1、 _- - .- .I i- MIL-C-504 O9 (MU) Amendment 2 14 December 1972 SUPERSEDING Amendment 1 9 June 1971 MIL-C-50409(MU) MILITARY SPECIFICATION COMPONENTS, METAL, FOR FIBER This Amendment forms a part of Military Specification Make the following changes to Specification MIL-C-50409MU, Title: Delete- M105“
2、. CONTAINER M105 MIL-C-50409MU dated 11 April 1969, dated 11 April 1969. . . . Section 1 *Paragraph 1.1: After “Packing stop support“ add “or washer“ #Section 2, Specification, Military: Delete “MIL-I- “MIL-C-4 5662-Calibrat ion System Requirements“ . Section 2, Drawings: WASHER“ . *Section 2, Publi
3、cation, Army: ment Tabulation“ *Section 3, Paragraph 3.2: After “9243287“ Add and 9258063 and 9276igti *Section 4 *Paragraph 4.2.1 : 45607-Inspection .of“ and substitute Add “9258063-WASHER“ and “9276019- Delete ?lET-9243286-Equip- Delete the second sentence in its entirety and substitute the follow
4、ing : “The first article sample shall consist of: a. Thirty five each packing stop supports and packing .stops and washer dwg. 9276019 and three treated 8 inch test Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-50407 (2) 81 i 7777706 O286173
5、7 iI MIL-C-50409(MU) Amendment 2 bars from each heat treater of the packing stop prepared in j accordance with FED-STD-151 method 211.1 from the same material as will be used in production. or; b. Thirty five washers, dwg. 9258063 as applicable in accordance with the terms of the contract, which hav
6、e been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract“. 9243286: Add “or 92760191 Major Category: Delete “none defined“ and substitute, “AQL O. 40 perce
7、nt“. Add the following #Section 4, paragraph 4.3.2.1: Add or- Washer“ and after Major defect, “101. Straightness. .Gage 01010“. Section 4, paragraph 4.3.2.2, Major category: Delete “None defined“ and substitute “AQL 0.40 percent“. Add the following Major defect, “101. Straightness .Gage 020101. Add
8、the following minor defect: “207. Corner radius max.Gage 02Q4 The inspection equipment required to perform the . examinations and tests prescribed in this section is identified under the “Method of Inspection“ headings in 4.3.2 and 4.3.3 see 6.3. Inspection Equipment Capability and ACGUraCy.-All ins
9、pection equipment and facilities shallbe of adequate quality and quantity to perform properly and accurately all the required inspections, measurements and tests. The inspection. equipment shall be maintained in satisfactory c:ondition for the continued proper.performance of these functions and shal
10、l. be calibrated in accordance with the provisions of MIL-C-45662. 4.3.4.2 Government Rights to Documentation.-Inspection equipment drawings and lists prpvided and revised in accordance with the requirements may be used by DOD activities for design, 4.3.4.1 . 3 Provided by IHSNot for ResaleNo reprod
11、uction or networking permitted without license from IHS-,-,-procurement, manufacture, testing, evaluation, production and receiving inspection, overhaul, shipping, storape, identifica- tion of tock, maintenance of equipment, construction, survey and whenever inspection equipment drawinzs are needed.
12、“ ,. Secion 6 - c - I:. “Paragraph 6.1: Delete “b. Data Cards-, in MIL-STD-116g1I, *Section 6: “Delete 6.it Add “6.3 Inspection Equipment- Designs .-Inspection equipment designs are of two types-Government Special Inspection Equipment (SIE) designs and contractor designs SIE designs, if avail- able,
13、 are designated by drawinpi numbers (on the Equipment Ljsts referenced on the Equipment Tabulation) or (on the Equipment Lists referenced on the Equipment Tabulation) or (under the “Method of Inspectionl.headinos in Section 4). Design responsibility for all other. inspection equipment is assigned to
14、 .the contractor. Equipment to be designed .by the contract.or is designated YD“. The contractor need not furntsh any design when a complete Governwnt SIE design is provided. - Unless otherwise specified? however, the contractor may submit alternate or modified contractor desims of SIE ln accordance
15、 with 6.3.2 and 6.3.3 should he elect to do so. 6.3.1 fol lowing : a. Detailed drawings whfch comvletely depfct all information necessary .for the fabrication and use of the item of insnection equipment. b. drawing as defined in MIL-STD-100. C. An envelope draw in, as detbed in !?IL-STD-100, which e
16、stablished the criteria which a detail desim shall meet. When envelope- drawings are specified the contractop shall prepare desimc which covply with th SIE des1pns.-SIE designs may consist of any of the A source control drawing or a speciflcation control criteria there! n . “ L- - 6.3.2 Contractor d
17、&iSns .-Contractor designs are required i specified and may include commei.cia2 equipment which the k contractor proposes to use. (Commercial equinment is defined as unmodified equipment which is cataloged and available for purchase by the general puhltc.) include appropriate operatfnp Instructions,
18、 calf bration procedures and maintename procedures. Commercial equipment shall be fully described by catalop listihfrs or other means 4 b for all inspection equipment for which SIE designs are not - Contractor desi-ns shall t. . , L. -.a.- . . . 6 _- .e / Provided by IHSNot for ResaleNo reproduction
19、 or networking permitted without license from IHS-,-,-which provide sufficient information to permit identification and evaluation by the Government any may include illustra- tions and engineerinr data. Designs shall be prepared for any special fixture(s1 required to be used with commercial, or with
20、 SIE desiFns if not otherwise covered thereby (see 6.3.1). MIL-D-1000) specified in the Contract Data Requirements Lists (DD Form 1423). “Inspection Equipment Desicn“ for Ruidance. number, paragraph number and defect number if such number has been assipned shall be referrenced on each contractor des
21、iEn together with the comrionent or assembly drawlng number and revision letter to which the specific design applies. Designs shall be of the category and form (per The contractor is referred to MIL-HDBK-204, The specification 6.3.3 Submission of designs for approval .-Contractor designs shall be ap
22、proved by the Government prior to fabricating or procuring the equipment. Designs shall be submitted for approval in accordance with the stipulations, time frame and distribution specified in the Contract gata Requirements List (DD Form 1423) or in the contract. inspection equipment designs is permi
23、ssible and encouraged, However, the completion date for desien review will be based on the date of the final submission of desirns. Arsenal desiqn review will normally be accorplished within one month after receipt. Partial submlssion of Picatinny “Asterisk indicated changes in those of Amendment- 1. * Custodian: Army-MU Project Number: 8irro-orj8 r Prepa.rina Activity : Ar my - Mu addition to or differing from .fr U. S GOVERNMENT PRINTING WFICG 1973-7 14-543/4389 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1