1、- MIL-P-639B5 23 9979906 0352971 b i“ MIL-P-63985 (AR) 15 January 1982 M IL I TARY SPEC I FI CATION PROJECTILE, 155MM, M718/M741 METALLIC HARDWARE FOR This specification is approved for use by U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agenci
2、es of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements not normally covered by the drawings, and provides quality assurance provisions for the fabrication and packing of metallic hardware for use with Projectile 155MM, M718/M741. 2. APPLICABLE DOCUMENTS 2.1 Gov
3、ernment documents. 2.1.1 Specifications and standards. Unless otherwise specified, theollowing specifications and standards of the issue . listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification
4、 to the extent specified herein. SPEC I FI CAT I ON S MIL I r Ti RY S TAN DA RD S MILITARY . MIL-STD- 105 MIL-STD- 1169 Ammuni ti on, Standard Quality Assurance Provisions, General Specification For. Sampling Procedures and Tables for I nspec tion by At tr i butes. / Packaging, Packing and Marking f
5、or Shipment of Inert Ammunition Components. I- l Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improvin this document should be addressed to: Commander, US Army Armament aesearch and Develo ment Command, Standardization Document Improvement
6、 Proposal DD Form 1428) appearing at the end of this document or by letter. Attn. DRDAR-QA. Dover, New Jersey 07801 b using t R e self-addressed Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-b3785 13 W 777770b 0352Li72 M MIL-P-63985(AR) 2.1.2
7、 Other Government documents, drawings, and publications. The following other Government documents form a part of this y3cification to the extent specified herein. DRAWINGS U. S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND PRODUCT AND PACKAGING DRAWINGS 9277747 - Plate, Pusher 9278017 - Shim (Copi
8、es of specifications, standards, drawings, and publications required by the suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 2.1.3 Order of precedence. In the event of a conflict between the test of
9、 this specification and the references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS 3.1 Material. Materials shall be in accordance with the applicable drawings and specifications. 3.2 Parts. The parts shall comply with all requixements specified on the drawings
10、 and with all requirements specified in applicable specifications and standards. 3.3 First article inspection. This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.4 Workm
11、anshi . The parts shall be fabricated and finished in a thoroug + wor manlike manner. They shall be free of burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurous to any part
12、, nor shall the part be contaminated by the cleaning agents. All markings and stamping shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance rovisions. Unless otherwise specified herei,n or in the contract, !he provisions
13、of MIL-A-48078 shall apply an Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-b3785 13 I 777770b 0352Li78 7 I c 4.4.3 Inspection equipment. Inspection equipment required to perform the inspections prescribed in this specification are identified
14、 in 4,4.2.1 and 4.4.2.2. See 6.2 for details concerning responsibilities for inspection design and approval. 5. PREPARATION FOR DELIVERY 5.1 Preservation and packaginq 5.1.1 Level C. The parts shall be preserved and packaged in accordance with MIL-STD-1169. 5.2 Packing. 5.2.1 Level C. The parts shal
15、l be packed for shipment in accordance with MIL-STD-1169. 5.3 Markin . Marking of the carton shall comply with MIL-STD-1 TS 69 5.4 Shi in . When parts from more than one lot are shipped as a carload ;-eaChqot shall be kept separate and the division between lots clearly indicated to prevent mixing of
16、 the lots in transit. 6. NOTES 6.1 Ordering data. See MIL-A-48078. 6.2 Submission of designs for approval. See 6.2.3 of MIL-A-48078. Submit equipment designs, as required, to Commander, Armament Research and Development Command, ATTN: DRDAR-QAT-I, Dover, New Jersey 07801. Custodian: Army-AR Preparing activity: Army-AR (Project 1320-A640) Q US. GOVERNMENT PRINTING OFFICE 1982 O - 505-0221971 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1