1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.10 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01.10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 45 00.10 10QUALITY CONTROL SYSTEM (QCS)02/10PART 1 GENE
2、RAL1.1 Contract Administration1.1.1 Correspondence and Electronic Communications1.1.2 Other Factors1.2 QCS SOFTWARE1.3 SYSTEM REQUIREMENTS1.4 RELATED INFORMATION1.4.1 QCS User Guide1.4.2 Contractor Quality Control(CQC) Training1.5 CONTRACT DATABASE1.6 DATABASE MAINTENANCE1.6.1 Administration1.6.1.1
3、Contractor Information1.6.1.2 Subcontractor Information1.6.1.3 Correspondence1.6.1.4 Equipment1.6.1.5 Management Reporting1.6.1.6 Request For Information (RFI)1.6.2 Finances1.6.2.1 Pay Activity Data1.6.2.2 Payment Requests1.6.3 Quality Control (QC)1.6.3.1 Daily Contractor Quality Control (CQC) Repor
4、ts.1.6.3.2 Deficiency Tracking.1.6.3.3 QC Requirements1.6.3.4 Three-Phase Control Meetings1.6.3.5 Labor and Equipment Hours1.6.3.6 Accident/Safety Reporting1.6.3.7 Features of Work1.6.3.8 Hazard Analysis1.6.4 Submittal Management1.6.5 Schedule1.6.6 Import/Export of Data1.7 IMPLEMENTATION1.8 DATA SUB
5、MISSION VIA CD-ROM1.8.1 File MediumSECTION 01 45 00.10 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.8.2 CD-ROM Labels1.8.3 File Names1.9 MONTHLY COORDINATION MEETING1.10 NOTIFICATION OF NONCOMPLIANCEPART 2 PRODUCTSPART 3 EXECUTION- End
6、of Section Table of Contents -SECTION 01 45 00.10 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 45 00.10 10 (February 2010)-Preparing Activity: USACE SupersedingUFGS-01 45 01.10 (January 2008)UNIFIED
7、FACILITIES GUIDE SPECIFICATIONS*SECTION 01 45 00.10 10QUALITY CONTROL SYSTEM (QCS)02/10*NOTE: This guide specification covers the requirements for use of the Quality Control System (QCS) for contract monitoring and administration.Edit this guide specification for project specific requirements by add
8、ing, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should b
9、e directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 Contract Administra
10、tion*NOTE: During preparation of the Project Management Plan, the project delivery team should analyze each project/future contract to decide if use of (QCS) is necessary. Its use will be appropriate for inclusion in most construction and dredging contracts. However, it may not be necessary nor bene
11、ficial to include the (QCS) requirement in small, simple, short duration contracts/delivery orders for construction, or for other contracts where its use would not be beneficial overall.The decision to use or not use QCS should be documented in the project management plan for each SECTION 01 45 00.1
12、0 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-construction project. A district-wide internal Standard Operating Procedure specifying the criteria for QCS use is also recommended. Note that RMS, the Government version, is to be used for a
13、ll construction contracts, including those where QCS is not required.The clauses and sections listed below are closely related to this section and must be coordinated with this section. These clauses and sections should reference Section 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) whenever appropria
14、te and necessary to require use of QCS by the Contractor.- Contract Clause, Schedules for Construction - Contracts- Contract Clause, Payments- Section 01 32 01.00 10 PROJECT SCHEDULE- Section 01 33 00 SUBMITTAL PROCEDURES- Section 01 45 00.00 10 QUALITYCONTROL*The Government will use the Resident Ma
15、nagement System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor must use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The Contr
16、actor module, user manuals, updates, and training information can be downloaded from the RMS web site. This joint Government-Contractor use of RMS and QCS will facilitate electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, tr
17、ack, and electronically share information with the Government in the following areas:AdministrationFinancesQuality ControlSubmittal MonitoringSchedulingImport/Export of Data1.1.1 Correspondence and Electronic CommunicationsFor ease and speed of communications, both Government and Contractor will, to
18、 the maximum extent feasible, exchange correspondence and other documents in electronic format. Correspondence, pay requests and other documents comprising the official contract record will also be provided in paper format, with signatures and dates where necessary. Paper documents will govern, in t
19、he event of discrepancy with the electronic version.1.1.2 Other FactorsParticular attention is directed to Contract Clause, “Schedules for Construction Contracts“, Contract Clause, “Payments“, Section 01 32 01.00 10PROJECT SCHEDULE, Section 01 33 00 SUBMITTAL PROCEDURES, and Section 01 45 00.00 10 Q
20、UALITY CONTROL, which have a direct relationship to the reporting to be accomplished through QCS. Also, there is no separate payment for establishing and maintaining the QCS database; all costs associated therewith will be included in the contract pricing for the work.SECTION 01 45 00.10 10 Page 4Pr
21、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 QCS SOFTWAREQCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make available the QCS software to the Contractor after award of the
22、construction contract. Prior to the Pre-Construction Conference, the Contractor will be responsible to download, install and use the latest version of the QCS software from the Governments RMS Internet Website. Upon specific justification and request by the Contractor, the Government can provide QCS
23、 on CD-ROM. Any program updates of QCS will be made available to the Contractor via the Government RMS Website as they become available.1.3 SYSTEM REQUIREMENTSThe following is the minimum system configuration that the Contractor must have to run QCS:QCS and QAS SystemHardwareIBM-compatible PC with 1
24、000 MHz Pentium or higher processor256+ MB RAM for workstation / 512+ MB RAM for server1 GB hard drive disk space for sole use by the QCS systemCompact Disk (CD) Reader 8x speed or higherSVGA or higher resolution monitor (1024x768, 256 colors)Mouse or other pointing deviceWindows compatible printer.
