1、 Part 4: Vessel Systems and Machinery RULES FOR BUILDING AND CLASSING STEEL VESSELS 2018 PART 4 VESSEL SYSTEMS AND MACHINERY American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase
2、Drive Houston, TX 77060 USA Rule Change Notice (201 8 ) Rule Change Notice (2018) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in pare
3、ntheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2017 Rules Notice N
4、o. 1 (effective on 1 July 2017) to the 2017 Rules, which is incorporated in the 2018 Rules, is summarized below. EFFECTIVE DATE 1 July 2017 shown as (1 July 2017) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks 4-2-1/13.9.2iv) T
5、o include the alternative of normal continuous cruise power, in line with IACS UR M51 Rev.4, Feb. 2015. (Incorporates Notice No. 1) 4-2-1/Table 1 Required Material and Nondestructive Tests of Diesel Engine Parts To clarify the scope of hydraulic testing for high pressure fuel injection pipes includi
6、ng common fuel rail and high pressure common servo oil systems, in line with IACS UR M72 rev. 1 Mar. 2016. (Incorporates Notice No. 1) 4-2-1/Table 2 Test Pressures for Parts of Internal-combustion Engines To clarify the scope of hydraulic testing for high pressure fuel injection pipes including comm
7、on fuel rail and high pressure common servo oil systems, in line with IACS UR M72 rev. 1 Mar. 2016. (Incorporates Notice No. 1) 4-2-2/1.1 Application To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/1.3.1 Turbocharger To clarify t
8、he categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/1.3.3 (New) Generic Range To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/1.5.1ii) To clarify the categorization of turboc
9、hargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/3.3 Category A and B Turbochargers To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/3.5 Category C Turbochargers To clarify the categorization of turb
10、ochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/3.7.3 Certification Under Quality Assurance Assessment PQA (IACS UR Z26 Alternative Certification Scheme) To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1)
11、 4-2-2/5.1 General To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/5.3 Containment To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/5.7 Type Testing (applicabl
12、e to category B and C turbochargers) To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/7 Piping Systems for Turbochargers To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No.
13、 1) ii ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2018 Part/Para. No. Title/Subject Status/Remarks 4-2-2/8 (New) Alarms and Monitoring To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/11.1 Shop Inspection and Tests To clari
14、fy the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/11.1.1 Material Tests To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/11.1.5 Shop Trial To clarify the categorization
15、of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-2-2/11.3 Certification of Turbochargers To clarify the categorization of turbochargers and the application of Type Approval. (Incorporates Notice No. 1) 4-3-4/13.1.9 (New) System Response Under Failure To detect fai
16、lure in the steering gear control system and provide the operator with sufficient information to decide what action is required for the different failure scenarios, in line with IACS UR E25 June 2016. (Incorporates Notice No. 1) 4-3-4/Table 1 Steering Gear Instrumentation To detect failure in the st
17、eering gear control system and provide the operator with sufficient information to decide what action is required for the different failure scenarios and to require a deviation alarm in addition to basic failure detection, in line with IACS UR E25 June 2016. (Incorporates Notice No. 1) 4-3-5/1.1 App
18、lication To clarify the various terms used for steering systems and their associated equipment, in line with IACS UI SC242 Rev.1, Apr. 2016. (Incorporates Notice No. 1) 4-3-5/1.5.6 (New) Steering System To clarify the various terms used for steering systems and their associated equipment, in line wi
19、th IACS UI SC242 Rev.1, Apr. 2016. (Incorporates Notice No. 1) 4-3-5/5.12.2(b)iii) To clarify that the capacity requirements apply regardless whether he steering systems are arranged with common or dedicated power units that the requirements of 4-3-4/11.1 apply to each steering system in ships fitte
