1、 RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2016 Guide to Color Coding Used in Online Version of the Rules The following summarizes the colors corresponding to Rule Changes, Corrigenda items and editorial changes in the Rules files which are available for download. Rule Change
2、s: Changes effective 1 January 2016 Corrigenda: CORRIGENDA/EDITORIALS 22 February 2016 Editorials: Editorial Changes Rules for Building and Classing Floating Production Installations RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2016 American Bureau of Shipping Incorporated by Ac
3、t of Legislature of the State of New York 1862 Copyright 2015 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword Foreword These Rules specify the ABS requirements for building and classing Floating Production Installations (FPIs) that should be used
4、by designers, builders, Owners and Operators in the offshore industry. The requirements contained in these Rules are for design, construction, and survey after construction of the floating installation (including hull structure, equipment and marine machinery), the position mooring system and the hy
5、drocarbon production facilities. Floating installations of the ship-type, column-stabilized-type, tension leg platforms and spar installations are included, as well as existing vessels converted to FPIs. The requirements for optional notations for disconnectable floating installations, dynamic posit
6、ioning systems and import/export systems are also provided. These Rules are to be used in conjunction with other ABS Rules and Guides, as specified herein. The effective date of these Rules is 1 January 2016. In general, until the effective date, plan approval for designs will follow prior practice
7、unless review under these Rules is specifically requested by the party signatory to the application for classification. Changes to Conditions of Classification (1 January 2008) For the 2008 edition, Part 1, Chapter 1, “Scope and Conditions of Classification” was consolidated into a generic booklet,
8、entitled Rules for Conditions of Classification Offshore Units and Structures (Part 1) for all units, installations, vessels or systems in offshore service. The purpose of this consolidation was to emphasize the common applicability of the classification requirements in “Part 1, Chapter 1” to ABS-cl
9、assed offshore units, pipelines, risers, and other offshore structures, and thereby make “Conditions of Classification” more readily a common Rule of the various ABS Rules and Guides, as appropriate. Thus, Part 1, Chapter 1 of these Rules specifies only the unique requirements applicable to floating
10、 production installations. These supplemental requirements are always to be used with the aforementioned Rules for Conditions of Classification Offshore Units and Structures (Part 1). ii ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 Table of Contents RULES FOR BUILDING A
11、ND CLASSING FLOATING PRODUCTION INSTALLATIONS CONTENTS PART 1 Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) 6 Chapter 1 Scope and Conditions of Classification . 7 See also separately published booklet ABS Rules for Condition
12、s of Classification Offshore Units and Structures (Part 1) PART 2 Materials and Welding . 26 See separately published booklet ABS Rules for Materials and Welding (Part 2) PART 3 Installation Types, Functions, Features and General Requirements . 27 Chapter 1 General Description . 28 Chapter 2 Design
13、Basis and Environmental Loading . 37 Chapter 3 General Requirements . 48 Chapter 4 Installation, Hook-up and Commissioning . 52 Appendix 1 Abbreviations and References . 66 PART 4 Process and Import/Export Systems 70 Chapter 1 Hydrocarbon Production and Process Systems 69 Chapter 2 Import and Export
14、 Systems . 84 PART 5A Ship-Type Installations 94 Chapter 1 Design Considerations . 96 Chapter 2 Conversions to FPI 120 Chapter 3 Structural Design Requirements 149 Chapter 4 Ship-Type Installations Under 150 meters (492 feet) in Length 416 PART 5B Other Installation Types 445 Chapter 1 Column-Stabil
15、ized Installations 446 Chapter 2 Tension Leg Platforms . 465 Chapter 3 Spar Installations . 493 Appendix 1 Wave Impact Criteria . 519 ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 iii PART 6 Mooring Systems 525 Chapter 1 Position Mooring Systems . 526 Chapter 2 Single Po