25、 (Laser printer must have 4 MB+ of RAM)Connection to the Internet, minimum 56k BPSSoftwareMS Windows 2000, XP, Vista or Windows 7QAS-Word Processing software: MS Word 2000 or newerLatest version of: Netscape Navigator, Microsoft Internet Explorer, or other browser that supports HTML 4.0 or higherEle
26、ctronic mail (E-mail) MAPI compatibleVirus protection software that is regularly upgraded with all issued manufacturers updates1.4 RELATED INFORMATION1.4.1 QCS User GuideAfter contract award, download instructions for the installation and use of QCS from the Government RMS Internet Website. In case
27、of justifiable difficulties, the Government will provide the Contractor with a CD-ROM SECTION 01 45 00.10 10 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-containing these instructions.1.4.2 Contractor Quality Control(CQC) Training The use of
28、 QCS will be discussed with the Contractors QC System Manager during the mandatory CQC Training class.1.5 CONTRACT DATABASEPrior to the pre-construction conference, the Government will provide the Contractor with basic contract award data to use for QCS. The Government will provide data updates to t
29、he Contractor as needed, generally by using the Governments SFTP repository built into QCS import/export function. These updates will generally consist of submittal reviews, correspondence status, QA comments, and other administrative and QA data.1.6 DATABASE MAINTENANCE Establish, maintain, and upd
30、ate data in the QCS database throughout the duration of the contract at the Contractors site office. Submit data updates to the Government (e.g., daily reports, submittals, RFIs, schedule updates, payment requests, etc.) using the Governments SFTP repository built into QCS export function. If permit
31、ted by the Contracting Officer, e-mail or CD-ROM may be used instead of E-mail (see Paragraph DATA SUBMISSION VIA CD-ROM). The QCS database typically includes current data on the following items:1.6.1 Administration1.6.1.1 Contractor InformationContain within the database the Contractors name, addre
32、ss, telephone numbers, management staff, and other required items. Within 14 calendar days of receipt of QCS software from the Government, deliver Contractor administrative data in electronic format.1.6.1.2 Subcontractor InformationContain within the database the name, trade, address, phone numbers,
33、 and other required information for all subcontractors. A subcontractor must be listed separately for each trade to be performed. Assign each subcontractor/trade a unique Responsibility Code, provided in QCS. Within 14 calendar days of receipt of QCS software from the Government, deliver subcontract
34、or administrative data in electronic format.1.6.1.3 CorrespondenceIdentify all Contractor correspondence to the Government with a serial number. Prefix correspondence initiated by the Contractors site office with “S“. Prefix letters initiated by the Contractors home (main) office with “H“. Letters m
35、ust be numbered starting from 0001. (e.g., H-0001 or S-0001). The Governments letters to the Contractor will be prefixed with “C“.1.6.1.4 Equipment Contain within the Contractors QCS database a current list of equipment planned for use or being used on the jobsite, including the most recent and plan
36、ned equipment inspection dates.SECTION 01 45 00.10 10 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6.1.5 Management ReportingQCS includes a number of reports that Contractor management can use to track the status of the project. The value
37、of these reports is reflective of the quality of the data input, and is maintained in the various sections of QCS. Among these reports are: Progress Payment Request worksheet, QA/QC comments, Submittal Register Status, Three-Phase Inspection checklists. 1.6.1.6 Request For Information (RFI)Exchange
38、all Requests For Information (RFI) using the Built-in RFI generator and tracker in QCS.1.6.2 Finances1.6.2.1 Pay Activity DataInclude within the QCS database a list of pay activities that the Contractor must develop in conjunction with the construction schedule. The sum of all pay activities must be
39、 equal to the total contract amount, including modifications. Group pay activities Contract Line Item Number (CLIN); the sum of the activities must equal the amount of each CLIN. The total of all CLINs equals the Contract Amount.1.6.2.2 Payment RequestsPrepare all progress payment requests using QCS
40、. Complete the payment request worksheet, prompt payment certification, and payment invoice in QCS. Update the work completed under the contract, measured as percent or as specific quantities, at least monthly. After the update, generate a payment request report using QCS. Submit the payment request
41、, prompt payment certification, and payment invoice with supporting data using the Governments SFTP repository built into QCS export function. If permitted by the Contracting Officer, e-mail or a CD-ROM may be used. A signed paper copy of the approved payment request is also required, which will gov
42、ern in the event of discrepancy with the electronic version.1.6.3 Quality Control (QC)QCS provides a means to track implementation of the 3-phase QC Control System, prepare daily reports, identify and track deficiencies, document progress of work, and support other Contractor QC requirements. Mainta
43、in this data on a daily basis. Entered data will automatically output to the QCS generated daily report. Provide the Government a Contractor Quality Control (CQC) Plan within the time required in Section 01 45 00.00 10 QUALITY CONTROL. Within seven calendar days of Government acceptance, submit a QC
44、S update reflecting the information contained in the accepted CQC Plan: schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.1.6.3.1 Daily Contractor Quality Control (CQC) Reports.QCS includes the means to produce the Daily CQC Report. The Contractor ma
45、y use other formats to record basic QC data. However, the Daily CQC Report generated by QCS must be the Contractors official report. Summarize data from any supplemental reports by the Contractor and consolidate onto the QCS-generated Daily CQC Report. Submit daily CQC Reports as required by SECTION
46、 01 45 00.10 10 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Section 01 45 00.00 10 QUALITY CONTROL. Electronically submit reports to the Government within 24 hours after the date covered by the report. Also provide the Government a signed, printed copy of the daily CQC report.1.6.3.2 Deficiency Tracking.Use QCS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using QC punch list items. Maintain a current log of its QC punch list items in t
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1