20、d with multiple steering systems, in line with IACS UI SC242 Rev.1, Apr. 2016. (Incorporates Notice No. 1) 4-3-5/5.12.4 (New) Electric and Electrohydraulic Steering Systems To clarify that the capacity requirements apply regardless whether he steering systems are arranged with common or dedicated po
21、wer units that the requirements of 4-3-4/11.1 apply to each steering system in ships fitted with multiple steering systems, in line with IACS UI SC242 Rev.1, Apr. 2016. (Incorporates Notice No. 1) 4-3-5/7.5 (New) Failure Detection and Response To detect failure in the steering gear control system an
22、d provide the operator with sufficient information to decide what action is required for the different failure scenarios, in line with IACS UR E25 June 2016. (Incorporates Notice No. 1) 4-3-7/15.11 Instrumentation To detect failure in the steering gear control system and provide the operator with su
23、fficient information to decide what action is required for the different failure scenarios, in line with IACS UR E25 June 2016. (Incorporates Notice No. 1) 4-6-2/5.7.3(c) Fire Resistance To clarify the cases in which flexible hoses need not be of fire-resistant type. (Incorporates Notice No. 1) 4-6-
24、2/5.9.1(c) (Deleted) Operational Conditions To minimize the use of slip-on joints for pipe connection except for cases where compensation of axial pipe deformation is necessary and to clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.1(e) Fire
25、Testing To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.1(f) Locations To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.1(h) (Deleted) Application To clarify the requirements, in
26、line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2018 iii Part/Para. No. Title/Subject Status/Remarks 4-6-2/5.9.1(g) Joints To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9
27、.1(i) Slip-on Joints To minimize the use of slip-on joints for pipe connection except for cases where compensation of axial pipe deformation is necessary and to clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.1(j) Application To clarify the r
28、equirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.2(e)ii) Selection of Test Specimen To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.2(e)v) 1(a) To clarify the requirements, in line with IACS UR P
29、2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.2(e)v)2 Vibration (Fatigue) Test To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.2(e)v)4 Burst Pressure Test To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (
30、Incorporates Notice No. 1) 4-6-2/5.9.2(e)v)5 Pull-out Test To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/5.9.2(e)v)6 Fire Endurance Test To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2
31、/5.9.2(e)v)7 Vacuum Test To clarify the requirements, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-6-2/Table 9 Examples of Mechanical Joints To update the figures for “Machine Grooved Type” and “Slip Type” slip-on joints, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorpor
32、ates Notice No. 1) 4-6-2/Table 10 Application of Mechanical Joints To clarify the restrictions for on slip-on joints and flexible hoses used for L.O. lines and other flammable oils, and installed on open decks, in line with IACS UR P2 Rev.2, Mar. 2016. (Incorporates Notice No. 1) 4-8-2/7.21 Harmonic
33、s To specify that the harmonic distortion calculation report is to be kept on board for exceptions to the 8% limit in cases where all installed equipment and systems have been designed for higher THD levels, in line with IACS UR E24 June 2016. (Incorporates Notice No. 1) 4-8-2/9.22 (New) Harmonic Di
34、stortion for Ship Electrical Distribution System including Harmonic Filters To introduce requirements for survey of harmonic filters and harmonic distortion levels, in line with IACS UR E24 June 2016. (Incorporates Notice No. 1) 4-8-2/9.23 Protection of Harmonic Filter Circuits Associated with Elect
35、ric Propulsion To introduce requirements for survey of harmonic filters and harmonic distortion levels, in line with IACS UR E24 June 2016. (Incorporates Notice No. 1) 4-8-3/9.1 Standard of Compliance To identify the standards that have been withdrawn or replaced by new ones and to consider approach
