1、337-q MIL-B-50502(MU) 14 April 1971 MILITARY SPECIFICATION BOMB, INERT BLU-S(D-l)/B LOADING, ASSEMBLING, AND PACKING I 1, SCOPE 1.1 This specification covers the loading, assembling and packing for one type of bomb, designated as Bomb, Inert BLU-J(D-l)/B. 2. APPLICABLE DOCUMENTS 2.1 The following do
2、cuments of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATION MIL I TARY MIL-A-2550 MIL- I - 4 5 6 07 STANDARDS FEDERAL FED-STD-151 MILITARY MIL-STD-105 MIL-STD-109 - Ammunition and Special Weapo
3、ns, - Inspection Equipment, Supply and General Specification for Maintenance of - Metals; Test Methods - - Quality Assurance Terms and Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) Definit ions FSC: 1325 Provided by IHSNot for ResaleNo reproduction or networking permitted
4、 without license from IHS-,-,-MIL-B-50502 $MU) MIL- STD-1168t MIL-CTD-1169 MIL-STD-1235 Y I equipment dzigns by showing in the “Part Number“ column st of inspection equipment (Form SMUPA-1010). the numbers of drawings 1 Stock numbers of existing equipment designs, or codes as indicated raph 6.3.2. D
5、esign action required of the contractor is described in paragraphs 6.3.3 and 6.3.4. The contractor will be required to prepare detailed drawings in accordance with 6.3.4, for all the equipmeqt coded as “Contractor Design“ in the “Part Number“ column. These contractor designs must be approved by the
6、Government prior to fabrication or prscuring of the Designs shall be submitted for approval as specified in 6.3.5, . 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-50502 (MU) 6.3.2 Equipment list codes.- The inspection equipment as defined i
7、n 6.3.3 and 6.3.4 will be designated in the EL by the following codes: CD - Contractor design on controlled contractor format MU - Army design, mandatory for use. and/or commercial equipment. 6.3.3 Army design.- Army designs are reflected on detailed drawings which completely depict all the informat
8、ion necessary for the fabrication of the item of inspection equipment. when an Army design is listed for an item of inspection equipment. designs fail into two basic classifications: and non-mandatory (indicated by drawing or Federal Stock Number). equipment list references mandatory Army designs, t
9、he contractor shall comply with, and use, these designs accordingly. connection with non-mandatory designs, and with the approval of the Govern- ment, design alternate inspection equipment to facilitate his operations. Such contractor-prepared designs (see 6.3.4) or commercial equipment selections m
10、ust be approved by the Government prior to fabrication or procuring of the equipment. The contractor need provide no design Army When an The contractor may, however, in Mandatory (designated llMU1l) Designs shall be submitted for approval as specified in 6.3.5. 6.3.4 Contractor designs.- Contractor
11、designs are designs of inspection equipment for which the Government has assigned design responsibility to the contractor. depict all information necessary to completely fabricate, calibrate and operate an item of inspection equipment. views, dimensions, materials, finishes, notes and operating and
12、calibration or clarification will not be required. designs may be developed on the format the contractor normally employs in his equipment design procedure provided such format reflects the detail and information specified above, subject to the following controls : contractor designs shall conform t
13、o Specification MIL-D-1000, Category E, Form 2. clearly understandable, high-contrast reproductions. three copies of final designs as a flat set. approval as specified in 6.3.5. tain a reference to the applicable 5-digit code number contained in Section 4 of this Specification and the appropriate co
14、mponent or assembly drawing number and revision letter to which the specific design applies. specified in the EL, all designs of equipment for inspection of defects classified as Critical and Major shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, Attn: SMUPA-QA-A-S. All
15、other designs of inspection equipment contract. Submission shall be as directed to the Contracting Officer. submission of inspection equipment designs is permissible and encouraged. the Arsenal completion date for design review will be based on the date of the final submission of designs. normally,
16、within one month after receipt. Contractor designs shall be supported by detailed drawings which This requires that the necessary Unless otherwise specified, contractor All submitted Legibility and reproducibility shall permit conventional making of Contractors shall submit Designs shall be submitte
17、d for 6.3.5 Submission of contractor design.- All submitted designs shall con- Unless otherwise * shall #e approved by the inspection element of the -agency administering tli-e , Partial Howev&l - Picatinny Arsenal design review will be accomplished 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Custodian: u. s. GOVERNMENT PRINTING OFFICE: 1972 -714- 165844 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1