1、Designation: F1808 03 (Reapproved 2013) An American National StandardStandard Guide forWeight Control Technical Requirements for Surface Ships1This standard is issued under the fixed designation F1808; the number immediately following the designation indicates the year oforiginal adoption or, in the
2、 case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the U.S. Department of Defense.1. Scope1.1 T
3、his guide provides recommended weight control tech-nical requirements for surface ships and discusses differenttypes of weight estimates, reports, and weight control proce-dures. It contains a weight classification that will assist inachieving uniformity by standardizing the weight-reportingsystem.1
4、.2 This guide is applicable to ships designed and con-structed in inch-pound units of measurement and to shipsdesigned and constructed in SI units of measurement. When-ever inch-pound units are shown or referred to in the text, or inexample formats included in this guide, it is to be understoodthat
5、corresponding SI units may be substituted if applicable toa ship designed and constructed in SI units, provided thatwhichever system is used, it is consistently used in all weightcontrol reporting documentation for the ship.2. Referenced Documents2.1 ASTM Standards:2F1321 Guide for Conducting a Stab
6、ility Test (LightweightSurvey and Inclining Experiment) to Determine the LightShip Displacement and Centers of Gravity of a VesselF1332 Practice for Use of SI (Metric) Units in MaritimeApplications (Committee F25 Supplement to IEEE/ASTM SI 10)3. Terminology3.1 Definitions:3.1.1 agreed weight and cen
7、ter of gravity estimate, nanestimate of light ship weight and centers of gravity data,mutually agreed upon between the owner and the shipbuildershortly after award of the shipbuilding contract, based on theship design information, for example, specifications, drawings,and so forth, available at the
8、time of award.3.1.2 as-built weight and center of gravity estimate, nadetailed final estimate of light ship weight and centers ofgravity data, adjusted for inclining experiment results, reflect-ing the as-built ship including the net effect of contractmodifications.3.1.3 center of gravity, nthe poin
9、t through which theresultant of all gravitational forces on a ship or a componentpasses. The location, a balance point, at which the entire weightof a ship may be considered to be concentrated.3.1.4 deadweight, nthe total carrying capacity of a shipincluding weight of cargo, fuel, lubricating oil, f
10、resh water intanks, stores, passengers and baggage, and crew and theireffects.3.1.5 inclining experiment, na procedure performed on acompleted, or almost completed, ship to establish experimen-tally the light ship values of the displacement and the vertical,longitudinal, and transverse positions of
11、its center of gravity(see Guide F1321 for detailed procedures).3.1.6 independent weight and center of gravity estimate,nthe estimate of light ship weight and centers of gravityperformed by the shipbuilder shortly after award of theshipbuilding contract based on the ship design informationavailable a
12、t the time of award. When compared with theowners estimate and upon resolution of differences, an agreedupon weight and center of gravity estimate will result.3.1.7 light ship weight, nthe weight of the ship with all itsequipment and outfit, including permanent (fixed) solid orliquid ballast, spare
13、parts that are carried on board, water inboilers at operating levels, machinery including Marine Sani-tation Device units in working condition, lubricating oil in allmachinery, but not in storage tanks, and liquids in all pipingsystems.3.1.8 longitudinal center of gravity (LCG), nthe pointthrough wh
14、ich the gravitational forces on a ship pass, measuredlongitudinally from amidships, measured from the forwardperpendicular, or in some cases, measured from the aft perpen-dicular.1This guide is under the jurisdiction of ASTM Committee F25 on Ships andMarine Technology and is the direct responsibilit
15、y of Subcommittee F25.07 onGeneral Requirements.Current edition approved Oct. 1, 2013. Published October 2013. Originallyapproved in 1997. Last previous edition approved in 2008 as F1808 03 (2008).DOI: 10.1520/F1808-03R13.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontac
16、t ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.9 transverse center o
17、f gravity (TCG), n the pointthrough which the gravitational forces on a ship pass, measuredtransversely, port or starboard, from the ships centerline.3.1.10 vertical center of gravity (KG or VCG), nthe pointthrough which the gravitational forces on a ship pass measuredvertically from the keel (K) or
18、 the ships baseline.3.1.11 weigh; to weigh, vas commonly understood ineveryday usage and in the maritime industry, and as usedthroughout this guide, means to determine by measuring themass of.3.1.12 weight, nas commonly understood in everydayusage and in the maritime industry, and as used throughout
