1、MIL-C-63325 I3 999990b 03Ll825L 5 W . 5-3 747 . MIL-C-63325(AR) 1 March 1979 MILITARY SPECIFICATION COUPLING, FLUSH-LATCH ASSEMBLY AND METAL PARTS FOR . This specification is approved for use by US Army Armament Research and Development Command, and is available for use by all Departments and Agenci
2、es of the Department of Defense. . 1. SCOPE 1.1 This specification covers the parts and assembly for one type of coupling designated as Flush-Latch Coupling for Demolition Kit, Cratering: M180. 2 APPLICABLE DOCUMENTS 2.1 Issues of Documents. 7 The following documents of the issue in effect on date o
3、f invitation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Porovisions, General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MI
4、L-STD-1188 - Commerial Packaging of Supplies and Inspection by Attributes Equipment. PSC: 1375 Beneficial commenta (recommendations, additions, deletiona) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Army Armament Research and Developmen
5、t Command, Attn. DRDARQA, Dover, New Jersey 07801 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63325
6、 13 9999906 0348252 7 MIL-C-63325 (AR) DRAWINGS (See 6.5) U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND PRODUCT DRAWINGS 9329461 .- Coupling, Flush-Latch INSPECTION EQUIPMENT DRAWINGS C9329655 - Check Block V-Clamp (Copies of specifications, standards, drawings, required by suppliers in connec
7、tion with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer,) I 3. REOUIREMENTS 3.1 Materials. - Materials shall be in accordance with the I app licab le drawings and spec if icat ions. I technical Drovisions for first article ins
8、pection. Requirements for I the submission of first article samples by the contractor shall be as specified in the contract. I 3.5 Workmanship. - All parts and assemblies shall be fabricated and finished in a thorough workmanlike manner and all manufacturing, processing, and assembly operations shal
9、l be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease and oil (except where specifi- cally required), corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part or assembly nor
10、 shall they be contaminated by the cleaning agent. scratches not exposing base material. stamping shall be neat and sharply defined. Exterior surface coatings shall be continuous except for a few light All required markings and (Required packing shall be dry), I 4. QUALITY ASSURANCE PROVISIONS assur
11、ance provisions, - Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a. First Article Inspection b.
12、 Qua iity Conformance Inspection 4.3 First Article inspection 4.3.1 Sumbission. - The contractor sha 1 submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2 and 4.3.3. first article sample shall consist of the following items in
13、sample quantities as indicated in Table 1. The 4.3.2 Inspection to be performed. - See MIL-A-48078 and Table 1 specified herein. 4.3.3 Rejection. - (See MIL-A-48078) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I i* m I O rl 4 w c O Y Provided b
14、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- 4.4 Quality conformance inspection 4.4.1 Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination - (See MIL-A-48078). Unless otherwise specifi
15、ed in the classification of defects and test tables, sampling plans for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. performance of the inspections listed shall be in accordance with 4.4.4. Equipment necessary for the t 5 Provided by IHSNot for ResaleNo repro
16、duction or networking permitted without license from IHS-,-,-C- i I T I 1 (u - C C E E a t gv 22 a 2 a H d d W W o P I- zz WO I4 - tru : o4 wa a! rl d E si ?11 mmm 1 11111 1 1 M mmmmm m m b I. c . . . - . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
17、-,- Y”? OOd u Q, d pi s f U Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63325 (AR) 4.4.3 Testing. - Testing is described in the First Article and Quality Conformance Inspection tables. 4.4.4 Inspection Equipment. - The inspection equipment
18、(gage) required to perform the inspections and tests prescribed in this specification is identified in the Paragraph Reference/Inspection Method column in the-tables starting with paragraph 4.4.2.1, and the test method paragraph (See 4.5). The contractor shall submit for approval, inspection equipme
19、nt designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078, and 6.3 herein. 4.5 Test Methods and Procedures. - N/A 5. PACKAGING 5.1 -. - Packaging shall be in accordance with MIL-STD-1188. 5.2 Packing. - Packing shall be in accordance with MIL-STD-1188. 5.3 Marking. - Mark
20、ing shall be in accordance with MIL-STD-1188. 6. NOTES 6.1 Intended Use. - The Coupling covered by this specification is intended for use on the Warhead assembly.for the M180 Cratering Demolition Kit. 6.2 following: Ordering Data. - Procurement documents shall specify the a. b. Provisions for submis
21、sion of first article samples. c. Provisions of MIL-A-48078. Title, number and date of this specification. t 6.3 Submission of inspection equipment designs for approval. - (See MIL-A-48078). Commander, U.S. Army Armament Research and Development Command, ATTN: DRDAR-QAA-i, Dover, New Jersey 07801. S
22、ubmit equipment designs as required to 6.4 Distribution of ammunition data cards. - Distribution of data cards shall include the following: Commander, U.S. Army Armament Research and Development Command, ATTN: DRDAR-QAA-Q, Dover, New Jersey 07801. Provided by IHSNot for ResaleNo reproduction or netw
23、orking permitted without license from IHS-,-,-c MIL-C-63325 13 M 797770b 0348257 T -_ - MIL-C-63325 (AR) 6.5 Drawings. - Drawings listed in Section 2 fo this specification under the heading U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND (ARRADCOM) may also include drawings prepared by, and iden
24、tified as, Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, or Picatinny Arsenal Drawings, Technical data originally prepared by these activities is now under the cognizance of ARKADCOM. Custodian: ARMY-AR f Preparing Activity: ARMY-AR Project Number: 1375-A233 *u.s. GOVERNMENT PRINTING OFFICE: is7-60a-o22/i765 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1