1、MIL-S-63qZq LO 9999906 0350246 O II 3- 37-03 MIL-S-63429( AR) 11 AUGUST 1981 MILITARY SPECIFICATION SLIDER ASSEMBLY FOR ARMAMENT SUBSYSTEM, HELICOPTER, 2QMM: M97E1 and M97E2 This specification is approved fer use by the U.S. Army Armament Research and Development Conmiand and is available for use by
2、 all Departments and Agencies of the Department of Defense. i;- 1. SCOPE - 1.1 This specification covers one type of slider assembly designated * as Slider Assembly for use on Armament Subsystem, Helicopter, 20MM: M97E1 and M97E2. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following docume
3、nts of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: SPECIFICATIONS MILITARY MIL-C-6021 - Castings, Classification and Inspection of MIL-1-6868 - Inspection Process, Magnetic Part i c 1 e M I L-W- 6 3 1 5
4、0 - Weapons and Support Materiel, Standard Qual i ty Assurance Provisions For MIL-S-81591 - Steel, Investment Castings, Carbon and Corrosion, Resisting Licensed by Information Handling ServicesMIL-S-63429( AR) STANDARDS MIL I TARY M I L - STD- 10 5 - Sampling Procedures and Tables for Inspection by
5、Attributes DRAWINGS (SEE 6.5) U. S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 11 830565 - Slider Assembly PACKAGING 11830565 - Slider Assembly (Packaging Data Sheet) AMERICAN SOCIETY FOR TESTING AND MATERIALS ASTM-E 18 - Method of Test for Rockwell H ar d ne s s ASTM-B 117 - Method of Salt Spra
6、y (Fog) Testing 3. REQU IREME NTS 3.1 Material. Materials shall be in accordance with applicable drawings -if i cations . 3.2 Assembly. The assembly shall comply with all requirements specified on Drawing (Dwg.) 11830565, all associated drawings, and with all requirements specified in applicable spe
7、cifications. 3.3 First article testing. This specification makes provisions for first article testing, contractor shall be as specified in the contract. Submission of first article quantity by the 3.4 Workmanshi . All parts and assemblies shall be fabricated, and assembled + in a t orough, workmanli
8、ke manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust, and other foreign matter. The cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agents, coatings shall be continuous; however, a few light scratches not exposin
9、g base material may be permitted. be neat and sharply defined. Exterior surface All required marking and stamping shall c A. i Licensed by Information Handling Services MIL-S-63429 10 II 9779906 0350248 4 m - MIL-S-63429( AR) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and qual
10、ity assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-W-63150 shall apply and are made a part of this detail specification. 4.2 Classification of inspection. The following type of inspection shall be conducted on this item: a. First article inspection.
11、 b. Quality conformance inspection. 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall consist of the following items in sample
12、quantities as indicated. Part Description Drawings Quantity Spindle, Recoil, RH 167C1559 5 Housing, Slider 11830560 5 Test bars 11830560 (See MIL-S-81591) 3 S1 i der Assembly 11830565 5 4.3.2 Inspection to be performed. See TABLE I herein. 4.3.3 Rejection. If any assembly, component or test specimen
13、 fails to comply with any of the applicable requirements, the first article sample shall be rejected. its inspection upon any failure of any assembly, component or test specimen in the sample with any of the stated requirements. The Government reserves the right to terminate a 3 Licensed by Informat
14、ion Handling ServicesMIL-S-63427 LO M 7777906 0350247 6 M O H 5 W a v, U W -I o r a t; H IL . U W -I m z v) c, E: aJ S O Q o U c rd h n o r 5 4“ V) L al U v, *I- F- I Cu (u. (u . . mmm (uN mm (u m . III III I I nn n fiKi 9 VU U O mmm mm cf v) c, O al L 7 al UW V) .u u al rc IIaJ eu V) .u u al rc al
15、U L O lI- EI O C (d c *I- X al 9 U al Y Q E (d V) al -c +-, c O U al O rc E b a al n nn (dn UV O a 4 4 Licensed by Information Handling Services- MIL-S-63429( AR) 4.4 Quality conformance inspection. 4.4.1 Lot formation. The term Ilinspection lot is defined as a homogeneous collection of units of pro
16、duct from which a representative sample is drawn or which is inspected 100 percent to determine conformance with appl i cable requirements. inspection shall represent only the inspection lot from which drawn and shall not be construed to represent any prior or subsequent quantities presented for ins
17、pection. Homogeneity shall be considered to exist provided the inspection lot has been produced by one manufacturer in one unchanged process, using the same materials and methods, in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions and c