19、 thisguide, is synonymous with mass. In this guide, weight ininch-pound units is measured in pounds and in long tons of2240 lbs; and in SI units (metric), weight is measured inkilograms and in metric tons of 100 kg. Refer to PracticeF1332 for conversion factors to convert inch-pound quantitiesto SI
20、(metric) quantities for units of weight, moment, momentsto trim, and so forth.3.1.13 weight classification, nthe system used in light shipweight estimating for grouping materials, equipment, or com-ponents of the ship in a structured order to facilitate compari-son and to ensure completeness.3.1.14
21、weight group, none of the three major elements oflight ship weight as used in the weight classification, that is,hull structure, outfit, and machinery.4. Summary of Guide4.1 Determination of Weight and Moment DataTheweight and moment data for all components and material andtheir overall effect on th
22、e ships weight, center of gravity, list,and trim should be determined. As ship design or shipconstruction drawings are prepared and as material is selected,acquired, or received, the weight and centers of gravity of allitems that comprise the ship should be determined and reportedin the weight estim
23、ates and reports. These data may beobtained by estimation or calculation during preliminary andcontract design, by a combination of estimation or calculationof ship construction drawings, and by actual weight determi-nation of items during detail design and construction.4.2 Weight Reporting and Cont
24、rolThe procedures forweight reporting and control, regardless of the level ofreporting, are described in Section 6 and apply for commercialships. The method and frequency of weight reporting can varydepending on the specific ship design, as well as the technicalrequirements set forth in the contract
25、. The extent and level ofweight control also can vary depending on the specific shipdesign. Although the weight control technical requirements forcommercial ships usually are less demanding than those forU.S. Navy surface ships, the need for a mechanism to controlthe weight of a ship still exists. S
26、ections S1 S4 describe thespecific weight control technical requirements for U.S. Navysurface ships.5. Significance and Use5.1 It is important to know the amount of weight and itslocation before the ship is built to be sure that when it is builtit will have positive stability. Only through detailed
27、weightestimating in the design stage and during construction can onebe ensured that positive stability will be achieved and retained.6. Procedure6.1 A specified number of calendar days, that is, 30, 45, 60,or 90 after date of award, as specified by the owner, theshipbuilder should submit for agreeme
28、nt an independentweight and center of gravity estimate. This estimate shoulddescribe the weight and centers of gravity of the ship incomprehensive detail and should include summaries and worksheets showing the detailed work performed, for example,calculations and estimates based on the design inform
29、ation,drawings, specification, and so forth. Appendix X1 containssuggested forms for the independent estimate, and it includes asuggested weight classification system for the estimate. Termsused in the weight classification are defined in the MaritimeAdministration Publication, Classification of Mer
30、chant ShipWeights.36.2 A mutual agreement between the shipbuilder and theowner on the light ship weight and centers of gravity should bereached as quickly as possible after award of the shipbuildingcontract. Agreement action should consist of a review ofshipbuilders independent weight and center of
31、gravity esti-mates and comparison with the owners estimate. Upon reso-lution of differences, an agreed upon weight and center ofgravity estimate will result. Thereafter, the shipbuilder shouldbe responsible for obtaining in the completed vessel the agreedupon weight and center of gravity characteris
32、tics adjusted forauthorized departures from the contracted ship design, re-flected in the agreed upon estimate.6.3 Departures from the contracted ship design, reflected inthe agreed upon estimate, which affect the light ship weightand centers of gravity, should not be undertaken until theshipbuilder
33、 has submitted to the owner his estimate of theeffect on weight and centers of gravity of the ship and obtainedwritten approval to proceed with the department. Departures,which have a total impact on any weight group of less than aspecified percentage, that is, 0.01, 0.02, 0.03, or 0.04 % of theligh
34、t ship weight, may be considered negligible and will notrequire written approval with respect to weight.6.4 The shipbuilder should submit periodically, as agreedupon, to the owner, a tabulation of approved departures andtheir cumulative effect on weight and centers of gravity of theagreed light ship
