1、MIL-P-70976 13 7777906 012276 7 S-31-a- MIL-P-70476 (AR) 15 February 1985 MILITARY SPECIFICATION PROJECTILE, 155MM: INEKi, M483Al LOADING, ASSEMBLING AND PCKING = This specification is approved for use bythe US Army Armament Munitions and Chemical Command, and is available for use by all Departments
2、 and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the loading, assembling and packimr one type of projectile designated as Projectile, 155MM, Inert, M483Al. 2. APPLICABLE DOCUMENTS 2.1 Government documents. I- 2.1.1 Specification and standards. Unless otherwis
3、e specified, the followingsCcations and standards, of the issue listed in that issue of the Department of Defense Index=of Specifications and Standards (DoDISS) specified in the solicitation form a part of this specification to the extent specified herein. .c SPECIFICATIONS MILITARY MIL -A48078 STAN
4、DARDS 5 MILITARY MIL-STD-105 MIL -STD-4 10 - Ammuntion, Standard Quality Assurance Provisions, General Specification For - Sampling Procedures and Tables for - Nondestructive Testing Personnel . - Qualification and Certification I ns pecti on by Attribut es FSC 1320 Beneiiciai commenta (recomniendat
5、ions. additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Army Armament Research and Development Center, Ath: AMSMC-QA, Dover, New Jersey 07801-5001 by using the self-addressed Standardization Document Improvement Proposal
6、 (DD Form 1426) appearing at the end of this document or by letter. fl THIS DOCUMENT CONTAINS - - PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-P-70476 13 7797906 0182277 9 MIL-P-70476 (AR) MIL-STD-1235 - Single and Multi-level Continuo
7、us Sampling Procedures and Tables for . Inspection by Attributes 2.1.2 Other Government documents, drawings, and publications. The following other Gov,ernment documents , drawings and publications form a part of this specification to the extent specified herein. e DRAWINGS ( See 6. however, a few li
8、ght scratches not exposing base material arid protective coating mssing per paragraph 4.4.2.10 are permitted. All required marking and stamping shall be neat and sharply defined. h e. 4. QUALITY ASSURANCE PFOVISIONS 4.3 First article inspection. ri 4.3.1 Submission. The contractor shall submit a fir
9、st article as designated by the contracting officer for evaluation in T - 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70476 13 W 777770b 0382297 2 m MIL-P-70476 (AR) accordance with the provisions of 4.3.2. The first article sample shall
10、consist of the following items in sample quantities as indicated. Part description Drawings Projectile Steel Shim . 9381450 921 53 97 ii Quantity 12 25 6 4.3.2 Inspection; to be performed. See MIL-A-48078 and Table I herein. 4.3.3 Rejection. a * See MIL-A-48078. Provided by IHSNot for ResaleNo repro
11、duction or networking permitted without license from IHS-,-,-MIL-P-70476 13 m 777770b OL2300 5 m r I P I c: 5 4 8 o -k .I I- :- 6 (v (v m Cr) . . I 5 - i. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-P-7047b 13 9979906 01230L 7 MIL-P-70476 (
12、AR) 4.4 Qual i ty conformance i ns pe ct i on. I 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formationprovisions of MIL-A-48078. In addi tion, each inspection lot shall contain: a. Grenades 4M42) from one finally accepted lot interfix b. Grenades (M46) from one finally
13、accepted lot interfix c. Projectile metal parts (body assembly) from one lot d. Base and cap assemblies from one lot interfix number e. Adapters from one lot interfix number from one f. Forward plates from one lot interfix number from one g. Sleeves from one lot interfix number from one h. Spacers f
14、rom one lot interfix number from one i. Splines from one lot interfix number from one j. Loaded projectiles of one weight zone (see Note 1) to the zone weight restriction may be accumulated into“a hybrid lot provided they originally met all other lotting restrictions during manufacture and. the orig
