1、,a- - MIL-C-50471 (5) 13 W 777770b O437670 T MIL-C-50471 (AR) AMENDMENT 5 20 April 1990 SUPERSEDING AMENDMENT 4 7 December 1987 MILITARY SPECIFICATION CHARGE, SUPPLEMENTARY ASSEMBLY WITH SPACER FOR DEEP CAVITY LOADED PROJECTILE, LOADING ASSEMBLING AND PACKING This Amendment forms a part of Military
2、Specification MIL-C-50471 (MU), 14 January 1970, and is approved for use within the US Army Armament Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of efense. PAGE 5 Change the following incorrect paragraph numbers: 114. 2.3.2l to “4.2.2.2“
3、Ir4. 2.3.3 to “4.2.2.3 “4.2.3.4“ t.0 “4.2.2.4“ 4.2.2.4: Paragraph title, delete “(without pad and tab)“ and substitute “(without pad, tab and tape)I. PAGE 6 4.2.2.5: Delete Major 102 in its entirety and add the following Minors: “208 Pellets loose Manual 06002 209 Tape missing, incorrect or inadequa
4、te (100% Examination) Visual 06011 210 Pad adhesive missing, incorrect or inadequate ( 100% Exami nat i on) Visual 06012“. L. AMSC N/A 1 of 3 FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling ServicesMIL-C-50q7L (5) 13 7777906
5、 0437671 1 MIL-C-50471 (AR) AMENDMENT 5 PAGE a 4.2.3.1.1 Delete the last sentence in its entirety and substitute the following: “Testing shall be performed as specified in 4.3.1.1 or 4.3 .1.1.1“ . Add the following paragraph 4.2.3.1.1.1: “4.2.3.1.1.1 Pellets (Alternate sampling plan). - One sample p
6、ellet shall be selected from each pelleting press after each hour of production. Failure of the sample shall be cause for rejection of the hours production represented by the sample. Testing shall be performed as specified in 4.3.1.1 or 4.3.1.1.1.“ 4-2.3.1.2: Delete in its entirety. 4.2-3.2, line 2:
7、 Delete the foliowing: (applicable to pe 11 et s) PAGE 9 Add the following paragraph 4.3.1.1.1: 3 “4.3.1.1.1 Pellet specific gravity alternate method. The pellets shall be measured by averaging two diameters at right angles and 4 heights at 90 degree segments; measurements shall be made to one thous
8、andth of an inch. the volume shall be determined and the specific gravity calculated as follows: W Specific Gravity - 16.39V Where: W = Weight of sample in yrams V = Volume in cubic inches No chipped or broken pellets shall be used in determination of specific gravity.“ 4.3-1.2: Delete in its entire
9、ty. 2 Licensed by Information Handling ServicesMIL-C-50471 (AR) AMENDMENT 5 The margins of this amendment are marked with an asterisk or vertical line to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience on
10、ly, and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of. this document based on the entire content irrespective of the marginal notations , and relationship to the last previous amendment. Cu s todi an : Army - AR Preparing activity: Army - AR (Project 1315-AB37) 3 i Licensed by Information Handling Services
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1