1、Designation: D2661 14 An American National StandardStandard Specification forAcrylonitrile-Butadiene-Styrene (ABS) Schedule 40 PlasticDrain, Waste, and Vent Pipe and Fittings1This standard is issued under the fixed designation D2661; the number immediately following the designation indicates the yea
2、r oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the U.S. Dep
3、artment of Defense.1. Scope*1.1 This specification covers fittings and single and coex-truded acrylonitrile-butadiene-styrene (ABS) plastic drain,waste, and vent pipe (DWV) made to Schedule 40 iron pipesizes (IPS). Plastic which does not meet the material require-ments specified in Section 5 is excl
4、uded from single layer andall coextruded layers.1.2 Specification for fittings for use with pipe meeting therequirements of this specification are given in Annex A1.1.3 Acrylonitrile-butadiene-styrene plastic, which does notmeet the definition of virgin ABS plastic as given in 3.2.2,isexcluded, as p
5、erformance of plastic other than those defined asvirgin was not determined. ABS rework plastic, which meetsthe requirements of rework plastic as given in 5.3, is accept-able.1.4 Reprocessed plastic or recycled plastic as defined inTerminology D883 is excluded.1.5 Recommendations for storage, joining
6、, and installationare provided in Appendix X1, Appendix X2, and AppendixX3, respectively.1.6 The text of this specification references notes, footnotes,and appendixes which provide explanatory material. Thesenotes and footnotes (excluding those in tables and figures) shallnot be considered as requir
7、ements of the specification.1.7 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.2. Referenced Documents2.1 ASTM Standards:2D618 Practice
8、for Conditioning Plastics for TestingD883 Terminology Relating to PlasticsD1600 Terminology forAbbreviated Terms Relating to Plas-ticsD1898 Practice for Sampling of Plastics (Withdrawn 1998)3D2122 Test Method for Determining Dimensions of Ther-moplastic Pipe and FittingsD2235 Specification for Solve
9、nt Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and FittingsD2321 Practice for Underground Installation of Thermoplas-tic Pipe for Sewers and Other Gravity-Flow ApplicationsD2412 Test Method for Determination of External LoadingCharacteristics of Plastic Pipe by Parallel-Plate Loadi
10、ngD2444 Test Method for Determination of the Impact Resis-tance of Thermoplastic Pipe and Fittings by Means of aTup (Falling Weight)D3311 Specification for Drain, Waste, and Vent (DWV)Plastic Fittings PatternsD3965 Classification System and Basis for Specifications forRigid Acrylonitrile-Butadiene-S
11、tyrene (ABS) Materialsfor Pipe and FittingsE105 Practice for Probability Sampling of MaterialsE122 Practice for Calculating Sample Size to Estimate, WithSpecified Precision, the Average for a Characteristic of aLot or ProcessF402 Practice for Safe Handling of Solvent Cements,Primers, and Cleaners Us
12、ed for Joining ThermoplasticPipe and FittingsF412 Terminology Relating to Plastic Piping Systems1This specification is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.63 on DWV.Current edition approved Dec. 1, 2014. Published
13、 January 2015. Originallyapproved in 1967. Last previous edition approved in 2011 as D2661 11. DOI:10.1520/D2661-14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to
14、the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenced onwww.astm.org.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-29
15、59. United States1F1498 Specification for Taper Pipe Threads 60 for Thermo-plastic Pipe and FittingsF2135 Specification for Molded Drain, Waste, and Vent(DWV) Short-Pattern Plastic Fittings2.2 Federal Standard:Fed. Std. No. 123 Marking for Shipment (Civil Agencies)42.3 Military Standard:MIL-STD-129
16、Marking for Shipment and Storage43. Terminology3.1 Definitions:3.1.1 Definitions are in accordance with Terminology F412,and abbreviations are in accordance with Terminology D1600,unless otherwise specified. The abbreviation for acrylonitrile-butadiene-styrene is ABS.3.1.2 coextruded pipepipe consis
17、ting of two or moreconcentric layers of material bonded together in processing byany combination of temperature, pressure, grafting,crosslinking, or adhesion.3.1.3 coextrusiona process whereby two or more heatedor unheated plastic material streams forced through one ormore shaping orifice(s) become
18、one continuously formedpiece.3.1.4 room temperaturea temperature in the range from 68to 85 6 3.6F (20 to 30 6 2C).3.2 Definitions of Terms Specific to This Standard:3.2.1 lota lot shall consist of all pipe of the same sizeproduced from one extrusion line during one designated 24-hperiod.3.2.2 recycl
