1、hIL-P-7067q 13 W 7777906 0356676 O R s-37-K MIL-P-70674 4 April 1988 MILITARY SPECIFICATION PROJECTILE 155MM: XM864 METAL PARTS FOR BASE BURNER ASSEMBLY This specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all Departments an
2、d Agencies of the Department of Defense. SCOPE 1. - 1.1 Scope. This specification covers the requirements, quality evaluation provisions, and packing for Base Burner Assembly Metal Parts for the XM864 projectile. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. T
3、he following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified (see 6.2), the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplemen
4、t thereto, cited in the solicitation. 0 SPECIFICATIONS MI LI TARY MIL-A- 48 O 7 8 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Improving this document
5、 should e addressed to: Commander, U.S. Army Armarnent,Munitions and Chemical Command, Atm. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing et the end of this document or by letter, AMSC N/A FSC 1
6、320 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70679 13 7777706 035bb77 2 E MIL-P-70674 (AR) MI LI TARY MIL-STD-105 - Sampling Procedures and Tables for MI
7、L-STD-1169 - Packaging, Packing and Marking for MIL-STD-1235 - Single and Multilevel Continuous Inspection by Attributes Shipment of Inert Ammunition Components Sampling Procedures for Sampling by Attributes 2.1.2 Other Government documents, drawinqs, and publications. The following other Government
8、 documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS U .S. ARMY ARMAMENT, RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT AND PAC
9、KING DRAWINGS 8597488 8822518 9 381110 9381116 Plug CUP Re ta ine r Housing, Igniter (Copies of specifications, standards, handbooks, drawings, and publications required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed b
10、y the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing
11、in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 General. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings and referenced specifications. 3.2 Defec
12、t standards. Defect standards must be approved by the technical engineering agency. All visual standards for defects will be established for each contract after the first months production or whenever requested by the contracting activity . 2 Provided by IHSNot for ResaleNo reproduction or networkin
13、g permitted without license from IHS-,-,-MIL-P-70674 13 I 777730b 0356678 4 I O I . I l l MIL-P-70674 (AR) 3.3 First article inspection. When specified in the contract or purchase order, a sample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4
14、.3) 3.4 Control dimensions. 3.4.1 Tool control dimensions. Dimensions marked tool control shall be gaged after eight hours maximum production on each machine in operation and prior to any tooling change. Where destruction of components is necessary to inspect these dimensions, measurements of the to
15、ol may be substituted provided the contractor has established correlation between the tool dimension and the component dimensions prior to the start of production. The contractor shall be responsible for maintaining adequate surveillance and to institute corrective action that assures drawing requir
16、ements are being met throughout the life of the tool. 3.4.2 Process control dimensions. The contractor shall prepare a process control plan for the dimensions marked process control. The plan shall be submitted to the technical agency for approval prior to use. Dimensions to be gaged for process con
17、trol are to be assured to a .40% AQL. 3.5 Protective finish. Details of the proposed procedure for protective coating the various components shall be submitted in writing to the Government Technical Agency and written approval received prior to initiation of production. The proposed procedure shall
18、include materials, process and equipment to be used by the contractor, detailed method of control including limits for time, temperature, concentration and all other information pertinent to the process. Approval of process, materials, or equipment implies no guarantee of acceptance of the results o
19、btained in use. 3.6 Workmanship. The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.61 Burr and sharp edges. No component shall have a burr or sharp edge which might interfere with assembly or function of the item or which mig
20、ht be injurious to personnel handling the item. 3.6.2 Foreign matter. All parts and assemblies shall be free of chips, dirt, grease, oil, rust, or other foreign matter which may interfere with final inspection and completely free of same prior to shipping. i l. 3 i Provided by IHSNot for ResaleNo re
21、production or networking permitted without license from IHS-,-,-MIL-P-70674 13 W 7979906 035bb79 b W MIL-P-70674 (AR) 3.6.3 Threads. Threads shall be full and undamaged, for the entire minimum length or depth as required by the applicable drawings. 3.6.4 Painting. Painting shall be complete, void fr
22、ee, and undamaged. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibi-lity for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements and for the provisions of MIL-A-48078 as specified herein. Except as o
23、therwise specified in the contract or purchase order, the contractot- may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set fo
24、rth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part o
25、f the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of
26、the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of inspections. The following types of inspectionshall he conducted on this i
27、tem: a. First Article Inspection b. Quality Conformance Inspection 4.3 - First article inspection. 4.3.1 Submission. The contractor shall submit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall c
