1、24 September 1968 MILITARY SPECIFICATION DISPERSER, RIOT CONTROL AGENT, HELICOPTER OR VEHICLE-MOUNTED, M5 1%is specification is approved for use by US Army Armament Research and Uevelopment Command, Department of the Army, and is available for use by all Departments and Agencies ofthe Department of
2、Defense. 1. SCOPE 1.1 2, APPLICABLE DOCUMENTS This specification covers one type of disperser. 2.1 Government documents. The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of this specification to the extent specified herein: SPECIFICATI
3、ONS FEDERAL QQ-S-781 - Steel Strapping, Flat. TT-Ir-572 - Wood Preservative. ppP-1566 - Boxes, Folding, Paperboard. PPP-13-621 - Boxes, Wood, Nailed and Lock-Corner. PPP-B-636 - Box, Fiberboard. PPP-F-320 - Fiberboard; Corrugated and Solid, Sheet Stock (Container Grade), and Cut Shapes. PPP-T-60 - T
4、ape; Pressure-Sensitive Adhesive, Waterproof, for Packaging. FSC i040 : Beneficial coments (recommendations, additions, deletions) and any : pertinent data which may be of use in improving this document chouid : be addressed to: : Comment, Attn: : ing the self-addressed Standardization Document Impr
5、ovement Proposal : (DD Form 1426-appearing at the, end of this document or by letter. : : Commander, US Army Armament Research and Development: 21010 by us-: : DRDAR-TSC-S, Aberdeen Proving Ground, MD Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2
6、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.2 Components. All components of the disperser shall conform to the specifications and drawings listed on Drawing 116-6-166 and on the subsidiary drawings. 3.2 Assembl . The disperser shall be assem
7、bled as shown on Drawing u6-6-1 + 3.3 Functioning and leakage (see 6.3) . 3.3.1 hod IC-1 or IC-3. (d) Hood, gas mask. The hood shall be laid face up with bottom edges aligned and straps folded over the hood. Two hoos alternately reversed shall be placed in a paperboard folding box conforming to PPP-
8、B-566 and packaged in accordance with method IC-2. (e) Straps, webbinank and oher accessories and spare parls, preserved and packaged as specified in 5.2, shall be packed in a box conforming to Class 2, style 7, type 3 load of PPP-B-621. The disperser assembly shall be firmly secured to the skid bas
9、e. The spare parts and accessories (5.2.l,2) shall be firdy blocked and braced in the box to prevent free movement, All wood cornponents of the box shall be preservative treated by immersing in type II, composition A of TT-W-572 for a minimum period of 3 minutes. the appendix to PPP-B-. Inside dimen
10、sions of the box shall be approximately 37 by 24-1/4 by 46-1/2 inches in length, width and depth respectively. The box shall be closed and strapped in accordance with Strapping shall conform to Class B of 9s-781. 5.3.1.2 Pilot pack. Unless otherwise specified (see 6.2) a pilot pack shall be prepared
11、 in accordance with 5.3,l.l and tested in accord- ance with the applicable rough handling tests as specified in MILP-116. Tne tested pilot pack shall then be submitted to determine compliance with the packing requirements of this specification, 5.3.2 Level B. The disperser and components, packaged a
12、s specified in $,2, shall be packed as specified in 5.3.1 excep% that domestic type or class containers and coated finish strapping shall be used. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5.4 Marking, In conjunction with appropriate informatio
13、n provided in the contract or order (see 6.2) marking shall be as specified herein. Infomation requirements shall be interpreted- in accordance with MIL-SID- 123 * 5,4.1 E4arking levels A and 3, in addition to any special markings required by the contract or order, marking shall be in accordance wit
14、h YIL-STD-123 . 5. h. 2 Marking, commercial. ?larking shall be in accordance vith FEI)-STD- 356. 6.1 Intended use. This item is intended for use in siipressing riots aid similar disturbances , 6.2 Ordering data. Procurement documents should specify the follo&g: (8.) (b) (c) me of filling requii-ea.
15、(d) Pilot pack if required. (e) Preproduction. Title, number and date of this specification. Level of packing and packaging required. (1) (2) (3) Tine alloved for supplier submission of samples for Name anci address of test facility and chippfng instruc- Time required for the Government to notify th
16、e supplier Governinent test and evaluation after award of contract. tions when testing is performed by the Goverment. whether to proceed with production. ( f 1 (g) (h) Shipxent priorj.ty nm3er if applicable. (i) (3) (k) Applicable pertiilent identification marking. Applicable ad.d.recs marking perta
17、ining to shipping obligation Yrmsportation control number, project code number and required Fken erossed retorts insignia is required, Serial numbers assigned for end Item and ?.!9 gun. of contractor (overseas or domestic) to a POE or other domestic receiver. delivery d.ate, 6.3 Caution. Suiesc are
18、hereby mtified. tFat every pecaution should be t&en to potect personnel frorri injury vhen testing dispersers. 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1