1、 ABSGUIDE FOR THE ENVIRONMENTAL PROTECTION NOTATION FOR VESSELS .2009 1 GUIDE FOR THE ENVIRONMENTAL PROTECTION NOTATION FOR VESSELS SEPTEMBER 2009 NOTICE NO. 6 August 2014 The following Changes become EFFECTIVE AS OF 1 AUGUST 2014. (See http:/www.eagle.org for the consolidated version of the Guide f
2、or the Environmental Protection Notation for Vessels, 2009, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditio
3、ns of Classification (Part 1).) SECTION 2 DOCUMENTATION 5 Plans and Additional Information (Revise Paragraph 2/5.1, as follows.) 5.1 ENVIRO Notation (1 August 2014) The following plans or information are to be submitted for approval, review or reference, as appropriate: i) Fuel oil storage, settling
4、 and service tanks arrangement, including overfilling prevention arrangement ii) Arrangement for cargo and non-cargo loading and discharge facilities, including connections, spill trays and drainage systems iii) For tank vessels, cargo and ballast tanks arrangement, including piping systems and carg
5、o overfilling prevention iv) Details and diagrams of sewage system, including processing equipment v) List of equipment and arrangements for the handling/stowage of garbage vi) For all vessels, diagrammatic details of ballast system, including details of water treatment, if applicable vii) Details o
6、f hull coating system, including anti-fouling coating specification viii) Details of NOxcontrol and measurement procedures ix) Diagrammatic details of fuel oil system, including details of SOxcontrol x) Diagrammatic details of permanent refrigerant system xi) Details of fire extinguishing media used
7、 in vessels fixed fire fighting systems and extinguishers Notice No. 6 August 2014 2 ABSGUIDE FOR THE ENVIRONMENTAL PROTECTION NOTATION FOR VESSELS .2009 (Revise Paragraph 2/5.3, as follows.) 5.3 ENVIRO+ Notation (1 August 2014) In addition to 2/5.1, the following plans or information are to be subm
8、itted for approval, review or reference, as appropriate: i) Layout and dimensional details of the bridge and its workstations (see A13 of the Guide for Bridge Design and Navigational Equipment/Systems for additional plans and data to be submitted) ii) Cargo vapor emission arrangements; tank gauging
9、systems; cargo transfer rates; hazardous areas (see 5C-1-7/21.3 of the Steel Vessel Rules) iii) Details and diagrams of incinerator to include the feed to the incinerator and the incinerators operating system iv) Inventory of hazardous and potentially hazardous materials as per the ABS Guide for the
10、 Class Notation Green Passport (GP) SECTION 3 ENVIRO NOTATION 3 Management and Support Systems (1 August 2014) (Delete Paragraph 3/3.7, as follows.) 3.7 Recycling Vessels are to hold and maintain the class notation GP (Green Passport). See the ABS Guide for the Class Notation Green Passport (GP). SE
11、CTION 4 ENVIRO+ NOTATION (Revise Subsection 4/3, as follows.) 3 Management and Support Systems (1 August 2014) In addition to the requirements in Subsection 3/3, vessels are to comply with 4/3.1. 3.1 Recycling Vessels are to hold and maintain the class notation GP (Green Passport). See the ABS Guide for the Class Notation Green Passport (GP).
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1