15、inal lot passed all acceptance tests. number from one manufacturer. number from one manufact urer. interfix number from one manufacturer. from one manufacturer. manufacturer. manufacturer. manufacturer. manufacturer. manufacturer. P - Note 1: Projectiles falling out of the inspection lot criteria du
16、e a 4.4.2 Examination. See MIL-A-48078. -_II a. Sampling plans. Unless otherwise specified in the ClassificatioiTof-Detects and Test Tables sampling plans for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. Cmtinuous sampling in accordance with MIL- STD-1235 may
17、 be utilized if approved by the Procuring Activity. b. Automatic gaging. Facilities equipped with Government furnished automatic gwmpable of performing 100% inspection of any characteristic shall utilize this capability in accordance with the contract. c. Alternate inspection procedures. The contrac
18、tor may -.- -I_- propose the use of alternate inspection procedures in lieu of conducting sampling inspection for defects listed in this specifi- cation (See paragraph 6.8). c c 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70LI76 33 = 7777
19、906 0382302 9 W E w pi rn 2 H c. rl Ln w . . nl m dp O O rl 4-1 O U c a, E U m Q, ri . Cu hlN Cu Cu m mm m m . . . a, body to ogiw ad ogiw to lifting plug joints rust be tested) and a pre-determincd volume of air shall be deliwered to produce the specifid pressure between the insi 078l-5001, 6.4 Sub
20、misaim of iata cards. In additfon to te normal dia- triition of reoor, when the projectile i8 procured by the U.S. Army Armament Material and Readiness Cmand, one (1) oopy of all armmition data card. ahall be forwarde tat Cmarxler, USA, AWX:, ATTNs AWSC3C-ORR-O (DI, Dover, WJ 07801-5001. 19 -. . Pro
21、vided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70976 13 7777906 01B2315 7 MIL-P-70476 (AR) 6.5 Data requirements. Data item descriptions (DID) required for subiiSan-iin3-spscificatfon are as folwm: Para ra 4.5. d5-E 4. s. 3, 4.5.4, 4.5.5 6.0 lica
22、ble D. 1.0. 3%- -7 Data re irementm GUdEStT Def 8ct-Repoit Procedure Report *DI -T-5372 (Tailored) *Delete a, b, CI d of pargra* 1 block 10, DD Form 1664, and mubmttute contractor demiqat4 parameters and limits. T8 abavw bat8 shall k forwarded in aCWrdanC8 with the require- untm of the wntract to Ca
23、iander, ARDC, ATTr AHBE-OAR-0 (D), baver, &I 07801. 6.6 Vrwi ar Drawingm limtd in Section 2 of thim spcifica- Center (NUX) nay alma inclube drawings prepared by, an identified am, tdgwd ArB8nol Frankford Arrenal, Rock Irland Arsenal, Picatinny ArIeMI, or US Amy Armament Remearch and Develapent Carir
24、and (ARRADM) dradngr. Technical data originally prepared by teme activtia ia now under the cognizance of Am. tiai undenG -+ eadng U.6. Amy Arriment Remearch and Developient All autoriatic temt and e amtractor mhall be aubjectd to a priodic verification and calibration check at fregrent intervalm dur
25、ing noraal production. The procedures aha11 include am a minimums frequency, method of verificatiai, and the nethad of retrieval of itam produced between verification/ calibraticm. There procedurem rhall tie included in th. operation/ calibratiari procedures as required by paragraph 4.4,4. 6.8 Alter
26、nate impaction procedurea. indicate an ewnaic benefit, and nwt almo clearly i&ntify that there im no reduction in product quality. 6.8.2 Alternate in# ctim acedurer. Th4 aternate inpcc- tcm proceurem am -+-+ a m n rum mu ncruElcr a. Frequency (production interval) for trsldlating equip rent f mction
27、ng. b. Pr0poa.d method of mlidation to inclode proMa and impaction drawings. c. 3iion.ot mte ia1 amtro poceuurem to tw irpared during the praductfon interval between validations (Ilote: Under these provijiaris fina1 acceptance will b wfthheld from raterial produced during the producton interval unti
28、l conducting sat i sf act ory va 1 dat i on . ) ! 20 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-70476 33 W 7779906 0382336 7 W t HIL-?-747& (m) 6.0.3 oval of alternate nmmtcm proedruru. 0ropa.d pl& rh.11 par para. 6.4 for ipprovrl. . 21 -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1