28、onsist of the following items in the quantities as indicated . 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- PART DESCRIPTION CUP Plug Housing, Igniter Retainer MIL-P-70674 (AR) DRAWINGS 8822518 9381116 8597488 9381110 QUANTITY 25 10 10 10 4.3.2
29、 Inspections to be performed. See MIL-A-48078 and Table I herein. 4.3.3 Rejection. See MIL-A-48078. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 MIL-P-70b74 13 797770b 035bb1 4 a! I ! I I- - I a e W 01 Y I k! e Y a II: K - rl cv m di c1 cv cv hl
30、 W W W W W W W W . . b * b . * . . . rl rl ri rl m M m M * * * * I I I I m O O O do fl dp QP d Op QQ dp Qdpddpdp 00000000 000000 InmmmIn WWWWW *.e*Kr *.e* . 00000000 000000 00000 a, +J a, rl a rl !I I 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
31、-H H L) w pi rB 2 H w O i Eri 2 O V 3i H 2 o r si n 8 Y w Z o F: !2 k 3 U tn 5 rl pi m cv * * . . . - dpdPdPcEpdPdPoQ dp dPdp oipdpdp 0000000 o mu) mulm +dididi*? di ww www .o. * *. * a a, d .I4 w a, a 2 O Z a, E rll 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
32、ense from IHS-,-,-l I I l I l I i I I l I 1 I o H i3 u Fil PI O z H w u ri eg 2 O u hl 8 rl E H rlrirlrlrlrl rlrl rl rlrl rlri rl rl MmmMMM MM c*) mm mm M m *. .b . . dpdpdpdPdpdP dPo0 OQ OW& dpdp dp dp 000000 O0 o O0 O0 o o W*W* W* d -* *d d( -3 000000 O0 o O0 O0 o o RL* *e . . a, m rd J2 w O w O c
33、i m a, rl O ci tn m a, ri O c mu m a, rl O c JJ a, aiu u 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70674 13 = 9979906 0356687 5 m 2 O I3 u w Pi H H z w O i E4 2 O u * I3 s 3 o, rl AA rlrlrlrlrlrlrlrlrlrlrlrlrl rlrlrl rlrlrlw mmmmmmmmmm
34、mmm mMm mmmm e .o. u a, a C O u a, urn a, u a, c, a c O u a, rn a, c, a, rl ai 12 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70674 13 W 7999706 035bb 7 0 MIL-P-70674 (AR) 4.4.3 Testinq. Testing is described in the Quality Conformance Inspe
35、ction Tables and herein. * 4.4.4 Inspection equipment. For inspection equipment required to perform the examinations and tests prescribed herein the contractor shall submit for approval inspection equipment designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.3 he
36、rein. 4.4.4.1 Automatic inspection equipment. All automatic test and inspection equipment when utilized by the contractor shall be f subjected to periodic verification or calibration check during production. The procedures shall include as a minimum: frequency, method of verification, and the method
37、 of retrieval of items a produced between verification/calibration. These procedures shall be included in the operation/calibration procedures as required by the above paragraph. 5. PACKAGING 5.1 Domestic shipment plug and cup. Packaging, packing and marking for the plug and for the cup shall be in
38、accordance with MIL-STD-1169 Level B. 5.2 Domestic shipment retainer and igniter housinq. Packaging, packing and marking for the retainer and for the igniter housing shall be in accordance with MIL-STD-1169, Level B. In addition, packaging shall be, as a minimum, single item packaging as stated in t
39、he paragraph entitled “Arrangements“ of MIL-STD-1169 and moisture proof as stated in the paragraph entitled “Item Protection“ of MIL-STD-1169. Additional packaging shall be provided as required to prevent wearing of the oxide coating during shipment. 6. NOTES 6.1 Intended use. The base assemblies co
40、vered by this specification are intended for the Projectile, 155MM: XM864. 6.2 Order ins data. See MIL-A-48078. 6.3 Submission of inspection equipment designs for approval. See MiL-A-48078. Submit equipment designs as required to Commander, ARDEC, ATTN: AMSMC-QAR-I (DI, Picatinny Arsenal, NJ 07806-5
41、000. This address will be specified on the Contract Data Requirements List, DD Form 1423. Unless otherwise specified, data item DI-R-1714 will apply. 6.4 Data requirements. When this specification is used in an acquisition and data are required to be delivered, the data requirements indentif ied bel
42、ow shall be developed as specified by an approved Data item Description (DD Form 1664) and delivered in accordance with the approved Contract Data Requirements List (CDRL), incorporated into the contract. When the provisions of DOD FAR Supplement Part 27, Sub-Part 27.410-6 (DD Form 1423) are 13 Prov
43、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70674 (AR) invoked and the DD Form 1423 is not used, the data specified below shall be delivered by the contractor in accordance with the contract or purchase order requirements. Deliverable data requ
44、ired by this specification are cited in the following paragraphs. Paragraph Data Requirement Tit le Applicable DID 4.4.4 3.5 Inspection Equipment D I-R- 17 14 Descriptive Docu- mentation Procedure Report * DI-T-5372 (Ta i lor ed) * Delete a, b, c, d, of paragraph 1 block 10, DD Form 1664, and substi
45、tute contractor designated parameters and limits. (Data item descriptions related to this specification, and. identified in section 6 will be approved and listed as such in DOD 5000.19L, Vol. II, AMSDL. Copies of data item descriptions required by the contractors in connection with specific acquisit
46、ion functions should be obtained from the Naval Publications and Forms Center or as directed by .the contracting officer .) 6.8 Subject term (keyword) listing. Ammunition Artillery Military Specification Base Burner Parts Turnip Mun it ion Projectile, 155MM, XM864, Metal Parts For Base Burner Assemb
47、ly 6.9 Drawinqs. Drawings listed in Section 2 of this specification under the heading US Army Armament Research, Development, and Engineering Center (ARDEC) may also include drawings prepared by and identified as ARRADCOM, Edgewood Arsenal, Frankford Arsenal, Rock island Arsenal, or Picatinny Arsenal drawings. Technical data originally prepared by these activities is now under the cognizance of ARDEC. Cus tod ian : Army - AR 14 Preparing activity (Project 1320-A9 44) Army - AR Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1