18、omplies with the provisions for submission of product as specified in MIL-STD-105. submitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein, regardless of the type of inspection procedure which is being applied to determine conformanc
19、e with requirements. Units of product selected for All material 4.4.2 Examination. The examinations listed in the item detail specification for C1 assif i cati on of Defects s ha1 1 be performed on inspection lots as defined in 4.4.1 of this specification. a. Sampling plans. Unless otherwise specifi
20、ed in the Classification of Defects and Test Tables, samplinq plans for major and minor defects shall be in accordance with MIL-STDI105, Inspection Level II. 5 Licensed by Information Handling ServicesMIL-S-b3427 LO 777770b 0350253 4 I n e 0-l Cu b- M Co I u? I E a v H (d 3 S rd zz O =E u? E# Y WUJ
21、OP s- ai O cn Cn I- cn WE s +I- OU ST: .I- sn *I- aim ais L I- %Y ais- 2.u .I- in E-. I 0 E Licensed by Information Handling Services- MIL-S-b3429 LO M 9799906 0350252 b 8 u N 8 t rl P I i? - E a 2 E w ZE 8 k! H 9 W VI v, ac so aia, uv cc wu L-L O0 uu % uu ET rd mcn ss .r .I- 77 E .fA fA nn an UV 8
22、Licensed by Information Handling Servicesa P U L I w 1 2)1 U . MIL-S-63q27 LO W 7777706 035025q T v) v) Q) c -0 L m er O0 c c,c, O 9 Licensed by Information Handling ServicesMIL-S-63429( AR) 4.4.3 Testing. Testing is described in the First Article and 4.4.4 Inspection equipment. The inspection equip
23、ment required to Quality Conformance Inspection Tables. perform the examinations and tests prescribed herein is described in the Paragraph Reference/Inspection Method Column in the tables starting with MIL-W-63150 and 6.3 herein. J Paragraph 4.4.2.1. equipment designs in accordance with the terms of
24、 the contract. See The contractor shall submit for approval inspection 4.5 Test methods and procedures. 4.5.1 Radiographic inspection. The inspection shall be performed in 4.5.2 Hardness. This test shall be performed in accordance with 4.5.3 Magnetic particle inspection. This inspection shall be acc
25、ordance with MIL - C 6021 and MIL - W- 6 3 1 5 O ASTM-E 18. performed in accordance with procedures specified in MIL-1-6868 and MIL-W-63150. 4.5.4 Salt s ra test. This test shall be done in accordance with the procedures + speci ie in ASTM B 117. Unless otherwise specified in the applicable drawing
26、the mSnimum exposure time shall be one and one half (1 1/2) hours using a 5% sodium chloride solution. If any part shown evidence of corrosion (red rust, salt deposits, etc), it shall be classed defective and the represented quantity shall be rejected. 4.5.5 Chemical analysis. This test shall be per
27、formed in accordance with MIL-S-81591. 4.5.6 Tensile strength. in accordance with MIL-S-81591. with yield and tensile strengths, reduction of area, elongation and This test shall be performed on test bars Observation shall be made for compliance . 1 hardness of the test bars. 4.5.7 Surface roughness
28、 and hardness. This test shall be performed 4.5.8 Visual inspection. This inspection shall be performed in in accordance with MIL-S-81591. t accordance with MIL-C-6021. 10 Licensed by Information Handling ServicesMIL-S-63427 LO 7777706 0350256 3 0 MIL-S-63429( AR) 5. PACKAGING 5.1 Preservation, pack
29、aging, packing and marking. Slider Assemblies shall be preserved, packaged, packed and marked in accordance with the requirements of the preservation and packaging data sheet. 6. NOTES 6.1 Intended use. The slider assembly covered by this specification is intended for use with Gun, Automatic, 20MM:
30、Subsystem, Hel i copter, 20MM : M97E1 and M97E2. following : M197 on Armament II 6.2 Ordering data. Procurements documents shall specify the 6.2.1 Procurement requirements * a. b. C. d. Section 4 of in Section 4 e. f. Title, number and date of this specification. Quantity required and del i very sch
31、edules. Seri al ization requirements, if applicable. Quality Conformance Inspection, if other than specified in this spec if i cati on. First Article Sample requirements, if other than specified of this specification. Packaqinq requirements, if other than specified in Section 5 of item detail specif
32、ication. g. Certificates of conformance for each lot or shipment of product and as specified in MIL-14-63150. 6.3 Submission of inspection equipment design for approval. See MIL-W-63150. Commander, ARRADCOM, ATTN: DRDAR-QAA-I, Dover, NJ 07801. Request specification number, item nomenclature and classification of defects and tests paragraph . tquipment designs shall be submitted as required to a d letter of submittal should state contractor, contract number, 11 Licensed by Information Handling Servicesc 12 Licensed by Information Handling Services
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1