19、ed plastica plastic prepared from discardedarticles that have been cleaned and reground.3.2.3 reprocessed plastica thermoplastic usually preparedfrom melt processed scrap or reject parts by a plasticsprocessor, or from nonstandard or nonuniform virgin material.3.2.4 virgin ABS plasticplastic in the
20、form of pellets,granules, powder, floc, or liquid that has not been subjected touse or processing other than that required for its initialmanufacture.4. Classification4.1 The requirements of this specification are intended toprovide pipe suitable for the drainage and venting of sewageand certain oth
21、er liquid wastes.NOTE 1Industrial waste disposal lines should be installed only withthe specific approval of the cognizant building code authority sincechemicals not commonly found in drains and sewers and temperatures inexcess of 180F (82C) may be encountered.NOTE 2This specification does not inclu
22、de requirements for pipe andfittings intended to be used to vent combustion gases.5. Materials5.1 Material SpecificationVirgin black ABS plastic shallconform to the requirements prescribed in Specification D3965with a cell classification of 4-2-2-2-2. The form of the materialshall be as agreed upon
23、between the seller and the purchaser inaccordance with Specification D3965.5.2 The ABS plastic shall conform to the following require-ments:5.2.1 Acrylonitrile-Butadiene-Styrene (ABS) PlasticPlastic containing polymers or blends of polymers shall containa minimum of 15 % acrylonitrile, 6 % butadiene
24、, and 15 %styrene or substituted styrene, or both. ABS plastic shallcontain no more than 10 % of other monomeric or polymericcomponents plus other necessary compounding ingredients.5.3 Rework MaterialThe manufacturer shall use only hisown clean pipe or fitting rework material conforming withthese ce
25、ll class requirements. The pipe or fittings producedshall meet all the requirements of this specification.6. Requirements6.1 GeneralThe pipe and fittings shall be homogeneousthroughout and free of visible cracks, holes, foreign inclusions,or other injurious defects. The pipe shall be as uniform asco
26、mmercially practicable in color, opacity, density, and otherphysical properties.6.1.1 The requirements in this section are intended only foruse as quality control tests, not as simulated service tests.6.2 Dimensions and Tolerances:6.2.1 Outside DiameterThe outside diameter and toler-ances shall meet
27、 the requirements of Table 1 when measured inaccordance with Test Method D2122. The tolerance for out-of-roundness shall apply to pipe prior to shipment.4Available from Standardization Documents Order Desk, DODSSP, Bldg. 4,Section D, 700 Robbins Ave., Philadelphia, PA 19111-5098, http:/www.dodssp.da
28、ps.mil.TABLE 1 Outside Diameters and Tolerances for ABS Schedule 40 Plastic Drain, Waste, and Vent PipeNominal Pipe Size, in.Outside DiameterAverage, in. (mm) Tolerance on Average, in. (mm)Out-of-Roundness MaximumDiameter Minus MinimumDiameter, in. (mm)A114 1.660 (42.16) +0.010, 0.000 (+0.25, 0.00)
29、0.024 (0.60)112 1.900 (48.26) +0.010, 0.000 (+0.25, 0.00) 0.024 (0.60)2 2.375 (60.32) +0.010, 0.000 (+0.25, 0.00) 0.024 (0.60)3 3.500 (88.90) +0.015, 0.000 (+0.38, 0.00) 0.030 (0.76)4 4.500 (114.30) +0.015, 0.000 (+0.38, 0.00) 0.030 (0.76)6 6.625 (168.28) +0.011, 0.011 (+0.28, 0.28) 0.050 (1.27)AMea
30、sured at time of manufacturing.D2661 1426.2.2 Wall ThicknessThe wall thickness and tolerancesshall meet the requirements of Table 2 when measured inaccordance with Test Method D2122.6.2.3 LengthThe pipe shall be in either 10 or 20-ft (3.05 or6.1-m) lengths, unless otherwise specified. The allowablet
31、olerance on length shall be +12, 0 in. (+12, 0 mm).6.3 Performance Requirements:6.3.1 Pipe Stiffness The minimum pipe stiffness values at5 % deflection when measured in accordance with Test MethodD2412, shall equal or exceed the values in Table 3. The rate ofcrosshead motion shall be 0.20 to 0.25 in
32、./min (5.1 to 6.3mm/min). Three specimens shall be tested. If all three meet thisrequirement, the sample meets this requirement. If one or twofail, additional testing shall be conducted in accordance with6.3.1.1. If all three fail, the sample does not meet therequirement.6.3.1.1 Pipe Stiffness and L
33、ower Confidence LimitIn theevent that one or two of the specimens tested in 6.3.1 fail tomeet the minimum requirement, the average pipe stiffness ofeleven specimens shall meet or exceed the minimum require-ment given in Table 3. The 99 % lower confidence limit (LCL)shall be within 15 % of the averag
34、e value. The LCL shall becalculated using the Students “ t” distribution, with N-1degrees of freedom, where N is the number of specimens. Thecritical t value shall be used to at least three significant digits.Alternatively, if the LCLexceeds the minimum PS requirementin Table 3, but is not within 15