16、int Moorings 537 Chapter 3 Mooring Systems Surveys . 541 PART 7 Surveys . 543 Chapter 1 Surveys During Installation and Commissioning . 544 Chapter 2 Surveys After Construction 557 Appendix 1 Guidance for the Class Notation, Storage Service 616 iv ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTI
17、ON INSTALLATIONS .2016 Notices and General Information Notices and General Information CONTENTS Introduction . 2 TABLE 1 Applicable Editions of Parts Comprising 2016 Rules 3 TABLE 2 Division and Numbering of Rules 3 Rule Change Notice (2016) 4 TABLE 3 Summary of Changes from the 2015 Rules 4 ABSRULE
18、S FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 1 Notices and General Information Introduction 1. The 2016 edition of the Rules for Building and Classing Floating Production Installations consists of the seven (7) Parts as shown in Table 1. In general these seven Parts subdivide
19、these Rules into parts that are more consistent with other ABS Rules. With regard to two Parts, Part 1, and Part 2: a) The purpose of the generic title ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of incl
20、uding consolidated requirements for “Classification” applicable to all types of and sizes of units, installations, vessels or systems in offshore service, etc., as specified in the Foreword to Part 1. Additional specific requirements are contained in Part 1 of these Rules for Building and Classing F
21、loating Production Installations. b) The purpose of the generic title ABS Rules for Materials and Welding of PART 2 is to emphasize the common applicability of the requirements to ABS-classed vessels, other marine structures and their associated machinery, and thereby make PART 2 more readily a comm
22、on “PART” of various ABS Rules and Guides, as appropriate. 2. The numbering system applied in the Rules is shown in Table 2. 3. The primary changes from the 2014 Rules are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 2016, unless specifically indica
23、ted otherwise. 4. The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after
24、 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 For certain changes that have a major impact on shipyards, designers and vendors, ABS has instituted a two-year Rule cycle to give
25、 the industry more time to prepare for these changes. The text of these changes will appear in a box along with the effective date just under the existing Rule requirement. 5. Until the next edition of the Rules for Building and Classing Floating Production Installations is published, Notices and/or
26、 Corrigenda, as necessary, will be published on the ABS website www. eagle.org only, and will be available free for downloading. It is not intended to publish hard copies of future Notices and/or Corrigenda to existing Rules or Guides. The consolidated edition of the Rules for Building and Classing
27、Floating Production Installations, which includes Notices and/or Corrigenda using different colors for easy recognition, will be published on the ABS website only when Notices and/or Corrigenda are issued. 6. The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS website www.e
28、agle.org for download. 2 ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 Notices and General Information TABLE 1 Applicable Editions of Parts Comprising 2016 Rules Rules for Building and Classing Floating Production Installations Notices and General Information 2016 Part 1
29、: Conditions of Classification (Supplement to the ABS Rules for Condition of Classification Offshore Units and Structures) (1)2016 Part 3: Installation Types, Functions, Features and General Requirements 2016 Part 4: Units Systems (Process and Import/Export) 2016 Part 5A: Ship-Type Installations 201
30、6 Part 5B: Other Installation Types 2016 Part 6: Mooring Systems 2016 Part 7: Surveys After Construction 2016 Rules for Conditions of Classification Offshore Units and Structures not included (1,2)Part 1: Rules for Conditions of Classification Offshore Units and Structures 2016 Rules for Materials a
31、nd Welding not included (2)Part 2: Rules for Materials and Welding 2016 Notes: 1 The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1). Additional specific requirements are contained
32、in Part 1 of these Rules. 2 The latest edition of these Rules is to be referred to. These Rules may be downloaded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog. TABL
33、E 2 Division and Numbering of Rules Division Number Part Part 1 Chapter Part 1, Chapter 1 Section Section 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1 Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1 or Appendix 1-A1-1 Note: 1 A
