropneumatic Tightness Testing To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meeting
36、s. 3-7-1/9 (New) Alternative Procedure for Strength Testing To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/Table 1 T
37、esting Requirements for Tanks and Boundaries To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings. 3-7-1/Table 2 Application of L
38、eak Testing, Coating and Provision of Safe Access for Type of Welded Joints To reflect the comments from Administrations and Industry Organizations considered during review of the proposed Testing Guidelines associated with SOLAS Chapter II-1, Regulation 11, made during the IMO MSC and SDC meetings.
39、 PART 4 Craft Systems and Machinery 4-3-1/5.3.1 General To include the requirements of 2-3-7/1 for propulsion shafts and to clarify that the part can comply with only one, not all, specifications. 4-3-3/5.5.6 Keyless Coupling To align the requirements with industry practice. 4-4-2/7.5.7(b) Multi-cor
40、e Metallic Tubes Sheathed by Plastic Materials To align the requirements with the latest IEC requirements. 4 ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2016 Notices and General Information Part/Para. No. Title/Subject Status/Remarks 4-4-3/7 Emergency Bilge Suctions for Main Machinery Space
41、 To specify an adequate flow to the emergency bilge pump to maintain its discharge capacity. 4-4-4/1.1.3 Service and Settling Tanks To clarify the condition of special consideration for the capacity of the service tanks, in line with Annex 12 of the 2000 HSC Code. 4-4-4/3.7 Valves on Oil Tanks To al
42、ign the requirements with the latest IEC requirements. 4-4-7/1.3.3 Electrical Installation in Storage Room To align the requirements with the latest IEC requirements. 4-4-7/3.3.6 Electrical Equipment To align the requirements with the latest IEC requirements. 4-4-7/3.5.4 Electrical Equipment To alig
43、n the requirements with the latest IEC requirements. 4-6-1/3.9.2 To align the requirements with the latest IEC requirements. 4-6-1/3.21.1 Category “ia” To align the requirements with the latest IEC requirements. 4-6-1/3.23 Low Voltage To align the requirements with the latest IEC requirements. 4-6-1
44、/Table 3 Degree of Protection of Electrical Equipment (Second IP Numeral) To include degree of protection “IP X9”, in line with the latest IEC requirements. 4-6-2/1.3 Short-circuit Data To align the requirements with 4-8-1/5.1.3 of the Steel Vessel Rules. 4-6-2/9.5.2(a) Instantaneous Trip To specify
45、 that if generators are fitted with differential protection systems, then they need not simultaneously have a separate instantaneous trip function. 4-6-3/3.7.2(a) Large Batteries To align the requirements with the latest IEC requirements. 4-6-3/9.1.1(a) Electrical Equipment Types To align the requir
46、ements with the latest IEC requirements. 4-6-3/9.5.1 General To align the requirements with the latest IEC requirements. 4-6-4/7.13.1(a) Systems Exceeding 50 Volts To align the requirements with the latest IEC requirements. 4-6-4/7.13.1(b) Systems of 50 Volts and Less To align the requirements with
47、the latest IEC requirements. 4-6-4/10.5.10 Electrical Protection To clarify overvoltage, overcurrent and short circuit protection requirements of the semiconductor converter and the semiconductor devices associated with or contained within. To reduce the proscribed protection requirements is to allo
48、w equipment makers to provide protection for their semiconductor converters and semiconductor devices that is appropriate to the semiconductor technology that they utilize. To consolidate alarm annunciation requirements upon operation of the protection scheme. To remove the requirement for the provi
49、sion of an individual semiconductor fuse for each semiconductor device. 4-6-4/10.7 Inspection and Testing To align the requirements with the latest IEC requirements. 4-6-4/13.1.1 General To align the requirements with the latest IEC requirements. 4-6-4/13.1.2(a) Standards To align the requirements with the latest IEC requirements. 4-6-4/13.1.3 Fire Resistant Property To align the requirements with the latest IEC requirements. 4-6-4/Table 5 Factory Testing Schedule for Switchboards, Chargers, Motor Control Centers and Controllers To align the requirements with the latest
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1