1、 MIL-P-4b4b3C 33 3 7979906 0332353 I -I : c1- a/7-/4 . u 31 /( - - -_I _ - _- - MIL-P-46463C (MU) 14 November 1966 SUPERSEDING MIL-P-46463B (MU) 31 August 1964 MILITARY SPECIFICATION PRIMER, PERCUSSION, M71A1 PARTS FOR 1. SCOPE 1.1 This specification covers the parts for one type of percussion prime
2、r designated as Primer, Percussion, M71A1. I 2. AFPLIGABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 MIL-P-10025 - Packagin
3、g, Packing and Marking for - Ammunition and Special .Weapons; General Interplant Shipment of Inert Ammunition Components, General Specification for Maintenance .Specification for MIL-1-45607 - Inspection Equipment, Supply and STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-ST
4、D-109 - QualityAssurance Terms and Definitions MIL-STD-1168- Lot Numbering of Ammunition MIL-STD-1235- Single and Multilevel Continuous . Inspection by Attributes (ABC-STD-105) Sampling Paocedures and Table for Inspection by Attributes FSC 1390 1 f- THIS DOCUMENT CONTAINS I! PAGES. 1 - - - -A - . :
5、Length from open end to flangeGage 206. Wrench slots missing Visual 207. Evldence of poor workmanship (see 3.3) . Visual threads, mhx. . Gage 02012 02013 02014 02015 02016 02017 d2018 Categories Defects Method of Code No. Crieical: None defined. Inspection Ma j or : AQL 1.0 percent 101, Large diamet
6、er Gage 102. Small diameter Gage Length of tip . Gage 103. 104. Total length including tip Gage 105. Length from tip to small diameter Gage 106. Radius improper . aage 201, Evidence of poor workmanship Minor : AQL 0.65 percetit (see 3.3) . Yisual 03001 03002 03003 03004 03005 03006 03007 Provided by
7、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- etIL-P-46463C (fW) 4,3.2.4 Disc., closing (see. wg, 7549178) Categories Defects Method of Code No, Inspection Critical: None defined. Major: AQL 0.40 percent 101. Diameter, min. Gage 04001 201. Diameter, max. Gag
8、e 04003 302. Coating incomplete or inadequate Visual 04002 Minor : AQL 1.0 percent . 202, Evidence of poor workmanship (see 3.3) . Visuai 04004 4.3.3 Inspection Equipment.-Equipment Tabulation Number ET-7289968 identifies the inspection equipment required to perform the examinations and tests prescr
9、ibed in this section, The contractor shall design inspection equipment in accordance with the instructions in paragraph 6.3. 4.3.3.1 Government rights to documentation.-Inspection equipment drawings and lists provided and revised in accordance with the requirements of the ET may be used by DOD activ
10、ities for design, procurement, manufacture, testing, evaluation, production and receiving inspection, overhaul, shipping, storage, identification of sbock, ordering and storage of replacement of parts, inspection of items at overhaul, general maintenance of equipment, construction, survey and wherev
11、er inspection equipment drawings are needed. - 4.3.3.2 Supply and maintenanue.-Supply and maintenance of the equipment listed in the ET shall be in accordance with Specification MIL-1-45607, 4.3.3.3 Government use of contractors inspection and test equipment.-The contractor shall make available to t
12、he Government all inspection and test equipment necessary for determining con- formance with contract requirements. Personnel for operating the equipment, and verification of its accuracy, shall be supplied by the contractor for the performance of examination or test by the Government, 8 Provided by
13、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-P-464b3C 13 999990b 03L2LbL O I MIL-P-46463C (MU) 5 PmPARATION FOR -DELIVERY 5.1 Packing and marking 5.1.1 6. NOTES Level C.-The parts shall be packed and marked in accordance with Specifi%ation MIL-P-10025. 6
14、.1 the following : Ordering data.-Procurement documents shall kpecify - a. b, c. ?itle, number and date of this specification. Data cards.-Data cards shall be prepared for each lot in accordance with the information specified in Standard MIL-STD-1167. Provisions for submission of first article sampl
15、es. 6.2 Inspection code numbers,-The five digit code nuinbers assigned to the inspections herein are to facilitate future data collection and analysis by the Government. Inspection equipment.-The contractor shall design inspection equipment as required by the referenced inspection Zquipment Lists (E
16、L) in accordance with the instructions bf paragraphs 6.3.1 through 6.3.5. Inspection equipment lists.-Inspection equipment lists indicaie the availability of inspection equipment designs by showing in the itnumber“ column of the list of inspection equipment (Form SMUPA 1010) the numbers of drawings
17、or Federal Stock Numbers Of existing equipment designs, or codes as indicated in paragraph 6.3.2. paragraphs 6.3.3 and 6.3.4. prepare detailed arawings in accordance with 6.3.4 for all the equipment coded as “Contractor Design! in the number column. TDese contractor Uesigns must be approved by the G
18、overnment prior Go fabrication or procuring of the equipment. submitted for approval as specified in 6.3.5. equipment as defined in 6.3.3 and 6.3.4 will be designated ia the EL by the following codes: 6.3 6.3.1 Design action required of the contractor is described in The contractor will be required.