34、n odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text and associated cross-references, as applicable, within the Rules and
35、associated process instructions, check sheets, etc. ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 3 Notices and General Information Rule Change Notice (2016) TABLE 3 Summary of Changes from the 2015 Rules EFFECTIVE DATE 1 July 2015 shown as (1 July 2015) (based on the co
36、ntract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 7 Surveys 7-1-3/7.3vii) (New) To require survey of equipment which is to be used by the crew to periodically verify that the mooring lines have not failed/parted. (Incorporates Notice No. 1)
37、EFFECTIVE DATE 1 January 2016 shown as (2016) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 1 Conditions of Classification (Supplement to the ABS Rules for Condition of Classification Offshore Units and Structures) 1-1-2/
38、5.11.3 Conversion of Existing Vessel to FPSO, FPS or FSO To consider FPSOs converted from tankers for use at marginal fields. 1-1-4/3xv) (New) To require the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify that each mooring leg remai
39、ns intact. 1-1-4/11.3 Procedures To require the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify that each mooring leg remains intact. PART 3 Installation Types, Functions, Features and General Requirements 3-4-1/9viii) (New) To requi
40、re the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify that each mooring leg remains intact. 3-4-4/19 To require the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify t
41、hat each mooring leg remains intact. PART 5A Ship-Type Installations 5A-1-3/1.19 Bilge Keels To more comprehensively define the extent of structural evaluation required for bilge keel structures on FPIs. 5A-1-4/7.1.1ii) To clarify that the plate element size should not be less than the plate thickne
42、ss. 5A-1-4/7.1.2ii) To clarify that the plate element size should not be less than the plate thickness. 5A-1-4/7.1.3ii) To clarify that the plate element size should not be less than the plate thickness. 5A-1-5/1 General To update the requirements for analysis of topside structures on ship type inst
43、allations. 5A-3-2/13.1 Impact Loads on Bow To add definition for local bow impact angle ij in case the formula for ij calculation is not valid (for example when ij = 90 degrees at the front of the bow). 5A-3-3/7.7.4 Bottom Girders under Longitudinal Bulkhead To align the requirements with the ABS St
44、eel Vessel Rules, so that a tanker designed as per the Steel Vessel Rules may meet the FPI requirement when it is converted to an FPSO. PART 5B Other Installation Types 5B-2-4/1.7 Tendon Loads To align the requirements with API RP 2T for 1000-year survival conditions while remaining the positive ten
45、don tension requirement for DOC and DEC intact conditions. 4 ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2016 Notices and General Information Part/Para. No. Title/Subject Status/Remarks PART 6 Mooring Systems 6-1-1/13.3 Chain Stoppers To remove requirement to proof test cha
46、in stoppers. 6-1-1/13.5 Fairleads and Sheaves To remove requirement to proof test mooring fairleads. 6-1-1/1.5 Mooring Line Failure Monitoring To require the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify that each mooring leg remai
47、ns intact. PART 7 Surveys 7-2-4/5.1iv) (New) To require the design of the mooring system to include suitable arrangements and/or equipment for the crew to periodically verify that each mooring leg remains intact. 7-2-4/5.5 (New) Fiber Rope Mooring Systems To incorporate requirements for surveys afte
48、r construction of fiber rope mooring systems. 7-2-6/3.3 Column Stabilized, Tension Leg Platform and Spar Floating Production Installations To clarify that this section also applies to TLPs and Spars 7-2-6/3.3.2 Examination of Tanks, Compartments and Free-Flooding Spaces To exclude chain lockers from
49、 having to be entered offshore, and to align the requirements with the ABS Rules for Survey After Construction (Part 7). 7-2-6/3.3.8 Hull Thickness Measurement To align the requirements with current practice. 7-2-6/Table 1 (New) Thickness Gauging Requirements for Spars To align the requirements with current practice. 7-2-6/Table 2 (New) Thickness Gauging Requirements for Column-Stabilized Units and Tension Leg Platforms To align the requirements with current practice. 7-2-7/3.3vii) To clarify that the specified internal examinations are applicable f