1、MIL-F-70bL3 (5) 9999906 20075b9 881 I INCH-POUND I MIL-F-70613 (AR) AMENDMENT 5 29 August 1995 SUPERSEDING AMENDMENT 4 O1 February 1991 MILITARY SPECIFICATION FUZE, PD, M936 LOADING, ASSEMBLING AND PACKING This amendment forms a part of MIL-F-70613 (AR), dated 08 December 1986, and is approved for u
2、se by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 2.1.2: Add the following: “PACKAGING DRAWING 9381686 - Packing and Marking of Container, M548 for Fuze, M935 or M936. * 3.3: Delete
3、 “Test 119, Procedure 2“ and substitute “Test 401, Test Procedure II“. PAGE 4 4.3.1: Change Quantity from “191“ to 11161.11 1 of 9 AMSC N/A FSC 1390 -. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
4、S-,-,- MIL-F-70bL3 (5 1 = 99999Ob 2007570 5T3 MIL-F-70613 (AR) AMENDMENT 5 PAGE 5 TABLE I: Under Performance Test, change “164“ to “134.“ PAGE 8 * 4.4.2.2, Delete Major 104 in its entirety. PAGE 10 4.4.2.4, Minor 202: Change “Location of spanner holes“ to read “True position of spanner holes“; and c
5、hange inspection method from “Visual“ to “Gage. PAGE 12 4.4.2.6, Major 103: Delete examination callout in its entirety and substitute: “Tape missing or improperly assembled (3 places - tape covering lead assembly and tape covering front and back of booster sub-assembly) . PAGE 13 4.4.2.7, Critical 2
6、: Change quantity from “108“ to 1170“. Major 101: Change number of sample units from “88“ to 1160“. Note (a): Delete in its entirety and substitute: “Two (2) or more duds shall cause the lot to be rejected. After three (3) consecutive lots have been accepted, according to this criteria, a special do
7、uble sampling plan shall be used, see 4.5.4.1.3. Major 102: Delete in its entirety. Note (b) : Delete in its entirety. PAGE 15 4.5.4.1.2: Delete in its entirety. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70613 (5) 9Ob 2007573 43T D MIL-
8、F-70613 (AR) AMENDMENT 5 4.5.4.1.3: Delete in its entirety and substitute: “4.5.4.1.3 &le samgle SO. After three (3) consecutive lots have met the ballistic requirements of paragraph 4.4.2.7, a special double sample for the ballistic, SQ phase shall be employed. Thirty (30) sample fuzes shall be fir
9、ed in accordance with 4.5.4.1.1. If no (O) duds result, the lot shall be accepted. If two (2) or more duds are found, the lot shall be rejected. If one (1) dud results, another sample of thirty (30) shall be fired. If one (1) additional dud results, the lot shall be rejected and testing shall revert
10、 to 4.4.2.7 again until three (3) consecutive lots have been accepted. If only the first sample is required, the premature burst sample size shall be reduced to fifty (50).“ 4.5.5, line 2: Change “M302“ to “M720“. PAGE 16 5.1: Delete in its entirety and substitute: “5.1 Packaaina. gackina and markin
11、a . Packaging, packing and marking shall be in accordance with the requirements and quality assurance provisions specified in drawing 9381686 and MIL-P-60412.“ 6.4.1, Functioning: Delete “Charge O“ And Charge 4 test firing with fuze setting at delay. Delete Note (b) in its entirety. Delete line for
12、“ARMING DELAY“ in its entirety and substitute “ARMING SAFETY. I PAGE 17 6.4.2, Functioning: Delete “Charge O“ And Charge 4“ test firing with fuze setting at delay. Delete Note (a) in its entirety. Delete line for “ARMING DELAY“ in its entirety and substitute “ARMING SAFETY. 3 Provided by IHSNot for
13、ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-F-70bL3 (5 1 9999906 2007572 37b MIL-F-70613 (AR) AMENDMENT 5 The margins of this amendment are marked with an asterisk or vertical lines to indicate where changes (modifications, additions, corrections, deletions) from
14、the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in this notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Preparing activity: Army-AR (Project 1390-0833) 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1