19、to Designs shall be 6.3.2 Inspection equipment list codes,-The inspection CD - Contractor design on controlled contractor format MU - Army design, mandatory for use. and/or commercial equipment. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4
20、6Yb3C 13 E 9779906 03L2162 2 M _ - - _ IXr.L-P-46463C (MU) c 6.3.3 Army designs.-Army desfgns are reflected on detailed rawings which conip3.etely depict all the information necessary for the fabrication of the item of inspection equipment. The contractor need provide no design when an Army desin is
21、 listed for an item of inspection equipment. Army designs fall into two basic classifications; mandatory (designated lMU) and rion- -mandatory (indicated by drawing or Federal Stock Number). When an inspection equipment.list references mandatory Army designs, the contractor shall comply with, and us
22、e these design9 accordingly. The contractor may, however, in connection.with non-mandatory esigiis, and with the approval of the Government, design a1ternat.e inspection equipment or use comparable commercial equipment to facilitate his operations, OF commercial equipment selections must be approved
23、 by the Government prior ta fabrication or procuring of the equipment, Designs shall be submitted for approval as specified in 6.3.5 Sueh contractor prepared designs 6.3.4 Contractor designs.-Contractor designs are designs of inspection equipment for which the Government has assigned aesign responsi
24、bility to the contractor, Contractor designs shall be supported by detailed drawings which depict all in- formation necessary to completely fabricate, calibrate and operate an itan of inspection equipment. This requires that the necessary views, dimensions, materials, finish, notes, operating and ca
25、libration instructions be properly depicted in accordance with aaproved practices to the extent that further calculation or claeification will not be required. Unless otherwise specified, normally employs in his equipment design procedure provided such forrnat reflects the detail and information spe
26、cified above, suject bo the following controls: All submitted contractor designs shall conform to MIL-D-1000, Category E, Form 2. bility and reproducibility shall permit conventional making of clearly understandable, high contrast reproductions. shall submit one copy of final designs as a rolled set
27、. shall be submitted for approval as specified in 6.3*5. contractor esignc may be developed on the format the contractor .I. Legi- Designs Contractors 6.3.5 Submission of contractor designs,-Unless otherwise speciffe on the EL, all designs of equipment for inspection of cfects classified as critical
28、 and major shall be .submitted for approval to the Commanding Officer, Picatinny Arsenal, ATTN: Si:ILPA-ITDl-. All other designs of inspection equipment shall be asproved by the inspection element of the agency administering the contract; submission shall be as directed by the contracting officer. P
29、artial submission of inspection equipment designs is yeriiiissible and encouraged. for design review will be based on the date of the final submission of Ciesigns. However, the Arsenal completion date Picatinny Arsenal design review will be accomplished normally within one 10 - a month after receipt
30、. .* j Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-JIL-P- 6463 (NU) 6.4 Submission Of initial proauction samples.-Instructioris as to the location for evaluation of initial production shall be obtained from the contracting officer. request, the c
31、ontracting officer shall advise Picatinny Arsenal tlnu instructions will be issued accordingly, All inquiries srioulc be forwared to: Commanding Officer, Picatinny Arsenal, ATW: Upon receipt of such - SMUPA-ND7, Dover , New Jersey, Custociian: Army -MU Preparing Activity: Army -MU Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1