35、 estimate. In addition, when submitting plansthat involve departures from the type of construction in thecontracted ship design, reflected in the estimate, the shipbuildershould itemize such departures and their effect on light shipweight and centers of gravity in his periodic reports. A finalreport
36、 should be submitted at the time of delivery adjusted tobring the estimated light ship weight and centers of gravity intoreasonable agreement with the inclining experiment results.3U.S. Department of Transportation, Maritime Administration Classification ofMerchant Ship Weights, January 1985. Availa
37、ble from the U.S. MaritimeAdministration, Office of Ship Construction, MAR 720, 400 Seventh St., SW,Washington, DC 20590.F1808 03 (2013)27. Keywords7.1 light ship; ship acquisition; weight control; weightestimate; weight reportSUPPLEMENTARY REQUIREMENTSThe following supplementary requirements shall
38、apply only when specified by the purchaser in thecontract or purchase order. These requirements normally are invoked for U.S. Navy Surface Ships.S1. SPECIAL GOVERNMENT REQUIREMENTSS1.1 Government Documents, Drawings, andPublicationsThe following government documents,drawings, and publications form a
39、 part of this guide to theextent specified herein. Unless otherwise specified, the issuesare those cited in the solicitation.S1.1.1 Naval Sea Systems Command (NAVSEA) Docu-ments:0900-LP-039-9020 Ship Work Breakdown Structure forNuclear Propulsion Plant (U)4S9040-AA-IDX-010/SWBS 5D, Expanded Ship Wor
40、kBreakdown Structure, Vol I5S9040-AA-IDX-020/SWBS 5D, Expanded Ship WorkBreakdown Structure, Vol II5S1.2 Nongovernment PublicationsThe following docu-ment(s) form a part of this guide to the extent specified herein.Unless otherwise specified, the issues of the documents, whichare DOD adopted, are th
41、ose listed in the issue of the Depart-ment of Defense Index of Specifications and Standards(DODISS) cited in the solicitation. Unless otherwise specified,the issues of documents not listed in the DODISS are the issuesof the documents cited in the solicitation (see S4.1).S1.2.1 ANSI Document:6X3.4 Co
42、de for Information InterchangeNOTE S1Nongovernment standards and other publications normallyare available from the organizations that prepare or distribute thedocuments. These documents also may be available in or through librariesor other informational services.S1.3 Order of PrecedenceIn the event
43、of a conflictbetween the text of this guide and the references cited herein,the text of this guide takes precedence. Nothing in this guide,however, supersedes applicable laws and regulations unless aspecific exemption has been obtained.S2. TERMINOLOGYS2.1 accepted ship report (ASR), nthe ASR is thed
44、ocument that demonstrates the contractors performance withregard to weight control. The ASR highlights the differencesbetween the accepted weight estimate (AWE) or the allocatedbaseline weight estimate (ABWE) and the delivered ship asinclined.S2.2 accepted weight estimate (AWE), nthe AWE definesthe
45、weight and centers of gravity of a ship that was awardedunder a specification-type contract using the information thatwas available at the time of contract award. It establishescontractual values for weight and KG and is the baseline fordetail design and construction.S2.3 acquisition margins, nacqui
46、sition margins areweight and KG allowances included in the weight estimate tocover the inherent limits of precision and the undefinedvariations of component weight and centers of gravity that takeplace throughout the design phases and during the constructionof a ship. To provide for adequate weight
47、control and configu-ration control, acquisition margins are divided into five ac-counts: preliminary design margin, contract design margin,detail design and building margin, contract modificationmargin, and government-furnished material (GFM) margin.S2.4 actual weight, nactual weight is the value ob
48、tainedby a measurement of material on an accurate scale or otherweighing device.S2.5 allocated baseline weight estimate (ABWE), ntheABWE is the contractors definition of the weight and centersof gravity of a ship that was awarded under a performance-typecontract at the time of hull and propulsion co
49、nfigurationapproval. It is the baseline for detail design and construction.S2.6 baseline weight estimate (BWE), nthe BWE is anydesignated weight estimate that is used as a starting point in adesign phase for comparative analysis with subsequent weightestimates. Before contract award, the final estimate of eachdesign phase is usually the baseline estimate for the succeedingphase. After contract award, the AWE or ABWE usually is thebaseline estimate for the remainder of detail design andconstruction.S2.7 bidders independent weight estimate (BIWE),