1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-LLZL3 13 W 7977706 0293475 3 1 MIL-F- 11213 (ORD) I 3.5 Weld, - When the welded ejection pin cup and ejection pin are forcibly parted the Din shall m11 a button at least 7/64 inch in diameter from
2、 the cup. 3. 6 Freedom of ejection pin, - .The ejection pin shall snap to the outward position when the safety band assembly is removed from the complete metal parts assembly. 3.7 Workmanship. - All parts shall be free of chips, dirt, grease, and other foreign material. The c leaning method used sha
3、ll not injure or contaminate any of the parts. 4. 4.1 Lot. - A lot shall consist of parts for 100,000 fuzes unless a smaller AMPLING, INSPECTION, AND TEST PROCEDURES quantity is specified by the inspector. The first. lot manufactured on any contract, * however, shall consist of parts or 3,000 f 500
4、fuzed except when a new contract award follows immediately the manufacture of gatisfactory material of this character. 4.2 Insgection. - Inspection shall be as specified in Specification MIL-(2-2550 detonator holder, booster cup, ejection pin assembly, ejection spring, and safety band assembly remov
5、ed, shall have its setback sleeve locked in the armed position, and shall then be mounted in a fixture similar to that shown in figure 1. A total load of 3/18 pounds (including the weight of the modified detonator holder, the spring load of the indicator, and the test weight) shall be applied at suc
6、h a. rate that the firing pin does not move faster than O. 25 inch per minute. The apparatus shall be arranged so that when the firing pin reaches the firing position it makes an electrical contact with the contact post and closes the indicator light circuit. Th e distance the pin moves to reach fir
7、ing position shall be measured. After Lhe test the assembly shall. be returned to the unarmed position. 4.3.2 Acceptance. - Each metal parts assembly that. ments of 3.3 shall be rejected, subject to correction of its defects and resubmission . _ to meet the require- for test. I 4.4, Safety test, - 4
8、.4.1 Procedure. - Each metal parts assembly in the lot, less the detonator holder booster cup, and safety band assembly, and with the fuze in an upright position, shall be subjected to a load of %O + O. 5 pounds applied to the forward end of the set back sleeve. The load shall be &stributed evedy ar
9、ound the end surface of the sleeve. This test shall then be repeated with the safety band assembly reattached. 4.4.2 Acceptance, - Each metal parts assembly that fails to meet the require- ment of 3.4 shall be rejected, subject to correction of its defects and sesubmisaion for test. 4,5 Test of weld
10、 of ejection pin assernla&. - 4,5.1 Procedure. - One ejection pin assembly shall be selected by the inspector kom every 100 consecutive assemblies produced on each welding machine, THe ejection cup and ejection pin shall be forc:%bly separated in any convenient manner. be considered acceDtable if th
11、e reauirement of 3.6 is met. I 4,5.2 Acceptance, - The sublot of 100 consecutive ejection pin assemblies shall Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i I l I 1 I l I I I I I FI I I i I Y- - II .-1 DIAL INDICATOR THROUGH-SPINDLE 73-18-38E MODIFIED, WITH PLUG Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1