36、es for cables not manufactured to IEC standards identified, in line with IACS UR E7 Rev.4 Apr. 2016. (Incorporates Notice No. 1) 4-9-6/Table 1A Instrumentation and Safety System Functions in Centralized Control Station Slow Speed (Crosshead) Diesel Engines To require turbocharger speed alarm for Cat
37、egories B and C turbochargers, in line with IACS UR M35 rev. 7 Mar. 2016. (Incorporates Notice No. 1) 4-9-6/Table 1B Instrumentation and Safety System Functions in Centralized Control Station Medium and High Speed (Trunk Piston) Diesel Engines To require turbocharger speed alarm for Categories B and
38、 C turbochargers, in line with IACS UR M35 rev. 7 Mar. 2016. (Incorporates Notice No. 1) 4-9-6/Table 4B Instrumentation and Safety System Functions in Centralized Control Station Generator Prime Mover for Electric Propulsion To require turbocharger speed alarm for Categories B and C turbochargers, i
39、n line with IACS UR M35 rev. 7 Mar. 2016. (Incorporates Notice No. 1) iv ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS .2018 Part/Para. No. Title/Subject Status/Remarks 4-9-6/Table 6 Instrumentation and Safety System Functions in Centralized Control Station Auxiliary Turbines and Diesel Engines T
40、o require turbocharger speed alarm for Categories B and C turbochargers, in line with IACS UR M35 rev. 7 Mar. 2016. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2018 shown as (2018) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Statu
41、s/Remarks 4-3-1/5.13 Alternative Gear Rating Standards To refer to the latest edition of the standards. 4-3-2/7.3.2(a)v) Geared Systems To clarify how the misalignment is to be verified and to require that verification and adjustment procedure be reviewed if the calculated misalignment is not submit
42、ted. 4-3-2/7.3.2(b) Hull Deflections Accounted for in the Analysis To clarify that the fully laden draft of a vessel is not with the aft peak tank full. 4-3-2/11.1.2(e)iv) To clarify the draft of a vessel for shaft alignment analysis is accounted for in the hull deflection. 4-3-2/11.1.2(f) (New) Gea
43、red Systems To clarify how the misalignment is to be verified and to require that verification and adjustment procedure be reviewed if the calculated misalignment is not submitted. 4-3-4/1.11 Plans and Particulars to be Submitted To clarify the requirements for automatic isolating systems. 4-3-4/25.
44、1.2ii) To clarify the requirements for automatic isolating systems. 4-4-1/1.1 Application To clarify the requirements for accumulators of extruded seamless construction. 4-4-1/17.3.2 Diameter Over 457 mm (18 in.) To clarify that the diameter is the inside diameter. 4-4-1/17.3.3 Diameter Over 305 mm
45、(12 in.) To clarify that the diameter is the inside diameter. 4-4-1/17.3.4 Diameter 305 mm (12 in.) or Less To clarify that the diameter is the inside diameter. 4-6-4/5.7.4(c) Sludge Piping To align the requirement with Regulation 12 of MARPOL Annex 1, as amended by Resolution MEPC. 266(68). 4-6-4/9
46、.5.5 Fuel Oil Tank Overflows To align the requirements with ABS practice. 4-6-4/13.1.1 Application To clarify the requirements for fuel tanks used for separating machinery spaces from cargo and slop tanks, in line with IACS UR M76, Apr. 2016. 4-6-4/17.5 Class Notation POT To clarify that the protect
47、ion requirements for lubrication oil tanks as required in 4-6-4/17.5 is not applicable to lubrication oil tanks with a capacity not greater than 30 m3. 4-6-5/15 (New) Storage and Use of SCR Reductants To provide requirements for Selective Catalytic Reduction (SCR) systems, in line with IACS UR M77 S
48、ept. 2016. 4-6-7/3.5.4 Hydraulic Accumulators To clarify the requirements for accumulators of extruded seamless construction. 4-6-7/7.3.2 Ventilation of Storage Room To clarify that the requirements are applied to acetylene gas (as flammable gas) only. 4-6-7/7.3.3 Electrical Installation in Storage
49、Room To clarify that the requirements are applied to acetylene gas (as flammable gas) only. 4-6-7/7.5.4 Gas Cylinders To clarify that the requirements are applied to acetylene gas (as flammable gas) only. 4-7-2/1.9.4(a) Escapes To clarify the requirements for internal dimensions and ladders, in line with IMO MSC.Circ1511 and IACS UI SC277. 4-7-2/1.13.1iii) (New) Emergency Generator Spaces To align the requirements with ABS practice. 4-7-3/3.1.2 Distribution Piping and Nozzles To clarify the requirements for the pressure rating of the distribution pipe. 4-7-3/3.1.5 Medium Relea
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1