35、 % of the average, the samplemeets the requirements of the Pipe Stiffness testing. The elevenspecimens include the three tested under 6.3.1, and an addi-tional eight with rotation by 35, as specified in Test MethodD2412, continuing throughout the remaining specimens.6.3.1.2 The LCL based on testing
36、eleven specimens iscalculated as follows:LCL 5 avg PS! 2 $2.76std. dev.!/=N!% (1)where:avg PS! 5 (PSi!#/11!std. dev.! 5 F(PS22 (PS!2/NN 2 1G1/2N=11.6.3.1.3 The 15 % requirement is calculated as follows:Avg 2 LCL!/Avg! 3100#15% (2)NOTE 3For quality control testing, a single specimen may be usedwith t
37、he thinnest wall at the top.NOTE 4The 5 % deflection criteria is arbitrarily selected for testingconvenience. It should not be considered as a limitation with respect toin-use deflection. The engineer is responsible for establishing the accept-able deflection limit.NOTE 5The strength and load-carryi
38、ng capabilities of plastic pipe aremeasured and reported as pipe stiffness, which is determined in accor-dance with Test Method D2412. The term “crush strength” is notapplicable to plastic piping because the values obtained can be signifi-cantly different, depending on the bedding, loading, or testi
39、ng techniqueused, and because the term derives from rigid pipe and refers to itsultimate strength at rupture.6.3.2 Pipe FlatteningThere shall be no evidence of rup-ture when pipe is deflected 40% of the initial inside diameterwhen tested in accordance with Test Method D2412. The rateof head approach
40、 shall be 0.20 to 0.25 in./min (5.1 to 6.3mm/min). Three specimens shall be tested. All shall meet therequirements. Failure shall be a crack or break extendingentirely through the pipe wall visible to the unaided eye.6.3.3 Impact ResistanceThe minimum impact resistance,when tested at the time of man
41、ufacture, shall comply withTable 4. Test in accordance with Test Method D2444 using TupB and Holder B. Use a 30-lb (13.6 kg) tup for testing all pipesizes.6.3.3.1 Test 10 specimens. When 9 or 10 specimens pass,accept the lot. When 2 or more specimens fail, test 10additional specimens. When 17 of 20
42、specimens tested pass,accept the lot. When 4 or more of 20 specimens fail, test 20additional specimens. When 32 of 40 specimens pass, acceptthe lot. When 9 or more of 40 specimens fail, the lot does notmeet the requirements of this specification.TABLE 2 Wall Thickness and Tolerance for ABS Schedule
43、40Drain, Waste, and Vent PipeNominal PipeSize, in.Wall ThicknessAMinimum Wall,in. (mm)Tolerance,in. (mm)114 0.140 (3.56) +0.015 (+0.38)0.000 (0.00)112 0.145 (3.68) +0.015 (+0.38)0.000 (0.00)2 0.154 (3.91) +0.015 (+0.38)0.000 (0.00)3 0.216 (5.42) +0.020 (+0.51)0.000 (0.00)4 0.237 (6.02) +0.024 (+0.61
44、)0.000 (0.00)6 0.280 (7.11) +0.030 (+0.76)0.000 (0.00)AThe minimum is the lowest wall thickness of the pipe at any cross section.TABLE 3 Pipe Stiffness of ABS Schedule 40 Plastic Drain, Waste,and Vent PipeNominal PipeSize, in.Minimum PipeStiffness at 5 %Deflectionpsi (MPa)114 870 (6.00)112 630 (4.34
45、)2 370 (2.55)3 320 (2.20)4 190 (1.31)6 95 (0.65)TABLE 4 Impact Resistance of ABS Schedule 40 Plastic Drain,Waste, and Vent PipeNominal Pipe Size, in.Minimum Impact Resistance, ftlbf (J)At 73F (23C)114 20 (27)112 30 (41)2 40 (54)3 60 (81)4 60 (81)6 100 (136)D2661 1436.3.3.2 Failure of the test specim
46、en shall be shattering orany crack or break extending entirely through the pipe wall andvisible to the unaided eye.6.4 Coextruded Pipe:6.4.1 Thickness of Outer LayerFor pipe produced by thecoextrusion process, that is, pipe containing two or moreconcentric layers, the outer layer shall be at least 0
47、.020 in.(0.50 mm) thick and shall contain pigments or screening agentsto provide protection against UV radiation.6.4.2 BondFor pipe produced by the coextrusion process,that is, pipe containing two or more concentric layers, the bondbetween the layers shall be strong and uniform. It shall not bepossi
48、ble to separate any two layers with a probe or point of aknife blade so that the layers separate cleanly so the probe orknife blade moves freely between the layers. Nor shall sepa-ration of bond occur between layers during testing performedunder the requirements of this specification.6.5 Other Requi
49、rements:6.5.1 InspectionBefore installation the pipe shall be in-spected. Pipe which does not meet the requirements of thisspecification shall be returned to the seller.6.5.2 JoiningABS schedule 40 drain, waste, and vent(DWV) are joined using molded fittings meeting the require-ments of Annex A1 of this specification.6.5.3 Solvent CementIn the assembly of solvent cementjoints, the safety requirements of Practice F402 shall befollowed using solvent cement meeting the requirements ofSpecification D2